Project Database

No
Company
Project Title                                          
Business Line                       
Continent
Country
Start Date   
Finish Date
Project_Detailed_Description
501ENKASED New USA Embassy Compound - Asuncion, ParaguayCivilSouth AmericaParaguay2017-04-012021-02-01The construction of the Asuncion NEC is a multi-phase project on the existing Embassy compound. Maintaining the continuous operations of the existing Embassy is the highest priority.
Contractor shall provide complete construction services, contract coordination and supervision, including but not limited to the management and construction necessary to meet the requirements of this contract within the established schedules.
500ENKASamawa 750 MW Combined Cycle Power PlantPower PlantAsiaIraqTBDTBDENKA, with its partner General Electric, will design and build the Samawa Combined Cycle Power Plant, which will add 750 MW to the Iraqi Grid. The project is located near Samawa City, 293 km northwest of Basra, in southern Iraq.
The Gas Turbines were purchased by Ministry of Electricity of Iraq as part of Mega-Deal between Government of Iraq and GE and will be handed over to GE-ENKA for installation and commissioning. These units are the last GT’s of the Mega-Deal to be installed. All other materials and equipment shall be purchased and shipped to Iraq by GE-ENKA.
The project will consist of 1 power block, which will produce 750 MW of power at 132 and 400 kV transmission levels. It will include four (4) GE 9E series combustion turbine generators which will be able to fire three (3) types of fuels: The main fuel will be the Heavy Fuel Oil (HFO) and the back-up fuels will be Light Distillate Oil (LDO) and Natural Gas. The design of the equipment will be suitable for operating 24-hours/day, 7-days/week with useful life of 25-years.
The Plant will be the first combined cycle project of that will be owned and operated by Ministry of Electricity. The thermal efficiency will be above 50%, which will help Iraq to save 14 billion cubic meter of natural gas, and 32 million tons CO2 over 25 years.
The financing of the Project shall be arranged by Overseas Private Investment Corporation (OPIC) and Export Credits Guarantee Department of UK Government (UKEF).
The contract is signed on January 2017 and the project is scheduled to be completed within 34 months after commencement.

499ENKADhi Qar 750 MW Combined Cycle Power PlantPower PlantAsiaIraqTBDTBDENKA, with its partner General Electric, will design and build the Dhi Qar Combined Cycle Power Plant, which will add 750 MW to the Iraqi Grid. The project is located near Nasiriyah City, 230 km northwest of Basra, in southern Iraq.
The Gas Turbines were purchased by Ministry of Electricity of Iraq as part of Mega-Deal between Government of Iraq and GE and will be handed over to GE-ENKA for installation and commissioning. These units are the last GT’s of the Mega-Deal to be installed. All other materials and equipment shall be purchased and shipped to Iraq by GE-ENKA. The project will consist of 1 power block which will produce 750 MW of power at 132 and 400 kV transmission levels. It will include four (4) GE 9E series combustion turbine generators which will be able to fire three (3) types of fuels: The main fuel will be the Crude Oil (CO) and the back-up fuels will be Light Distillate Oil (LDO) and Natural Gas. The design of the equipment will be suitable for operating 24-hours/day, 7-days/week with useful life of 25-years.
The Plant will be the first combined cycle project of that will be owned and operated by Ministry of Electricity. The thermal efficiency will be above 50%, which will help Iraq to save 14 billion cubic meter of natural gas, and 32 million tons CO2 over 25 years.
The financing of the Project shall be arranged by Overseas Private Investment Corporation (OPIC) and Export Credits Guarantee Department of UK Government (UKEF).
The contract is signed on January 2017 and the project is scheduled to be completed within 34 months after commencement.
498ENKAMultifunctional Medical Center in GelendjikCivilEurasiaRussian Federation2016-10-012017-09-30ENKA and Rosneft has signed a new contract for the construction of a Multifunctional Medical Complex located in Gelendzhyk, Russian Federation. Within the contract’s scope of Works, full construction of Multifunctional Medical Center, New Laundry and Multi-flat Residential House will be performed by the ENKA Team. Furthermore, supply of the equipment and materials will also be carried out by ENKA. Planned as a fast track on-site construction, the Project is scheduled to be completed in September, 2017.
497ENKASED New USA Embassy Compound - Dhahran, Saudi ArabiaCivilAsiaSaudi Arabia2016-10-042019-10-01
496ENKASED New USA Embassy Compound - Hyderabad, IndiaCivilAsiaIndia2016-08-232018-08-30
495ENKASED New USA Embassy Compound - Sri LankaCivilAsiaSri Lanka2016-08-012020-08-01The Contractor shall complete all work to design and construct the SED NEC, including the furnishing all professional services, labor, material, equipment and services, unless otherwise specified herein, required under this contract for the following firm fixed price and within the time specified herein. This price shall include all labor, materials, overhead insurance and fees, profit, and all costs for project General Requirements.
494ENKAKashagan Oil Field Devel. Offshore Construction Works (Contract NCOC N.V. / 2016-0001)Oil & Gas, PetrochemicalsAsiaKazakhstan2016-05-052017-02-01Early Works, Site Preparation, Load-In, Installation, Hook-Up, Mechanical Completion, Pre-Commissioning and Commissioning of Topsides for Ep Clusters 3 and 4
493ENKAKashagan Oil Field Devel. Offshore Construction Works (Contract 1103298)Oil & Gas, PetrochemicalsAsiaKazakhstan2016-03-212016-09-01Offshore Civil Works including trech excavation between A and D island and some modification works on A and D Island.
492ENKASenimdi Kurylys Master Contractor Services (Contract 1131939)Oil & Gas, PetrochemicalsAsiaKazakhstan2013-12-012018-11-01Construction of infrastructure of off plot works such as piping, pipelines, civil, electro-mechanical and instrumentation and maintenance works of the plant and camp
491ENKASED New USA Embassy Compound - TurkmenistanCivilAsiaTurkmenistan2014-11-012018-07-01Construction of a New Embassy Compound of the USA on a land of approximately 70,000 m². New Embassy Compound consists of NOB, CAC’S, Utility Building, WHE, REC and MSGQ expansion. The project includes site utilities, landscaping, roads, paving and building’s civil, architectural, electrical, mechanical, labor, material, equipment and services
490ENKADuhouk 1500 MW CC Power Plant Conversion - EPCC (under suspension)Power PlantAsiaIraq2013-10-102018-05-01ENKA was awarded a contract by Mass Group Holding Ltd. (MGH) to convert an Independent Power Project (IPP) from simple cycle to combined cycle technology in Northern Iraq, 40 kilometers north of the City of Duhok. The existing simple cycle at the Duhok Gas Power Station was developed by MGH with a capacity of 1,000 MW with eight GE - 9E gas turbines. By using two steam turbines manufactured by GE, it is to be converted into a combined cycle power plant with additional capacity of 500 MW. The facility will be designed for a working principle of 7 days per week and 24 hours per day with an efficient operating life of 30 years.The existing simple cycle power plant is designed to work with natural gas as the primary fuel source and diesel as a secondary source. In the framework of converting this plant into combined cycle technology, all the necessary arrangements is to be performed accordingly. The Duhok Combined Cycle Power Plant is to be capable of being dispatched for any combination of base-load operation throughout its design service life. A direct Air Cooled Condenser (ACC) system is to be used for the cooling system which would consist of two blocks each with approximately 40 cells. The contractual work scope includes a 400kV switchyard for which the interconnection point is to be a dead-end structure to be erected by the Ministry of Electricity.
489ENKASouth Caucasus Pipeline Expansion (SCPX) Early Works and Facilities ProjectOil & Gas, PetrochemicalsAsiaGeorgia2014-02-072018-03-01The South Caucasus Pipeline (SCP) is a natural gas pipeline built to export Shah Deniz gas from Azerbaijan to Georgia and Turkey. The 42” pipeline starts from the Sangachal terminal near Baku and follows the route of the Baku-Tbilisi-Ceyhan (BTC) crude oil pipeline through Azerbaijan and Georgia to Turkey, where it is linked to the Turkish gas distribution system. The length of the pipeline is 691 km, with 443 km in Azerbaijan and 248 km in Georgia and the system design capacity is 7 bcma. The expansion of the South Caucasus Pipeline (SCPX) is part of the Shah Deniz Full Field Development Project. This expansion involves the laying of new pipeline across Azerbaijan and the construction of two new compressor stations and a Pressure Reduction and Metering Station (PRMS) in Georgia. This will triple the gas volumes exported through the pipeline to over 20 billion cubic metres per year. ENKA (with its Joint Venture partners Bechtel) is contracted by SCP Co. for all early works required and construction of Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81) in Georgia. The scope also includes the construction of a 15km Access Road to CSG-2 and brownfield modifications within the existing facilities of the SCP Pipeline.
488ENKAPrishtine – Hani I Elezit (Route No:6) MotorwayInfrastructureEuropeKosovo2014-07-012018-12-01In July 2014, the Bechtel-ENKA General Partnership and the Ministry of Infrastructure of the Republic of Kosovo entered into a 600 million Euros contract for the construction of the 65-kilometer motorway that forms a segment of the corridor extending from the capital city Pristina to Han-i Elezit on the border with Macedonia and adjoins the Route 7 Motorway Project, connecting the southwest of the capital city Pristina and the southern part of the country passing through Lipjan, Babushi, Ferizaj, Doganaj, Kacanik and Han-i Elezit. The motorway project is an equal partnership with the American company, Bechtel. A 42-month project duration is forecasted, including design and construction works. Upon quick completion of the mobilization stage, works on a 5-kilometer section were started in August 2014. Work is being performed all over the 14 km territory allotted by the customer, with the number of personnel involved continuing to grow. At the same time, the design work is being rapidly executed. The motorway has been designed as a 2x2 lane motorway with a total platform width of 27.2 meters. It is designed according to TEM standards, and provides 8 crossroads. While the design work was being carried out, a 20-kilometer section was completed. Meanwhile on other sections, field and office works are underway. In accordance with the completed preliminary design study, the scope of the project work also consists of a total of 11.6 million m³ of excavations, 8.6 million m³ of back fill, 300 thousand m³ of concrete, 864 thousand m³ of subgrade material and cement mixture, 668 thousand tons of asphalt, and 130 000 m of pipe drainage. With regards to the topography of a specific 20-kilometer section of very rugged terrain, in accordance with the preliminary plan, the maximum excavations and back fill are estimated as 61 m and 48 m. The project includes a total of 6 viaducts or bridges with heights varying from 10 m to 61 m, with the longest bridge span at 440 m. This project does not merely serve to connect Kosovo and Macedonia, but through its integration with the Route 7 Motorway, it will connect Kosovo, Macedonia, Montenegro and Albania. Upon completion of the Route 7 Motorway, it will be easier to travel from Kosovo to the Durres Sea Port in Albania. The Route 6 Motorway will also expand transportation access to Greece, Bulgaria and Turkey via Macedonia. Facilitating increased freight and passenger transportation from Turkey, Bulgaria and Greece through Kosovo to central Europe, it will serve as a useful alternative to Corridor 10 and is expected to increase the trade volume of Montenegro and Bosnia as a result. Companies from Kosovo and Albania have found opportunities to increase their experience performing large scale works within the framework of the R7 Motorway project.
