Home
|
Job Opportunities
|
Site Map
|
Contact Us
|
Türkçe
ABOUT US
BUSINESS OUTLOOK
PROJECTS
INVESTOR RELATIONS
SOCIAL RESPONSIBILITY
Major & Selected Projects
Power Plants
›
›
Yajva State District Power Plant, Russia
›
Rijnmond Energy Center, The Netherlands
›
Gebze, Adapazarı and İzmir Power Plants, Turkey
›
›
Afşin Elbistan-B Thermal Power Plant, Turkey
›
Bursa Natural Gas Fired Combined Cycle Power Plant, Turkey
Motorways, Bridges & Tunnels
Petrochemicals
Urban Development
Business Centers & High Rises
Public Buildings
Malls & Shopping Centers
Industrial Plants
Home
›
Major & Selected Projects
›
Power Plants
› Gebze, Adapazarı and İzmir Power Plants, Turkey
Gebze, Adapazarı and İzmir Power Plants, Turkey
The InterGen-Enka partnership was awarded the right to build and operate the Gebze Power Plant with a nominal capacity of 1,554 MW, the Adapazarı Power Plant with a nominal capacity of 777 MW and the İzmir Power Plant with a nominal capacity of 1,523 MW, following a Build Own Operate (BOO) tender in 1997. The Bechtel-ENKA Joint Venture was the Turnkey EPC contractor for these three power plants.
Each power island of these natural gas fired combined cycle power plants consists of two combustion turbines/generators; two heat recovery steam generators and one steam turbine/generator. In the Gebze and Adapazarı Power Plants, natural draft dry cooling towers serve each power island, whereas in the İzmir plant, low profile forced draft wet cooling towers were built, using seawater as a cooling medium.
During various times, a total of 12,000 workers have been employed at all three plants. Construction of the Gebze and Adapazarı power plants was completed in 2002, and the İzmir plant was completed in 2003.
›
Build, Own, Operate Scheme
›
Gebze Elektrik, Adapazarı Elektrik, İzmir Elektrik