ENKA A.Þ.  
Home | Job Opportunities | Site Map | Contact Us | Türkçe
ABOUT US BUSINESS OUTLOOK PROJECTS INVESTOR RELATIONS SOCIAL RESPONSIBILITY
Home  ›  PROJECTS  ›  Major & Selected Projects  ›  Power Plants  ›  Gebze, Adapazarý and Ýzmir Power Plants, Turkey

Gebze, Adapazarý and Ýzmir Power Plants, Turkey
The InterGen-Enka partnership was awarded the right to build and operate the Gebze Power Plant with a nominal capacity of 1,554 MW, the Adapazarý Power Plant with a nominal capacity of 777 MW and the Ýzmir Power Plant with a nominal capacity of 1,523 MW, following a Build Own Operate (BOO) tender in 1997. The Bechtel-ENKA Joint Venture was the Turnkey EPC contractor for these three power plants.

Each power island of these natural gas fired combined cycle power plants consists of two combustion turbines/generators; two heat recovery steam generators and one steam turbine/generator. In the Gebze and Adapazarý Power Plants, natural draft dry cooling towers serve each power island, whereas in the Ýzmir plant, low profile forced draft wet cooling towers were built, using seawater as a cooling medium.

During various times, a total of 12,000 workers have been employed at all three plants. Construction of the Gebze and Adapazarý power plants was completed in 2002, and the Ýzmir plant was completed in 2003.
› Build, Own, Operate Scheme
› Gebze Elektrik, Adapazarý Elektrik, Ýzmir Elektrik

Copyright © 2014 ENKA All rights reserved.

Web Design, Consulting