487ENKAFGP MultiWell Pads Civil Installation Works (Contract 1310153)Oil & Gas, PetrochemicalsAsiaKazakhstan2015-07-172017-12-31Site preparation, fencing, civil works and underground piping associated with the Multi Well Platform portion of the FGP Project.
486ENKABaghdad 1500 MW Combined Cycle Power Plant - BesmayaPower PlantAsiaIraq2014-10-012017-10-25The Ministry of Electricity of Iraq contracted Mass Group Holding Ltd. to build a mega power plant to provide the state capital with reliable and sustainable electrical power. The plot selected for the plant is located to the south east of Baghdad around 25 km from the centrum. Besmaya Combined Cycle Project will consist of 2 power blocks which will produce 1,500 MW of power at 400 kV transmission level. Each block will consist of two (2) GE 9F series combustion turbine generators which may be operated in open cycle or combined cycle via the use of a bypass stack. In combined cycle mode, the exhaust from the combustion turbines will be directed to Heat Recovery Steam Generators and the steam produced will drive a steam turbine generator. Waste heat will be rejected using a combination of fin-fan coolers and wet cooling tower equipment. Other facilities which will support the power block operation include oil unloading, storage and transfer system; fuel gas conditioning and pressure reduction; plant electrical system including generator step-up transformers; main control system – DCS; water treatment plant; and administrative/O&M areas. The Plant is scheduled to start producing power from the Simple Cycle phase in October 2016.
485ENKAWest Qurna-I Initial Oil Train (IOT) ProjectOil & Gas, PetrochemicalsAsiaIraq2015-08-162017-10-15West Qurna is one of the largest oil fields in Iraq with an estimated 43 billion barrels of recoverable reserves. In January 2010, ExxonMobil Iraq Limited (EMIL), an affiliate of Exxon Mobil Corporation, signed an agreement with the South Oil Company of the Iraq Ministry of Oil to rehabilitate and redevelop the West Qurna I field. Located approximately 50 kilometers north-west of Basra, the Field currently produces around 400 kbopd through existing facilities located at DS-6, 7 and 8. EMIL has envisaged and initiated the Initial Oil Train (IOT) Project to add oil production facilities capable of safely producing and exporting an additional 100,000 stock tank barrels of crude oil from the Field. The Initial Oil Train Facility shall be designed to process full well stream fluids from the production wellhead area and separate them into associated gas, untreated produced water, and stable product crude for export. IOT shall be constructed adjacent to existing DS-8.
484ENKAKashirskaya Multi-Functional Trade CenterCivilEurasiaRussian Federation2015-10-062017-12-01Delivering a modern community hub for the Moscow Region, Kashirskaya Shopping Center features a complex of public amenhties, conveniently blending retail, fitness, cinema, entertainment, F&B and hypermarket. The project aims to create a pedestrian-friendly neighborhood destination surroundings of waterfronts and landscape. Organic elements are drawn into the project to create a place of that celebrates its existing natural surroundings of waterfronts and landscape. Organic elements are drawn into the project to create a place of comfort and leisure, locally inspired and linked to its environment. The site's easy accessibility, connection to local parks, and vibrantly visible public spaces ensures abundant activity and interaction within the project.
483ENKASenimdi Kurylys CSC EPC Onshore Project (Contract 1134328)Oil & Gas, PetrochemicalsAsiaKazakhstan2014-07-292017-07-01Tengizchevroil awarded to Senimdi Kurylys LLP (SK) the contract for Onshore Procurement and Construction activities for CSC Project. The CSC Project consists of engineering procurement and construction of new crude oil storage tanks, switching manifolds and export pumps along with all their associated piping systems, utilities and control systems. SK had completed geothecnical investigation, site stripping, hauling of fill material, ground preparation for temprorary site facilities and installation of a dining hall and office buildings by the end of December 2014.
482ENKASenimdi Kurylys CSC EPC Offshore Project (Contract 1206904)Oil & Gas, PetrochemicalsAsiaKazakhstan2014-07-292017-07-01Tengizchevroil awarded to Senimdi Kurylys LLP (SK) the contract for Engineering and Offshore Procurement activities for CSC Project. The CSC Project consists of engineering procurement and construction of new crude oil storage tanks, switching manifolds and export pumps along with all their associated piping systems, utilities and control systems. SK had completed geothecnical investigation, site stripping, hauling of fill material, ground preparation for temprorary site facilities and installation of a dining hall and office buildings by the end of December 2014.
481ENKANew USA Embassy Compound, The Hague - NetherlandsCivilEuropeNetherlands2014-03-012017-06-01Construction of a New Embassy Compound of the USA on a land of approximately 40,468 m². New Embassy Compound consists of NOB, CAC’S, Utility Building, SPX, SDA and MSGQ expansion. The project includes site utilities like perimeter wall and fences, pond, canals and pedestrian & vehicular bridges,landscaping, roads, paving and building’s civil, architectural, electrical, mechanical, closed-loop geothermal system, labor, material, equipment and services
480ENKASED New USA Embassy Compound - AfghanistanCivilAsiaAfghanistan2011-03-012017-03-01Construction of a Standard Embassy Design New Embassy Compound of the USA on a land of 85,924 m². New Embassy Compound consists of NOBX, CAC’S, 2 PARKING, GSM, SDA total 6 buildings and MSGQ expan-sion & plant nursery in Kabul based on Standard Embassy Design and standards provided by owner during tender stage. The project includes site utilities, landscaping, roads, paving and building’s civil, architectural, electrical, mechanical, labor, material, equipment and services
479ENKAUS Embassy Moscow Annex Office Building - Russian FederationCivilEurasiaRussian Federation2013-12-012017-03-01Construction of a seven-story mixed-use office and residential building totally 17.85 GSM. New building consists of 4,200 GSM parking garage below grade and also an additional concourse level. Moreover the project consists demolishing of townhouse units, underground garage, utilities, concourse level support areas, two-story Spoede office building and reconstruction of walls, facilities, utilities, site lighting, and site work upgrades throughout the entire Embassy compound
478ENKAKashagan Oil Field Development Equipment Rental (Various Contracts)Oil & Gas, PetrochemicalsAsiaKazakhstan2013-03-202016-12-01Chartering of Kashagan project owned vessels to charterers in Kashagan and Filanovsky field
477ENKADevelopment and completion of the design and building of the Muscat International Airport, Main Contract 3CivilAsiaOman2011-02-232016-12-01The Sultanate of Oman’s Ministry of Transport and Communication awarded Main Contract 3 (MC3) to the consortium composed of Bechtel, ENKA and Bahwan, Bechtel ENKA Joint Venture has a 77% share in the consortium, where Bechtel & ENKA shares are equal in the Joint Venture. Bahwan Engineering Company is one of the biggest construction companies in the Sultanate of Oman and specializes in mechanical and electrical works.Development of the Muscat International Airport Project is the largest construction project in the Sultanate of Oman. The development works have been divided into eleven main contracts and standard national contracts. Main Contract 3, the design development and construction of a passenger terminal building, is the largest in scope.The overall scope of the project is to design and build a terminal building, multi-storey parking, land side roads and elevated roads, support buildings, terminal equipments (partial) for Muscat International Airport. The capacity is 12 million passengers per annum (mppa) extendable to 24 mppa and 36 mppa. The site for the new airport is located adjacent to and on the north and east sides of the existing Muscat International Airport, approximately 35 km to the west of Muscat in the Seeb Region of the northern part of the Sultanate of Oman. Buildings and Structures: Passenger Terminal Building: Closed Area – 247,633 m². North, South and West Piers Approx. 111,633 m². Traffic Concourse Approx. 71,094 m². North and South Multi storey Car park, Approx. 116,318 m². North and South Multi storey Forecourt Buildings and Lift Building, Approx. 35,615 m² . Forecourt Plaza, Approx. 37,144 m². Other Buildings (Provisional Sum) such as Guardhouse, VIP, OAMC, Airside Ground Handler Workshop, Staff Amenities Building, Maintenance Yard Gate Building, Waste Management Building, Fuel into Plane Operators Building, Fit out for 4 star Airside Hotel (90 rooms). Access ramps and Bridges Surface Car Parking and Associated Roads, Roads and Car park Areas, Hard landscape around Buildings, Counters and Desks, Mechanical and Electrical Systems.
476ENKASED New USA Embassy Compound - MauritaniaCivilAfricaMauritania2014-01-012016-10-01Construction of a New Embassy Compound of the USA on a land of approximately 42,578 m². New Embassy Compound consists of NOB, CAC’S, Utility Building, WHE, REC and MSGQ expansion. The project includes site utilities, landscaping, roads, paving and building’s civil, architectural, electrical, mechanical, labor, material, equipment and services.
475ENKAKashagan Oil Field Development Offshore Construction Works (Contract 1037071)Oil & Gas, PetrochemicalsAsiaKazakhstan2015-04-202016-10-01Modification Works on Riser Island D-Complex (Pipeline Replacement)
474ENKAKashagan Oil Field Development Project, Marine Channel Works (Contract CatRo EN-VO-001)Oil & Gas, PetrochemicalsAsiaKazakhstan2014-10-012017-07-01Chartering of Vessels, Provision of Project & Marine Fleet Management and using of ENKA Marine Base. Supply and Installation of Mooring Dolphins Supply of Navigation Buoys
473ENKASulaymaniyah 1500 MW Combined Cycle Power Plant ProjectPower PlantAsiaIraq2013-07-012016-07-27MGH - Mass Group Holding Ltd. signed an EPC contract with ENKA to convert its Sulaymaniyah Independent Power Project (IPP) from simple-cycle to combined-cycle technology.The existing simple cycle Sulaymaniyah Gas Power Station was developed by MGH - Mass Group Holding Ltd. with a capacity of 1,000 MW with eight GE - 9E gas turbines. The combined-cycle gas turbines (CCGT) conversion will add 500MW to the project making the overall capacity of 1500 MW, by using steam turbines manufactured by GE. Sulaymaniyah Combined Cycle Power Project is designed to work on two types of fuel – natural gas as the primary and diesel as the secondary source and will utilize the exhaust heat produced by the existing Sulaymaniyah Gas Power Station. Each block consists of four HRSGs, a GE steam turbine generator set, and a 40-cell Air Cooled Condenser (ACC) System. The Provisional Acceptance of the Project was achieved on 27 July 2016.
472ENKAP-230 Joint HQ/JOC Facility, Camp Lemonnier , DjiboutiCivilAfricaDjibouti2014-02-012016-05-01Construction of a combined 4,728 m² headquarters (HQ) buildings and CJTF Joint Operation Center (JOC) for command and control. The facility will be a multistory facility on a concrete foundation and it will consist of administrative space, open and private offices, multi-purpose conference rooms, entrance lobby, toilets, and break rooms
471ENKASenimdi Kurylys Master Contractor Services (Contract 1224036)Oil & Gas, PetrochemicalsAsiaKazakhstan2014-04-242016-12-01The SGE Project aimed at improving both capacity and reliability of the existing Second Generation Plant (SGP) facility to achieve additional oil production without increasing the production of associated sulphur products. Scope includes; piling, civil, structural, piping. mechanical, heavy lift assistance, electrical and instrumentation works.
470ENKABazyan 500 MW Simple Cycle Power PlantPower PlantAsiaIraq2014-09-012016-01-15Qaiwan Group awarded ENKA on 28th of August 2014 to build the first phase of Bazyan Combined Cycle Power Plant, which is the Simple Cycle Power Plant portion. The project was built ready for conversion to a combined cycle power plant so all BOP facilities e.g. water treatment plant, 132 kV AIS switchyard, electrical control room facilities were under simple cycle scope. In addition demonstration of parallel operation of 4 Gas Turbines with the grid at the required net output as well as preparation of O&M manuals were also included under ENKA’s responsibility. The design is prepared to support plant operation with two types of fuel – liquid fuel gas and liquid fuel oil. As-built documentation and 12 months warranty services were also be provided by ENKA. The Provisional Acceptance of the Project was achieved on 15 March 2016.
469ENKASenimdi Kurylys Master Contractor Services (1155538)Oil & Gas, PetrochemicalsAsiaKazakhstan2013-12-012015-11-08Construction of infrastructure of off plot works such as piping, pipelines, civil, electro-mechanical and instrumentation and maintenance works of the plant and camp
468ENKAErbil 1,500 MW Combined Cycle Power Plant ConversionPower PlantAsiaIraq2012-04-072015-10-17MGH - Mass Group Holding Ltd. signed an EPC contract with ENKA to convert its Erbil Independent Power Project (IPP) from simple-cycle to combined-cycle technology.The primary Erbil Gas Power Station was developed by MGH - Mass Group Holding Ltd. as a simple-cycle project with a capacity of 1,000 MW which is Iraqi Kurdistan’s largest power plant. The Plant is located about 20 km south of the city of Erbil, Kurdistan Region of Iraq. Erbil Gas Power Station had eight GE - 9E gas turbines at the beginning of the project. Four of them were built in 2009 and the other four gas turbines have been recently completed. All were under operation during project execution. The combined-cycle gas turbines (CCGT) conversion by ENKA added 500MW to the project by using steam turbines manufactured by GE.The Provisional Acceptance of the Project was achieved on 17 October 2015.
467ENKABerezovskaya Coal Fired Power PlantPower PlantEurasiaRussian Federation2012-06-012015-09-01Berezovskaya Coal Fired Power Plant Project consisted of construction of the 3rd power block with the capacity of 800 MW to increase the overall plant capacity to 2400 MW. The first and the second blocks were built and put into operation in 1988 and 1991 respectively. The project for the construction of the third block went underway at the beginning of 1990s however was halted due to the collapse of the Soviet Union. E.ON acquired the Berezovskaya power station in 2007, with the intention of resuming its expansion. The Project commenced in 2011, included the full construction of a coal fired 800 MW power block (except the main building itself which was already constructed along with 1st and 2nd power blocks) including the boiler, turbine, air preheaters as well as relevant piping, auxiliary equipment, supporting steel structures, dust/gas/air ducts, strengthening of the main building structures, renovation of the building façade. Energoproekt of Russia was initially selected as the EPC contractor, however later in the project, E.ON Russia took the responsibility and self-managed the project until the end.
466ENKAKuntsevo Multifunctional Trade & Business CenterCivilEurasiaRussian Federation2011-04-012015-08-28Since ENKA has a long-term commitment in the Russian commercial real estate market, a decision was made to redevelop its existing shopping malls. The shopping mall “Kapitoly-Kuntsevo,” which was put into operation in 1997, is the first to be newly constructed as a mixed–use project. The owner, ENKA TC, awarded the contract for the re-development project to ENKA Construction in April, 2011. The existing shopping center, comprising an area of 19,400 m², was demolished and rebuilt as a modern shopping center. Following its completion, the project is expected to become a synergistic destination for the citizens of Moscow to share unique experiences rooted in the connection of nature, art and urban life. After receiving the construction permit from the related Moscow governmental organizations, replacement of the existing infrastructure utilities started at the beginning of April, 2011, and the demolition of the existing shopping center began in July, 2011, followed by the works for the diaphragm wall and the permanent utilities.
465ENKAErbil Training Center Project - EPCCCivilAsiaIraq2013-12-012015-06-01Training center is situated within the boundaries of the Erbil Combined Cycle Power Plant. EPC Contract of the training center covers the connection roads, parking areas, water feature and landscaping as well. In addition to civil, structural, architectural, mechanical and electrical works all audio, video and automation systems e.g. smart boards, lecture capturing systems, lighting control, energy management and HVAC integration systems will also be designed, purchased and installed as per the requirements. The project covers also a solar water heater system
464ENKAConference Center Project at the City of DemocracyCivilAfricaGabon2013-06-012015-03-01ENKA, under a contract signed with the Presidency of the Gabonese Republic, undertook the construction of the Conference Center at Libreville, Gabon. The project was designed by leading engineering and architectural companies from the United States.The design of the structure can be described as a circular structural steel building with various harmonious geometric shapes. From the sloping roof, a clean panoramic view of Libreville is enjoyed. The project’s scope consists of the construction of meeting rooms and five auditoriums. With the use of special gardening and sprinkler systems, Gabon’s natural habitat and rainforests are emphasized. Environmentally friendly design, water recycling, use of natural ventilation, solar light and the ability to take advantage of shadow are the main priorities and architectural concerns on this project. Though scheduled for completion in the first half of 2015, financial issues experienced by the Gabonese Government resulted in the contract being terminated amicably.
463ENKAEsentai Park - Residence Buildings B and C, Complementary WorksCivilAsiaKazakhstan2013-06-032014-09-01Electrical, Mechanical and Finishing Works of the Esentai Residentials B and C, each having 3+22 floor in Almaty, Kazakhstan
462ENKAConstruction of the Mausoleum, Mosque, Library and MuseumCivilAfricaGabon2013-04-012014-12-01ENKA signed a contract with The Presidency of the Gabonese Republic in 2012 for the construction of the Mausoleum, Mosque, Library and Museum at Franceville, Gabon. The scope of ENKA’s work for the Mausoleum Project consisted of partial design work, procurement and construction for the Mausoleum, Mosque, Museum, Library and other supporting buildings and structures. The Mausoleum Project is dedicated to the previous president of the Gabonese Republic, El Hadj Omar Bongo Ondimba. Architectural designs were drawn up by the Tunisian company, Atelier 6.
461ENKAPresidential Palace Project at the City of DemocracyCivilAfricaGabon2013-05-012014-12-01ENKA, under the contract signed with the Presidency of the Gabonese Republic, undertook the construction of the Presidential Palace at Libreville, Gabon. The project, with a total 17,934 m² construction area, consists of the work for the presidential palace where the president will reside, the building where the president would receive guests and the Porte Cochere (primary palace entrance). In addition to these 3 buildings, the construction of a music studio, pool Cabana, guest house and mechanical room are included within the project plans. Initially, the project was planned for completion in the first half of 2015. However, due to financial issues experienced by the Gabonese Government the contract was terminated amicably.
460ENKAUfa Perinatal Medical Center ProjectCivilEurasiaRussian Federation2013-04-012014-10-01The project has 7-floor plus basement and is a maternity hospital consisting of 33.300 m² of construction area. The project was completed 6 months ahead of the contract schedule and the hospital has been put into operation following the hand over and opening ceremony held on 31 October 2014. Ufa Perinatal Medical Center was designed as a modern health complex providing a family-oriented alternative for inpatient health rehabilitation for all stages of recovery. The hospital has a total of 95 beds, 51 of which are in the physiology, pregnancy pathology, and observation units of the obstetrics center, with the remaining 44 beds devoted to the rehabilitation, neonatal pathology, gynecology, in vitro fertilization (IVF) and inpatient units of the neonatal center.The hospital has an outpatient diagnostic center, laboratory and a physiotherapy center with a capacity of 100 patient visits per day for children and 150 patient visits per day for adults. The hospital covers an area of 4.22 hectares and is located in the Oktyabrsky District in the city center of Ufa, between Oktyabrskaya and Salavat Yulaev Mendeleev streets. The hospital was constructed as two main blocks, with Block A serving as the main medical center and Block B functioning as the premises for the management and the kitchen facilities. These two blocks are connected by a passage on each floor and have been designed with Level-2 fire-resistance classification.
459ENKASergiev Posad Multifunctional Shopping CenterCivilEurasiaRussian Federation2013-04-112014-09-01The shopping mall “Kapitoly – Sergiev Posad” located in Sergiev Posad, Novouglichskoye shosse. The project has 40,100 m² land area and 12,580 m² building area and has an open parking lot of 708 vehicles capacity. In addition to the supermarket and retail stores, the shopping mall hosts a cinema and an entertainment center along with a children playground and a food court including several restaurants & cafes. Shopping center is designed with high quality building materials and provided with everything necessary for a comfortable stay of visitors and employees of the center. Following the completion of the project, it will be one of its kind in the city
458ENKATANAP - Trans Anatolian Natural Gas Pipeline Project - Engineering ServicesOil & Gas, PetrochemicalsEurasiaTurkey2013-05-012014-08-01Bechtel-ENKA Joint Venture has been awarded an engineering contract by TANAP Doğalgaz Iletim A.Ş. TANAP is a buried natural gas pipeline system icnluding all of the above and sub ground facilities with a total length of 1,950 kilometers. The project consists of the pipeline starting from the Turkish-Georgian border which then crosses 21 Turkish provinces ending at the Turkish-Greek border. It also includes facilities such as compressor stations, metering stations, off-take stations, block valve stations, SCADA, telecom and control systems, and other related equipment and installations inside Turkey. The pipeline dimensions, by design are: 56'' from Georgian border to Eskişehir and 48'' from Eskişehir to the Greek border. When operating at high flow capacity, the pipeline system will transport 31 billion m³ of natural gas annually, thus meeting its required specifications. From mid-2014, Work Order No.1 including FEED works on the TANAP Project were successfully completed. The scope of the work included the endorsement of the design basis, FEED survey, permits, land acquisition activities and providing support for procurement of long lead items and construction contractor's tenders. In this context, ENKA has a strategic contribution to the project as a local partner of the engineering contractor Bechtel and played a key role in the completion of FEED for the pipeline project with its local resources. ENKA worked together with Bechtel in the main office provided by TANAP in Ankara. Bechtel's London and Houston Offices have also supported the engineering activities of the project.
457ENKAWest Qurna-2, Gas Treatment, Power Generation & Distribution ProjectPower PlantAsiaIraq2011-12-202014-07-21West Qurna – 2 is a giant oil field in Iraq and the second largest undeveloped field in the world in terms of its hydrocarbon reserves. Recoverable reserves contained in two major formations, Mishrif and Yamama, are estimated at 13 billion barrels. In 2009, a consortium lead by LUKOIL won a tender for the development of the field. As part of the oil field development, Lukoil Mid-East Limited, the lead operator on behalf of the operating consortium has envisaged a Gas Turbine Power Plant (GTPP) to supply power to all oil production facilities. GTPP Project scope consisted of engineering, procurement, construction, commissioning and start-up of a 3x42 MW Simple Cycle Power Generation Plant and Power Distribution System. Project included three (3) GE MS6001B API Class Heavy Duty Dual Fuel Gas turbine Generators-Simple Cycle 42 MW each at ISO conditions, associated balance of plant, a gas treatment and compression system, a liquid fuel unloading, storage and distribution system, 33kV/132kV GIS switchgear and yard, power management system, buildings, utilities and infrastructure.
456ENKASED New USA Embassy Compound (terminated) - Papua New GuineaCivilAustraliaPapua New Guinea2012-03-012014-07-01The new embassy compound in Port Moresby, Papua New Guinea, is located in the area of waterfront development called Harbour City, on a 7.26 acre site. Construction of a Standard Embassy Design New Embassy Compound of the USA on a land of 29,380 m². The new complex would provide secure, safe, and functional facilities for approximately 50 embassy employees. The project includes a new office building, main compound access control, a recreational building, the support annex, service building, and a pool.
455ENKASED New USA Embassy Compound - Dominican RepublicCivilAmericasDominican Republic2011-01-012014-05-01The new embassy compound in Santo Domingo includes the new office building, main consular and service compound access control facilities, the support annex, the marines’ security guard quarters, a utility building and a swimming-pool. The New Embassy Compound consists of NOB, CAC’S, MSGQ, UTL, SPX total 8 buildings in Santa Domingo based on Standard Embassy Design and standards provided by owner during tender stage. The project includes site utilities, landscaping, roads, paving and building’s civil, architectural, electrical, mechanical, labor, material, equipment and services.
454ENKAStructural Steel, Mechanical and E&I Works of Khabarovsk RefineryOil & Gas, PetrochemicalsEurasiaRussian Federation2012-01-012014-04-30The Khabarovsk Refinery Hydroprocessing Project consists of a major expansion of the existing Khabarovsk refinery to increase plant capacity, improve performance and address international and Russian requirements to reduce sulphur contents in kerosene and diesel products. The Work included a new combined Hydrocracking and Hydrotreating Unit, Hydrogen Unit, Amine Recovery and Sour Water Stripper Unit and Sulphur Recovery with Tail Gas Treatment and a Catalytic Reformer revamp. The Work also included associated utilities and offsites together with the associated upgrades and infrastructure modifications, interconnecting pipe racks, supporting facilities for feedstock supply and storage and product storage. Technicas Reunidas of Spain was selected as the EPC contractor by the Owner.
453ENKASenimdi Kurylys Construction Services (Contract 844780)Oil & Gas, PetrochemicalsAsiaKazakhstan2011-06-012014-02-01Construction of infrastructure of off plot works such as piping, pipelines, civil, electro-mechanical and instrumentation and maintenance works of the plant and camp
452ENKAMoscow City Plot 12 (Euroasia Tower)CivilEurasiaRussian Federation2006-04-012013-12-01The Plot 12 mixed-use business center in MIBC "Moscow City" is a high-rise consisting of a class "A" office and residential area, as well as a podium.Its high-rise section has 74 floors, reaching a total height of 302 m above ground. The five underground floors are for parking and technical premises. The 3,000 mm thick, 10,000 cubic meter raft foundation under the tower rests on 1,500 mm diameter piles 25 m in length, while 1,200 mm diameter piles 18 m in length are used elsewhere. Hot rolled profiles and plates, purchased from European steel mills, have been fabricated at Cimtas’s Gemlik Works and transported to Moscow via river vessels. A self-climbing formwork system for the casting of the core structures is utilized
451ENKAMorine - Merdare (Route No:7) Motorway - (25939)InfrastructureEuropeKosovo2010-04-122013-12-01In April 2010, the Bechtel-ENKA General Partnership and the Ministry of Transport and Communications of the Republic of Kosovo entered into the contract for the construction of the 78-kilometer motorway that is a part of the corridor extending from Vermice on the border with Albania to Merdare on the Serbian border, and connects southwestern Kosovo with the northeastern region, passing through Prizren, Suhareka, Malisheva, Pristina and Leban. In November 2013 it was handed over to the customer. With this motorway project, ENKA was honoured with the “Best Global Project” award in the “Motorways and Roads” category of the “Global Best Projects Competition, 2013” which was organized by Engineering News Records (ENR). Furthermore, the project was awarded with the “Program Management” award of the “Global Road Achievement Awards 2012” by the International Road Federation; with the Colossus award for “Outstanding Achievements in Transportation / Highway Projects” in the “Best Ongoing Project” category by the Croatian Chamber of Civil Engineering and also with the local “Green Print” award for environmental awareness and sustainability applications pioneered across Kosovo and the “Innovation” award under the “Borrow Haulage Management System” category. Infrastructure Route 7 Motorway (Morina Merdare Motorway Project).
450ENKAGreenfield Works - MEI (Mechanical, Electrical, Instrument and Telecommunication) Works for Majnoon Oil Field DevelopmentOil & Gas, PetrochemicalsAsiaIraq2011-07-292013-12-01Majnoon is one of the richest oil fields in the world with an estimated 38 billion barrels of oil in place located 60 km (37 mi) north of Basra City, in southern Iraq. In January 2010, the Iraqi Ministry of Oil awarded Shell, Petronas and Missan (state owned company) a 20-year contract to provide technical assistance in the development of the Majnoon field. Shell Iraq Petroleum Development (SIPD) B.V, envisaged a two phase development for the field. Phase I consisted of reaching First Commercial Production (FCP) and Phase II focused in the development of the full field (FFD). As part of First Commercial Production, a new 100k bopd Central Processing Facility (CPF) composed of 2x50k bopd trains, four new well pads, various new wells, and storage facilities were planned.
449ENKABrownfield Works for Majnoon Oil Field DevelopmentOil & Gas, PetrochemicalsAsiaIraq2012-07-012013-12-01Majnoon is one of the richest oil fields in the world with an estimated 38 billion barrels of oil in place located 60 km (37 mi) north of Basra City, in southern Iraq. In January 2010, the Iraqi Ministry of Oil awarded Shell, Petronas and Missan (state owned company) a 20-year contract to provide technical assistance in the development of the Majnoon field. Shell Iraq Petroleum Development (SIPD) B.V, the lead operator on behalf of the operating consortium, has envisaged a two phase development for the field. Phase I consisted of reaching First Commercial Production (FCP) and Phase II focused in the development of the full field (FFD). As part of Phase I, a number of surveys have been carried out to assess the status of the existing process facilities, namely DS-1, DS-2 and associated wells, and several work packages were developed to rehabilitate them to their original design intent of 100k bopd. In addition to the rehabilitation works, DS-1 and DS-2 were planned for various debottlenecking upgrades to increase the production capacity to 120k bopd. Project consisted of implementation of all rehabilitation and upgrading work packages.
448ENKAMoscow City Plot 12 Shell and Core Works Addendum ContractCivilEurasiaRussian Federation2012-06-142013-12-01Mechanical, electrical, roof insulation, limited architectural works and continue with the supply, installation and commissioning of lifts and escalators. Shell & Core works
447ENKAPlot 13 Reinforced Concrete Works of “The Vostok Tower”, MIBC Federation TowersCivilEurasiaRussian Federation2013-02-012013-12-01Reinforced concrete works “The Vostok Tower”, MIBC Moscow City, Plot 13 between the floors no.61 (elev. + 222.032) and no.86 (elev. +315.279) inclusive (~14,277 m³)
446ENKALeningradsky Tunnel Project (Section 33-34-39-40)InfrastructureEurasiaRussian Federation2013-07-152013-12-01Construction of the concrete structures in the section 33-34-39-40
445ENKA6 Acre Mod Non-Permanent Housing (CHU) - AfghanistanCivilAsiaAfghanistan2012-09-012013-09-01Construction of 164 Container Housing Unit (CHU) on a land of approximately 24,281 m². In addition to electric, communication, TSS, domestic water and fire suppression system, the project includes site utilities, roads, paving
444ENKADimitrovsky Tunnel Project (Section 11-12-13)InfrastructureEurasiaRussian Federation2013-07-152013-09-01Construction of the concrete structures in the section 11-12-13
443ENKAFront End Engineering Design (FEED) for Koktenkol Molybdenum ProjectInfrastructureAsiaKazakhstan2012-09-012013-08-01Civil, Structural, Architectural, Mechanical, Electrical Front End Engineering Design and Initial Cost Estimate of Koktenkol Molybdenum Project. Mine is planned to produce 20 M tons of ore per year
442ENKASED New USA Embassy Compound - Equatorial GuineaCivilAfricaEquatorial Guinea2011-02-012013-07-25The contract for Malabo is for a multi-building complex, which includes the new office building, the diplomatic residences and staff housing, all designed to provide secure, safe, and functional facilities for embassy employees. The New Embassy Compound consists of NOB, CAC, REC, SVC total 4 buildings in Malabo based on Standard Embassy Design and standards provided by owner during tender stage. The project includes site utilities, landscaping, roads, paving and building’s civil, architectural, electrical, mechanical, labor, material, equipment and services.
441ENKATransylvanian MotorwayInfrastructureEuropeRomania2003-12-192013-05-01Autostrada Transilvania, is one of the largest road infrastruc-ture project in Europe, construction of a four-lane, 112 km motorway, stretching in two separate sections. 52 Km part is in central Romania, from Luna to Gilau, 60 Km part is in Northwest Romania, from Marca to Bors which is border of Romania with Hungary. The motorway will be sponsored and owned by the Government of Romania. Upon completion, it will form an important section of the Romanian national highway system, providing a vital connection with the rest of Europe. The construction of the motorway is particularly important for Romania's integration into the European economy, and will link the markets of Europe and Central Asia. Until the end of May 2013, BEJV has completed approximately 82 km part of the motorway, 52 km opened to traffic and 50% of 60 km has also been completed. The PARTIES (GoR and BEJV) recently concluded negotiation of the termination agreement and the close out the Contract dated 29 May 2013. Part of completed motorway brought important economic benefits to Romania and Romanian citizens. New and expanded business, international investment and increase in trade and tourism are just some of the benefits Romanians expect to enjoy as a result of the Project
440ENKAAl Madina El Zarqa The Blue City ProjectCivilAsiaOman2006-11-072013-05-01The Project is primarily a residential and tourism development with leisure and retail elements in Muscat Al-Sawadi Region in Oman. Design, engineering, procurement and construction works for three 5-star and one 4-star hotels, 4,991 apartments and 202 villas, two Professional Golfers’ Association (PGA) world class golf courses, one with 18 and the other with 9 holes including their club house, tourist and heritage villages, one amphitheatre podium with gallery & retail units, shopping complex, entertainment and public amenity units such as a primary school, nursery, kindergarten, health centre, police station, fire house, post office and a mosque and all their related modern city infrastructure and landscaping over an area totaling 5.4 square km. with 1.7 million square meter approximate total gross floor area, which is 15.8% of the overall projected final site land. Phase 1 contract covers the design, engineering, procurement and construction of three 5-star hotels, the 248-key City Beach Resort Hotel, the 122-key Amphitheatre Resort Hotel and the 300-key Golf Resort Hotel; as well as 202 villas and 4,991 apartments for tourist and permanent residents; two world class golf courses, one eighteen hole, one nine hole, and their club houses; a tourist village; a heritage village; a city hall and all associated community necessities and amenities including a primary school, nursery, kindergarten, health care centre, shooping malls, police station, fire house, post office, mosque and related modern city infrastructure and landscaping. An intelligent, elegant layout has been devised for the development, which will be served by a network of broad boulevards, access roads and parling spaces complete with promenades, wide squares, public parks and green areas, giving residents a feeling of openness and space. Furthermore, in compliance with its location, the design character of the hotels and the residences will reflect and integrate a combination of traditional Omani and modern styles. Blue City is composed of eight sections, all will reflect different types of design, and all will afford sweeping Gulf views of follow the beautiful green expanse of the golf courses.
439ENKAKashagan Oil Field Development Project, Offshore Civil & Construction WorksOil & Gas, PetrochemicalsAsiaKazakhstan2012-12-012013-05-01Offshore civil construction works for supporting Hook-Up and Commissioning works
438ENKALapino Perinatal Medical Center ProjectCivilEurasiaRussian Federation2010-12-012013-03-01The project, owned by HAVEN, is a maternity hospital comprising 42,686m² of construction area with a basement and 5 floors. The perinatal hospital “Lapino” is designed to be a modernized complex for health rehabilitation at all stages. The hospital includes an in-patient ward for 87 beds. The out-patient clinic includes a pediatric consultancy-diagnostic center designed for 150 visits per shift; the consultancy-diagnostic center for adults (with 1 day-stay in-patient section) designed for 250 visits per shift; a laboratory; a spa-center with a rehabilitation therapy area and a cosmetology department with a swimming pool. The project plot has an area of 2.16 hectares and is situated on 1st Uspenskoye highway near Lapino village in rural area Nazarjevskoye in the Odintsovsky municipal district of Moscow region. The perinatal hospital will consist of 3 adjacent blocks: Block A – main medical center, with a basement and five stories, having a comb shaped layout; Block B – main food preparation center, with a basement and one story, having a semi-circular shaped layout; Block C – spa and rehabilitation center, with a basement and three stories, having a semi-circular shaped layout.
437ENKAAl-Amal Deaf and Dumb Education Centre Renovation Project (terminated)CivilAfricaLibya2010-02-012012-12-01The Education Centre have 5 main buildings and workshops. The renovation of buildings includes changing of all windows frames, doors, ceramic and wall tiles, marble stairs, roof terazzo and insulation, paint inside and outside of buildings. Site works includes all underground electrical and mechanical works, irrigation systems and landscaping
436ENKAKashagan Oil Field Development Project, Offshore Civil & Construction WorksOil & Gas, PetrochemicalsAsiaKazakhstan2005-04-012012-10-01The Kashagan field is located in the Kazakhstan sector of the Caspian Sea and extends over a surface area of approximately 75 kilometers by 45 kilometers. The reservoir lies some 4,200 meters below the shallow waters of the northern part of the Caspian Sea. The use of conventional drilling and production technologies, such as concrete structures or jacket platforms that rest on the seabed - is not possible due to the shallow water and cold winter climate of the northern part of the Caspian Sea. To ensure their protection from harsh winter conditions and pack ice movement, offshore facilities are being installed on artificial islands. There are two main types of island – small unmanned ‘drilling islands’ and larger manned ‘hub islands’. Hydrocarbons will travel from the drilling islands to hub islands via pipeline. The hub islands will contain processing facilities to separate recovered liquid (oil and water) from the raw gas, as well as gas injection and power generation systems. During Phase I, around half of the gas produced will be re-injected back into the reservoir. Separated liquid and raw gas will be taken by pipeline to the Bolashak onshore processing plant in Atyrau oblast, where export quality oil will be produced. Some of the processed gas will be sent back offshore for use in power generation while some will be used to generate power at the process plant itself.
435ENKASED New USA Embassy Compound - BurundiCivilAfricaBurundi2009-11-012012-08-01The US embassy in Bujumbura, Burundi is located on a 40,000 m² site in the Kigobe district of Bujumbura. The project includes a new office building, a warehouse and 6 other buildings that will include three access control buildings, a marines’ security guard quarters and a swimming-pool. The whole site is ultra-secure and safe using the latest building automation technologies.
434ENKAKindergarten MoscowCivilEurasiaRussian Federation2011-10-012012-07-01The Kindergarten Building is designed as a cast-in-situ reinforced concrete structure composed of 3 floors and a basement. The overall dimensions of the building are 43 x18 m and the height of the building is 12.5 m. The building will be usedfor different age groups of children such as infants, preschool children and short stay groups. Under the building there is a basementwhich houses the technical premises
433ENKAMoscow City Plot 4 Office & Hotel Tower (Imperia Tower)CivilEurasiaRussian Federation2006-02-062011-10-01The Imperia Tower, a Multifunctional Administrative Complex with apartments, owned by FLAINER - CITY, is located in Moscow-City at Krasnopresnenskaya Embankment, just two km. from the Garden Ring. Moscow-City is intended to be a pioneering model of 24- hour living urban development which will integrate the historical environment of Moscow with “A Class” office buildings, residential buildings, 5-star hotels as well as shopping malls and entertainment centers, all equipped with ultimately high technology in order to open a new window to the future. The project works comprise construction of a multi-functional administrative complex with offices, apartments and underground floors with technical and parking facilities. The design of the building was carried out by a well-known USA based company, NBBJ, but the entire detailed design was completed by ENKA. The gross construction area of the first stage works is 218,450 m², comprising 60 above-ground floors and 5 underground floors with 1,012 parking spaces. The office floors are located between the first and the 41st floors, and the apartment floors between the 43rd and the 59 th floors. Eight low-rise, 9 mid-rise and 13 high rise elevators will secure excellent access to all floors. The completed building provides 350 apartments, ranging from 75 m² to 220 m², two penthouse apartments offering a splendid view of Moscow and the Kremlin Palace and 70,353 m² leasable office areas for premier class tenants.
432ENKASED New USA Embassy Compound - DjiboutiCivilAfricaDjibouti2008-12-012011-10-01The contract for Djibouti includes design and construction of a new US embassy, a new office building, a marines’ security guard quarters, general services offices and associated maintenance and warehouse facilities, a perimeter security wall, vehicular and pedestrian access control facilities, parking, site recreational facilities including a pool, and office annexes.The compound was completed on time with high quality and safety standards, despite one of the world’s most challenging climates for construction.
431ENKA411 MW Yajva Combined Cycle Power PlantPower PlantEurasiaRussian Federation2008-07-152011-08-01The Yajva Combined Cycle Natural Gas Power Plant Project consisted of a single shaft Siemens 1xSCC5-4000F-1S Power Train comprising of a Gas Turbine, Steam Turbine, Generator and Condenser, a vertical natural circulation type un-fired boiler manufactured by CMI as well as all auxiliary equipment such as steam / water cycle, a water treatment plant, controls systems, electrical systems, instrumentation, gas compressors, an administration building, a natural draft cooling tower and a 220 kV switchyard. ENKA was selected as the EPC contractor by the Owner.
430ENKASenimdi Kurylys Construction Services (Contract 672887)Oil & Gas, PetrochemicalsAsiaKazakhstan2009-05-212011-06-01Construction of infrastructure of off plot works such as piping, pipelines, civil, electro-mechanical and instrumentation and maintenance works of the plant and camp
429ENKAMultifunctional Complex with Apartments in TsvetnoyCivilEurasiaRussian Federation2007-08-162011-04-01The Office and Residence Plaza “Legend of Tsvetnoy” is located on Tsvetnoy Boulevard, the historical and prominent city center of Moscow. The project covering an area of 120,296 m² has been awarded by CAPITAL GROUP, a Russian real estate development company that carries out high-end residential and office projects in the Moscow property market. The project comprises the construction of multifunctional complex with a substructure methodology of top-down and pipe support system.The 16 floor Plaza consists of a three story underground car park covering an area of 33,218 m², a seven story business center covering an area of 56,294 m² and three distinct eight and seven story residential towers rising above the business center and covering an area of 30,786 m². One of the three blocks of the business center is reserved exclusively for the “Presidential Administration” and the other two house “A Class” office spaces, restaurants and retail areas. The contract was awarded on a “shell and core” basis. ENKA’s scope of works comprised the civil, architectural, MEP, facade, roofing and landscaping works. On November 25, 2010, the “Legend of Tsvetnoy” was chosen the winner of the residential property prize “Urban Awards 2010” in the category “The Best Luxury Residential Development Under Construction.”
428ENKASED New USA Embassy Compound - Bosnia and HerzegovinaCivilEuropeBosnia and Herzegovina2007-11-012010-11-01Construction of a Standard Embassy Design New Embassy Compound of the USA on a land of 44,000 m²
427ENKARreshen - Kalimash MotorwayInfrastructureEuropeAlbania2006-10-012010-10-01Undertaken by ENKA and Bechtel in September, 2006, the Rreshen-Kalimash Motorway Project is a key connection between Durres Port, Albania’s primary harbor on the Adriatic Sea, and Kosovo. The Rreshen-Kalimash motorway’s main purpose is to serve as a faster and safer route through the mountainous region. Travel time is reduced from eight hours to two hours. The new motorway connects Albania to Kosovo and other transportation corridors like corridor 7 and corridor 6. In addition to the great amount of travel time saved, this new route served to stimulate the economy in Albania’s northeastern region. The 61 km motorway crosses the mountainous northern region of Albania, linking the cities of Rreshen and Kalimash, and is divided into three sections. Construction started in December, 2006, immediately after the signing of the contract. The designers were Scetauroute (France) for sections 1 and 3, and Italconsult (Italy), for section 2. Section 1 is an 18.9 km long stretch from Rreshen to Reps. Section 2 is 26.3 km long and travels from Reps to Thirra. Section 3 connects Thirra and Kolshi and is 14.8 km long. At Mount Runes, at an altitude of 1,858 m, construction included a 6 km long double-bore tunnel. The motorway was opened to traffic in June, 2009.The motorway is designed as dual carriageways of 2X3.75 m, supplemented with 2 m emergency shoulder lanes. The major work items comprise the construction of bridges and viaducts with a total length of 5.4 km in the challenging mountainous terrain of Albania as well. BEJV managed the design and accomplished all civil and finishing works.
426ENKATripoli State Guest HouseCivilAfricaLibya2009-10-012010-08-01Turn-key renovation of fully furnished high quality 1 villa in Tripoli. The project also includes landscaping and infrastructure works
425ENKAMIBC Central Core Shopping and Entertainment Complex Plot No 6, 7 & 8bCivilEurasiaRussian Federation2006-12-262009-12-31The Central Core of MIBC “Moscow City” is a multi-functional center, featuring a shopping mall, cinemas, food courts, restaurants, an ice rink, a space frame atrium dome with an area of 10,500 m², administrative premises, an access to the mini-metro and underground car parks. The building is located on the Krasnopresnenskaya Embankment. The five-floor reinforced concrete building with one underground public floor, and a three-floor underground car park which is connected to the mini-metro, comprises the entire center.The building has a standard rectangular form, 117 m by 410 m. However, a glazed atrium dome with a peripheral ribbon gives the building its unique appearance. This central core maintains a vital interconnection between Moscow City’s blocks through two carriageways that run along the facades. All the design work, as well as the civil, structural, mechanical, electrical, roof works and the finishing works of the operational and technical premises are included in the contract.
424ENKAWhite Square Office Centre Fit-out Works for Building ACivilEurasiaRussian Federation2008-04-072009-12-01Fit-out works of Building A of White Square Office Centre
423ENKASheremetyevo International Airport Terminal 3CivilEurasiaRussian Federation2005-06-012011-11-01Sheremetyevo International Airport, one of the largest international airports in the Russian Federation, serves more than 40 foreign carriers, in addition to the various Russian airlines. Sheremetyevo Airport’s principal carrier is Aeroflot Russian airlines, Russia’s largest air carrier, for which Sheremetyevo serves as the base. Initially, the airport had two terminals, Sheremetyevo 1 and Sheremetyevo 2, providing services for domestic and international routes. OAO AEROFLOT decided to build a third terminal to serve as Aeroflot’s and its alliances’ international terminal. Terminal 3 has a carrying capacity of up to 12 million passengers annually, and with Terminal 3 in operation, Sheremetyevo International Airport complex has reached a total carrying capacity of 3,800 passengers per hour, arrival plus departure. The terminal building is a six-floor reinforced concrete building. The building’s facade is composed of glazing, aluminium composite and natural stone. Apart from the terminal building, major work items included in the contract were an apron area of 374,000 m²; a multi-story car park building for 4,000 cars; a control tower; 12 fixed passenger bridges; various car and bus parks; external facilities such as a water treatment plant and water supply lines, an MV switch room; infrastructure works including high voltage cable lines, sewage lines, fiber optic cable ducts; construction of the aircraft refueling system, and hard and soft landscaping. Check-in counters, passport counters and the lounge furniture were also included in the contract works. Since the existing airport facilities were in operation throughout construction, extra special care had to be taken with regard to safety, environmental protection and security.
422ENKAWhite Square Office CentreCivilEurasiaRussian Federation2006-06-012009-11-01The project located in the city center, encompasses construction of a mixed use office center with three mid-rise buildings, which share a common underground car park on three level. The Office A: 16 floors, 36,800 m² gross area Office B:16 floors, 32,200 m² gross area Office C: 7 floors, 10,900 m² gross area Carpark: 3 underground floors, 29,200 m² gross area
421ENKA5th Building within OAO Moskva Krasnye Holmy Development, Stage 5CivilEurasiaRussian Federation2007-12-012009-11-01The building is located on the corner of Kosmodamiankaya Nabereshneya and Krasnoholmsky Ulitsa. It is a 9 floor building with two basements. Office part with his own entrances completely separated from others parts, having 8 floors for office purposes. Conference and Events part is located in second floor. Shopping and restaurant area is located on the first floor with separate entrances
420ENKA2F Building within OAO Moskva Krasnye Holmy Development - Stage 2CivilEurasiaRussian Federation2008-10-012009-11-01The building is located on the corner of Kosmodamiankaya Nabereshneya and Krasnoholmsky Ulitsa. It is a 8 floor building with two basements, one attic and one mezzanine floors. Offices are located on 3 floors and carpark is located on the second basement floor. Only structural works, lift and working design is included in the Contractor's scope of Works
419ENKAWhite Square Office Centre Fit-out Works for Building BCivilEurasiaRussian Federation2007-04-072009-10-01Fit-out works of Building B of White Square Office Centre
418ENKAAUDI Car Centre and Highrise Office BuildingCivilEurasiaRussian Federation2007-07-012009-10-01The project consists of two separate buildings: AUDI firm with a showroom, garage and parking place and the office building located in close vicinity. Both buildings are connected by common underground garage in two through semi-basements. AUDI firm and office building possess their own areas for driving and access. The office building consists of 15 floors above ground and 2 floors under ground. The showroom is 2 floors above ground and the garage is 2 floors under ground. The carpark consists of 3 floors under ground
417ENKATripoli Chamber of Commerce and Industry FederationCivilAfricaLibya2009-08-012009-10-01Construction of the Trade building and renovation Chamber of Commerce and Industry Federation
416ENKANew Stadium, FC ShakhtarCivilEuropeUkraine2006-06-012009-09-01Set within the beautiful Leninsky Komsomol Park, this stunning new home for FC SHAKHTAR has become a new symbol for Donetsk city, while providing an unforgettable match experience for spectators. Its bowl design offers a high degree of comfort as well as improved viewing standards. Immediately adjacent to the seating areas are a range of facilities catering to every fan’s needs. In addition to adhering to Ukraine’s codes and standards, the stadium’s design meets the most recent internationally recognized safety standards. The roof includes a large area of translucent sheeting material to improve daylight and sunlight penetration and promote improved natural turf growing conditions. Furthermore, large open areas are incorporated in the perimeter of the lower-tier concourse to enable cross ventilation of the pitch. The external elevation of the building provides a seamless glazed facade and a high degree of transparency to the exterior of the building. The stadium combines elegance of form with simplicity in materials. It has become a landmark stadium for world-class players and a worldwide audience. The stadium’s conceptual design was developed to meet the specific requirements of the club for a natural playing surface, a seating capacity for 51,500 spectators, qualification for UEFA elite status, VIP suites with segregated viewing areas, underground VIP parking as well as additional facilities such as a club museum, a club shop, a cafeteria and a health club. During the construction, considerable de-watering works were performed to reduce the height of the underground water level. These were followed up with piling works to improve the load bearing capacity of the soil by using 400 mm x 400 mm friction piles. The tiers were comprised of a total number of 3,400 pre-cast concrete elements. Total concrete used in the works amounted to 120,000 m³. The roof is a three dimensional, structurally efficient design that appears to float above the building. The shape inclines towards the south, resting on a dozen 60 m long steel support trusses that were manufactured and erected by Çimtaş and maneuvered with a giant, 600-ton mobile crane, able to lift steel structures in excess of 230 tons. These 12 steel support trusses have a combined weight of 4,000 tons, which carry the space-frame structure of the roof, designed and manufactured by Mero-TSK.
415ENKAPaveletskaya Square Underground Shopping MallCivilEurasiaRussian Federation2006-02-012009-08-01Underground diaphragm wall, ground rehabilitation and limited foundation works for 6 storey underground shopping mall
414ENKADonstroi II - Multifunctional Office and Retail Complex at Central Administrative DistrictCivilEurasiaRussian Federation2008-01-012009-08-01The project comprises of construction of an underground (6 storeys) car park and 35 floors of multifunctional office and retail premises as Shell & Core including stylobate part
413ENKASakhalin II Onshore Processing Facility (OPF) ProjectOil & Gas, PetrochemicalsEurasiaRussian Federation2003-06-012009-07-01The Sakhalin II Project is an integrated oil and gas field development project designed to enable year-round production from two major offshore fields, namely Piltun-Astokhskoye oil field and the Lunskoye natural gas field, located on the northeastern shelf of Sakhalin Island in the Okhotsk Sea. The project involved installation of two offshore production platforms (PA-B and LUN-A) along with the onshore infrastructure and facilities required for the sustained export of oil and gas. Crude oil and gas from the existing PA-A and the new PA-B platforms is delivered via separate pipelines to an onshore processing facility (OPF) located near the Lunskoye landfall. Gas and condensate from the new LUN-A platform is also delivered to the OPF via two 30-inch multi-phase pipelines. Gas from the OPF is then transported via a single onshore pipeline to a new LNG plant located at Prigorodnoye on the south coast of the island while crude oil and stabilized condensate is commingled and pumped together via a single onshore pipeline from the OPF to a new oil export terminal at Prigorodnoye. The Onshore Processing Facility (OPF), located in the north-east of Sakhalin Island, 7 kilometers (4.3 mi) inland in Nogliki district, is the key element of the Sakhalin II development scheme. Major components of the OPF included facilities for three-phase inlet separation, condensate stabilization (two trains), gas dehydration, and dewpoint control along with two gas export compressors and two crude oil booster pumps. The OPF occupies a territory of over 62,000 m² and at full capacity is capable of processing approximately 1,800 million scf/d of gas (51 million m³/day) and about 60,000 b/d of condensate/oil (9,500 m³/day). The OPF is designed to be an entirely self-sufficient stand-alone facility. Utility systems installed at the OPF include flares, drainage, instrument/utility air, sewage treatment, potable and utility water, fuel gas and diesel, HVAC, chemical injection, fire water, and waste heat recovery systems. The facility also includes a 100 megawatt gas turbine driven power plant to generate power for the OPF itself and for the LUN-A platform. The facility also includes storage tanks and associated handling equipment for condensate and crude oil, off-spec condensate, fresh water, potable water, fire water, diesel fuel, rich monoethylene glycol (MEG), lean MEG, and oil field chemicals, including demulsifiers, corrosion inhibitor, and neutralizer. Storage tanks at the OPF site are insulated and have rigid roofs capable of withstanding the snow and ice loading conditions of the area. Where required, tanks are equipped with heating coils for liquid viscosity and freeze control.
412ENKAMoscow City Car ParkCivilEurasiaRussian Federation2008-07-012009-07-01Design and build agreement for the construction of the multi-level car parking lots under the over-pass/overhead road of the third transport ring (TTK) at the address Krasnopresnenskaya Embank-ment on the territory of MIBC “Moscow-City”. Investment Project of ENKA
411ENKA840 MW Third power unit of the Nizhnevartovsk State District Power Plant (GRES)Power PlantEurasiaRussian Federation2008-12-192009-07-01Engineering of the third power unit – a combined cycle gas turbine (CCGT unit) with installed capacity of 840 megawatt. The new unit will consume an additional 1.2 billion cubic metres of gas per year. TNK-BP will also annually purchase about 6 billion kilowatt per hour of generated electric power from the third unit
410ENKASenimdi Kurlyls Infrastructure Works Engineering & Construction (Contract OM 202)Oil & Gas, PetrochemicalsAsiaKazakhstan2001-02-012009-06-01Design and construction of infrastructure of off plot works such as piping, pipelines, civil, electro-mechanical and instrumentation and maintenance works of the plant and camp
409ENKATripoli State Guest HousesCivilAfricaLibya2006-09-012009-06-01Turn-key renovation of fully furnished high quality 17 villas in Tripoli. The project also includes landscaping and infrastructure works
408ENKAEsentai Park - Shopping Mall, Phase IICivilAsiaKazakhstan2007-03-012009-06-01Construction of Esentai Retail Center in Almaty, Kazakhstan. The building is 120x130 m of size and consists of 2 below ground and 4 above ground levels with a height of 28.41m. Contracts include civil and façade works
407ENKAEsentai Park - InfrastructureCivilAsiaKazakhstan2007-08-012009-06-01Infrastructure Works of Esentai Park including all mechanical, Electrical and Utility Works
406ENKATverskaya Zastava Underground Shopping MallCivilEurasiaRussian Federation2006-10-012009-05-31The project, with the total construction area of 116,806 m², including five underground floors, consists of four sections. The first section is the construction of multilevel underground car park with an underground shopping mall and an above-ground pavilion. The second section comprises the construction of the traffic interchange on the Tverskaya Zastava Square. The third and fourth sections of the project are the relocation of the project area's utility and service lines and the territoy improvement works at Tverskaya Zastava Square.
405ENKAMetropolis Shopping Center and OfficesCivilEurasiaRussian Federation2006-09-012009-05-01The Metropolis Project is a mixed-use center, owned by CAPITAL PARTNERS, encompassing a shopping/retail center, three “A Class” office buildings and a multilevel car park, all of which amount to a construction area of 350,000 m². The shopping/retail center contains a hypermarket with an area of 6,800 m², shops, boutiques, a recreation center, a food court with an area of 2,700 m², a restaurant with a 380 seat capacity, 12 cinema halls and a fitness center. The center has an underground car park with a 1,500 vehicle capacity and a multi-level, above-ground car park with a 1,400 vehicle capacity.The glazed aluminum facade cladding serves as a ventilated facade for the office buildings and an insulated sandwich panel for the retail building. The structures are designed as cast-in-situ reinforced concrete foundations, columns, beams, slabs and walls around the elevator shafts by utilization of conventional formwork systems.Contractual works also entail the site de-watering works and the removal of the existing building’s foundations.
404ENKAShopping Center in Mitino - Design WorksCivilEurasiaRussian Federation2008-01-012009-05-01Preparation of the Design and Study Proekt Documentation for the Construction of the Building to be located at Moscow, Mitino District, Microdistrict 1A
403ENKACorinthia Nevskij Palace HotelCivilEurasiaRussian Federation2007-09-112009-03-01The project comprises of construction of 3 buildings:New Hotel Building (Building No59), New Office Building (Building No55), Refurbishment works in Existing Hotel Building (Building No57). Pilling, foundation and insulation works for Building No55 and 59 will be done by others. New Office Building (Building No55) will be finished as Shell&Core, where New Hotel Building (Building No59) and Existing Hotel Building (Building No57) will be fully finished. FF&E Works for the Building No57 and 59 comprise finishing works, hotel rooms’ furnitures, sanitary materials. TV’s, remote controls and decoders, lighting fixtures, etc. Corinthia Hotel Project Insurance Schedule / ATA SIGORTA. Project consists of design, development documentation, supervision of all works, roofing works, concrete works, façade works, engineering systems and equipment works,testing and commissioning of said works, including all materials and equipment, additional works and auxiliary works provided by the Contract or additional expenses, within the limits of stipulated below insurance sums and limits
402ENKAEsentai Park - Shopping Mall, Phase ICivilAsiaKazakhstan2006-08-012009-02-01Construction of 2 below ground floors (B4 & B3) as shell and core, named Esentai Retail Center in Almaty, Kazakhstan. Scope of Work consists of foundation and B4 & B3 level concrete works only. The building is 120*130 m of size
401ENKANevsky Bereg Multi-Use Complex - Design ContractCivilEurasiaRussian Federation2008-05-012009-02-01Concept & Scheme Design of Nevsky Bereg Multifunctional Complexon shell & core basis, consisting of underground carpark, A-class offices, a 4-star hotel with 200 rooms, serviced apartments, retail areas and river station terminal
400ENKATechnical Assistance & Supporting Contract in MisurataCivilAfricaLibya2001-11-012008-12-01To supply engineering, technical manpower, local and foreign materials, machinery and equipments for the performance of some official projects requested by the employer
399ENKASenimdi Kurlyls TCO Asset Development Projects (SGI -SGP Frame Agreement 1671)Oil & Gas, PetrochemicalsAsiaKazakhstan2004-02-012008-12-01Construction and infrastructure of off plot works such as piping, pipelines, pad preparations for rig operations, well sites, civil, electro-mechanical and instrumentation works
398ENKAHorus Capital Oasis Dobrininsky Center Office & Retail DevelopmentCivilEurasiaRussian Federation2007-10-122008-12-01The project comprises of construction of an A class Multifunctional Business Complex with 13 floors above and 3 floors below ground level. The underground levels will serve as carpark area. The project has a unique curtain wall façade design
397ENKASGP Onplot Multi-Discipline Project (Contract 571502-6-1173)Oil & Gas, PetrochemicalsAsiaKazakhstan2003-12-052008-11-01Construction of Power, Utilities, Crude Stabilization and Gas Processing Units of the Second Generation Project including civils, architectural, structural steel erection, piping (fabrication and installation), electrical, instrumentation and mechanical installation disciplines
396ENKAEsentai Park - Residence Building CCivilAsiaKazakhstan2007-03-012008-11-01ENKA undertook the construction of a 3+22 storey Residence A, Residence B and Residence C buildings. Due to financial problems on the part of Capital Partners Group, construction was suspended in 2008 on Residence B and Residence C buildings. In June 2013, ENKA agreed upon a contract with KUSA KKB-2 LLP to complete the construction of Esentai Residence B and Esentai Residence C in Almaty. ENKA is responsible for the construction work, design development for the electrical and mechanical parts of the design (MEP), the elimination of the defects in the Residence B, Residence C and the parking spaces, which cover a gross area of 99,000 m² with 18 duplex apartments and 268 standard apartments.13,300 m² of the gross area include 4 duplex apartments and 43 standard apartments which belong to ENKA. The buildings are 22 stories high and have three floors beneath ground level. The underground levels consist of a mezzanine floor connecting to the pedestrian tunnel that would serve Residential A, B & C. ENKA strives to offer the highest standards available to the owner since the residential buildings are the most prestigious buildings in Almaty, Kazakhstan for a target market of high-end buyers.
395ENKAFit-out Works for Various TenantsCivilEurasiaRussian Federation2007-04-012008-11-01Fit-out works for office premises of various tenants such as Oracle, KIT Finance, Lehman Brothers, Q-Tec, Symantec, Becton Dickinson, General Electric, American Planning, Standard Bank, Europolis, Medcore 2000, Regus, HSBC, Nestle, Servier, CGSH etc. located in Block C of Moscow City Plot 10 and Office Building in Paveletskaya Square
394ENKADushanbe Business CenterCivilAsiaTajikistan2006-06-162008-10-01Turn-key construction, procurement and detailed design of an office and residential complex with one 6 Storey and one 12 Storey Blocks (shell and core basis)
393ENKAEsentai Park - Residence Building BCivilAsiaKazakhstan2007-03-012008-10-01ENKA undertook the construction of a 3+22 storey Residence A, Residence B and Residence C buildings. Due to financial problems on the part of Capital Partners Group, construction was suspended in 2008 on Residence B and Residence C buildings. In June 2013, ENKA agreed upon a contract with KUSA KKB-2 LLP to complete the construction of Esentai Residence B and Esentai Residence C in Almaty. ENKA is responsible for the construction work, design development for the electrical and mechanical parts of the design (MEP), the elimination of the defects in the Residence B, Residence C and the parking spaces, which cover a gross area of 99,000 m² with 18 duplex apartments and 268 standard apartments. 13,300 m² of the gross area include 4 duplex apartments and 43 standard apartments which belong to ENKA. The buildings are 22 stories high and have three floors beneath ground level. The underground levels consist of a mezzanine floor connecting to the pedestrian tunnel that would serve Residential A, B & C. ENKA strives to offer the highest standards available to the owner since the residential buildings are the most prestigious buildings in Almaty, Kazakhstan for a target market of high-end buyers.
392ENKADonstroi I - Office & Administrative Centre at Khoroshevskoye Shosse, Estate 20-22, Block BCivilEurasiaRussian Federation2006-12-122008-09-30The project comprises the construction of 2-storey underground and 8 storey above ground carpark & 42 storey A Class office premises to be completed as shell & core
391ENKAGM Opel Automobile Factory (Blue Ocean Project)CivilEurasiaRussian Federation2007-05-012008-09-30Construction of a car manufacturing plant including paint, assembly, storage, utilities building and full external utilities within the boundary
390ENKAMoscow City Plot 10 Block C Fit-out Works for KPMGCivilEurasiaRussian Federation2007-03-012008-09-01Fit-out works for office premises of KPMG located in Block C of Moscow City Plot 10
389ENKAEsentai Park - Fitness CentreCivilAsiaKazakhstan2007-03-012008-09-01Construction of a 2+4 floor building as shell and core, named Esentai Fitness Center in Almaty, Kazakhstan. Interior works, equipment and furnishing are not included in the Scope of Work. The building consists of 2 below ground levels. Total height is 30.33 m including 2 level basement floors. Facility will include a closed swimming pool, tennis courts, fitness centers, spa, shower and locker facilities, related amenities
388ENKADushanbe 5 Star Hyatt Regency Hotel, Business and Residential CenterCivilAsiaTajikistan2006-03-172008-10-01The design and build contracts for the 12-storey, 5-Star Hotel and the Dushanbe Office and Residential Center were signed in March, 2006 and June, 2006 respectively. The hotel, owned by SOZIDANIE, is located in the Komsomolsky Park on Ismailli Somoni Avenue in Tajikistan’s capital city of Dushanbe. Providing a unique view of man-made Komsomolsky Lake, the hotel project has a total construction area of 38,000 m². The first section of the building is low-rise with stone cladding, housing the hotel’s facilities. The second section, a Z-shaped building, is the 12-story high-rise containing the guest rooms. These rooms are located from the 4th floor on up to the 12th and include 173 standard, 41 semi-luxurious, and six deluxe bedrooms, and a presidential suite. Located on the basement level is an underground car park in addition to the kitchen, storage, laundry and dry cleaning facilities. Equipped with cutting-edge technology, the hotel welcomes meetings and conferences in its ballroom and seven exclusive halls, all located on the first and second floors where the swimming pool and spa are also situated. The hotel was completed in August, 2008. The 30,000 m² Office and Residential Center follows the main boulevard that connects Dushanbe city to its airport. Its facade design is multi-layered in order to create a play of light and shadow through its 6- and 12-storey blocks, which turns the center into a showcase of eye-catching architecture and engineering. Both buildings are designed as reinforced concrete structures with 1.2 m thick mat foundations, the office and residential center sitting on 436 piles that are 800 to 1000 mm in diameter. An aluminum and glass panel system is used for the facades of both projects, which are self-sufficient buildings, outfitted with their own water-storage tanks, heating systems, and generators. The office and the residential center were completed and handed-over in October, 2008.
387ENKAEsentai Park - Tower BuildingCivilAsiaKazakhstan2006-01-142008-08-01Construction of a 4+37 floor building as shell and core, named Esentai Tower in Almaty, Kazakhstan. Interior decoration is included in the scope only for Ground floor i.e. lobby for office floors. The building consists of 4 garage levels, ballroom, utility building office, hotel and residence floors. Total height is 173 m including 4 level garage / basement floors. Office floors are b/w 4th to 14th floors. Area for office floors is 19,000 m². 15th, 16th, 26th, 35th and 36th floors are mechanical & mezzanine floors. 17th floor is health club including an indoor pool. Hotel floors are b/w 18th to 24th including executive floor. Area for hotel floors is 12,000 m². 25th floor is restaurant and kitchen. Residence floors are b/w 28th to 34th floors. Area for residence floors is 8000 m². 37th floor is roof. Ballroom facility next to tower is 2,500 m² gross and sits on 4 levels garage floors underground.
386ENKAEsentai Park - Residence Building ACivilAsiaKazakhstan2006-07-142008-08-01ENKA undertook the construction of a 3+22 storey Residence A, Residence B and Residence C buildings. Due to financial problems on the part of Capital Partners Group, construction was suspended in 2008 on Residence B and Residence C buildings. 13,300 m² of the gross area include 4 duplex apartments and 43 standard apartments which belong to ENKA. The buildings are 22 stories high and have three floors beneath ground level. The underground levels consist of a mezzanine floor connecting to the pedestrian tunnel that would serve Residential A, B & C. ENKA strives to offer the highest standards available to the owner since the residential buildings are the most prestigious buildings in Almaty, Kazakhstan for a target market of high-end buyers.
385ENKAMoscow City Plot 10 Block C Fit-out Works for Renaissance CapitalCivilEurasiaRussian Federation2007-08-012008-08-01Fit-out works for office premises of Renaissance Capital located in Block C of Moscow City Plot 10
384ENKAProcter & Gamble Fit-out WorksCivilEurasiaRussian Federation2007-12-012008-07-01Fit-out works for office premises of Procter & Gamble located in Metropolis Shopping Center
383ENKAIKEA Business Park, Khimki - Second PhaseCivilEurasiaRussian Federation2007-03-012008-05-01Design and Build of the Office Building B with all the underground structures on "Turnkey Basis" including connection of External Utilities to the buildings and related Internal Infrastructure
382ENKAMonaco Clinic Fit-out WorksCivilEurasiaRussian Federation2007-09-012008-05-01Fit-out works for office premises of Monaco Clinic located in Metropolis Shopping Center
381ENKAHaileybury-Almaty School ProjectCivilAsiaKazakhstan2007-10-012008-04-01Design and Structural Concrete Construction of 8 Blocks including closed swimming pool and Sports Hall
380ENKANovosibirsk Retail CentreCivilEurasiaRussian Federation2006-08-012008-03-01Construction of a 3 storey shopping mall with a car park
379ENKAQued Athmania Water Treatment Plant Phase 1InfrastructureAfricaAlgeria2002-08-012007-03-01The water treatment plant contact was awarded to the ENKA and Degremont (France) consortium, the scope of construction included detailed design, material supply, civil and structural works for the treatment plant as well as the leakage tests of the structurs. ENKA's share of the work was also entitledthe design, supply,erection and start-up of the raw water supply peipline. The plant's final operational capacity is 270,000 m³/day of treated water per day.
378ENKAColdstore Warehouse Facility, DomodedovoCivilEurasiaRussian Federation2006-06-012007-12-01Construction of a Coldstore Warehouse facility with parking for auto and railway transport
377ENKAMoscow City Plot 10 The Naberezhnaya Tower Office Buildings Block C, Phase IICivilEurasiaRussian Federation2005-01-012007-11-01The Naberezhnaya Tower Project, an investment project entirely developed by ENKA, is located on 1,574 hectares of land in MIBC “Moscow City,” at the intersection of the Third Transport Ring and Krasnopresnenskaya Embankment. This region of the city is rapidly emerging as Russia’s new business capital. Prominently situated on the riverside, the buildings offer an awe-inspiring panoramic view of central Moscow across the Moscow River. The Naberezhnaya Tower project was a two-phase project, consisting of two buildings, 17 and 27 stories respectively, designated as A and B in Phase 1. The Tower, also referred to as Building C, is a 60-story skyscraper developed as Phase 2.Turn-key design and construction of a high-rise "A Class", sixty-story Building C towers 260 m above the ground and includes five sub-level floors, which, with the other two buildings, incorporate the restaurants, cafes, shops, technical premises and car parks. In the buildings’ design, apart from the dead and live loads and the wind loads, which were taken into consideration in accordance with Russian and European standards, additional tests, such as wind tunnel testing, were applied so that systems for the buildings, such as those for the facade, could be determined accordingly. All the buildings have been equipped with state-of-the-art mechanical and electrical systems. The tower is outfitted with a total of 28 elevators, consisting of eight low-rise, eight mid-rise and six high-rise passenger lifts with a speed of 8 m per second, as well as six fire and service lifts.
376ENKASGP TCO Asset Development Projects Sulphur Recovery Unit Multidiscipline Project (Contract 1914)Oil & Gas, PetrochemicalsAsiaKazakhstan2004-11-012007-10-01Construction of Sulphur Recovery Unit of the Second Generation Project including civils, architectural, structural steel erection, piping (fabrication and installation), electrical, instrumentation and mechanical installation disciplines
375ENKASGI-II Turnaround Mechanical Works Injection & Booster Compr. (Contract 571501-4-1274)Oil & Gas, PetrochemicalsAsiaKazakhstan2007-02-012007-10-01Mechanical works on Injection and Booster Compressors during SGI Stage 2 Turnaround phase
374ENKASED New USA Embassy Compound - NepalCivilAsiaNepal2004-11-012007-09-01Construction of a Standard Embassy Design New Embassy Compound of the USA on a land of 24,300 m²
373ENKASED New USA Embassy Compound - AlgeriaCivilAfricaAlgeria2004-11-012007-09-01Construction of a Standard Embassy Design New Embassy Compound of the USA on a land of 28,400 m²
372ENKAUS AID Office Building - NepalCivilAsiaNepal2004-09-012007-09-01Construction of a Standard Embassy Design US AID Office Building of the USA
371ENKAReal Hypermarket, BugryCivilEurasiaRussian Federation2006-12-012007-08-31Design & Construction of architectural, mechanical and electrical completion works in the Real Hypermarket
370ENKAReal Hypermarket, Nizhny NovgorodCivilEurasiaRussian Federation2007-05-012007-08-31Design & Construction of architectural, mechanical and electrical completion works in the Real Hypermarket
369ENKAAfşin Elbistan B Thermal Power Plant, Amendment - 15 New Raw Water Supply SystemInfrastructureEurasiaTurkey2006-01-012007-08-01Construction of Raw Water Supply System from Ceyhan River Battal Bridge Downstream
368ENKADomodedovo Logistics Park - Design WorksCivilEurasiaRussian Federation2007-02-012007-08-01Design and P-Stage Works of the logistics park in Domodedovskaya, Moscow Region
367ENKASakhalin I De-Kastri Oil Export TerminalOil & Gas, PetrochemicalsEurasiaRussian Federation2003-11-182007-07-01De-Kastri Oil Terminal is an oil export terminal located 6 km away from the village of De-Kastri in Khabarovsk Krai, Russian Federation. It is one of the biggest oil terminals in the Far East that serves as a hub for crude oil deliveries to Asian markets. The terminal, which started operations in 2006, belongs to the Sakhalin-I consortium led by Exxon Neftegas Ltd., which also includes 20% stake held by Russian affiliates of Rosneft:Sakhalinmorneftegas-Shelf and RN-Astra. The overall capacity of the export terminal is approximately 88 million barrels per annum of oil. Tanker loading capacity is suitable for Aframax tankers up to 110,000 DWT. The five Aframax tankers servicing the terminal are purpose-designed double-hull ice class vessels. The area of the terminal covers nearly 256,000 square meters. The construction of the terminal started in 2003 and was completed by August 2007. In November 2009, during the International congress Oil Terminal 2009 held in Saint Petersburg, De-Kastri terminal won the “Terminal of the Year Award”. The Award for the Terminal of the Year with a capacity of shipment of more than 5 million tonnes per year is presented to an international terminal with best economic, ecological and social indicators once in every three years. De-Kastri terminal was nominated among a total of 34 candidates. Since 2006, nearly 300 oil tankers have transported more than 30 million tonnes of crude oil from the terminal without a single incident or shutdown. De-Kastri’s SBM loading is considered to be the largest in the industry.
366ENKAENL Sakhalin I - EPC 1, Oil Export Terminal Mechanical WorksOil & Gas, PetrochemicalsEurasiaRussian Federation2005-12-012007-07-31Civil Works (Earth works, Road Construction, Sprung Buildings Construction), Mechanical Works(Spool Fabrication, Underground and Above Ground Piping and Welding Works) and Completion Works for ENL Sakhalin-1, Project EPC-2 De Kastri Export Terminal
365ENKAToyota Car Assembly Plant - Mirai Project ShusharyCivilEurasiaRussian Federation2006-05-262007-09-28Construction of an automobile factory including 4 process shops (each 12,000 m²), utility shop (5,000 m²) and 11 service buildings. The project also includes electrical and mechanical installations, roads, parking areas and landscaping. The plant, with a production capacity of 50,000 cars per year, is one of Toyota's biggest factories in Europe.
364ENKAIKEA Business Park, Khimki - First PhaseCivilEurasiaRussian Federation2006-06-012007-04-01Design and Build of the Office Building A and Training Center Building with all the under-ground structures on "Turnkey Basis" including connection of External Utilities to the buil-dings and related Internal Infrastructure. Office Building A - Shell&Core&Fit-Out of 6 of 15 Floors. Training Center - Shell&Core & Fit-Out. Technical Service Building. External Utility Works within the site. Access Roads, Car Parking, Pond and Landscaping
363ENKAReal Hypermarket, VinciCivilEurasiaRussian Federation2006-07-012007-04-01Design & Construction of architectural, mechanical and electrical completion works in the Real Hypermarket
362ENKAQued Athmania DamInfrastructureAfricaAlgeria2002-08-012007-03-01Situated about 30 km northwest of the Constantine Province, the dam reservoir is located in Mila City, in eastern Algeria. The works are part of a master project named Transfer of Beni Haroun, which aimed to channel much needed water from Beni Haroun and Bou Siaba to the six cities of Batna, Kenchela, Mila, Oum El Bouaghi, Constantine and Jijel where the demand for drinking water and agricultural irrigation water has increased rapidly over recent years. The dam reaches a height of 44 m, a length of 630 m, and has a reservoir capacity of 33,600,000 cubic meters. Its combined concrete tunnel, a derviation gallery and water transfer gallery, have a length of 313 m and a sectional area 75 m². The derivation gallery is able to drain water at a maximum flow rate of 60 cubic meters per second. The pipeline capacity is 4 cubic meters per second for drinking water and 2.5 cubic meters per second for irrigation water.
361ENKAMulti Phase Flow Meter & Metering Stations (Contract 571500-4-1918)Oil & Gas, PetrochemicalsAsiaKazakhstan2005-05-012007-03-01Installation of Multi Phase Flow Meters on wells and modifications and extension of existing Korolev Metering Station
360ENKAReal Hypermarket, YaroslavskayaCivilEurasiaRussian Federation2006-09-052007-03-01Design & Construction of architectural, mechanical and electrical completion works in the Real Hypermarket
359ENKASGI Main Mechanical Installation (Contract 571501-4-1058)Oil & Gas, PetrochemicalsAsiaKazakhstan2003-11-012007-02-01Construction of Sour Gas Injection Project Main Mechanical Works including structural steel erection, piping (fabrication and installation) and mechanical equipment erection
358ENKAReal Shopping Center and Hypermarket, VolgogradCivilEurasiaRussian Federation2006-06-012007-02-01Design & Construction of a Real Shopping Center and Hypermarket
357ENKAReal Shopping Center and Hypermarket, LipetskCivilEurasiaRussian Federation2006-06-012007-02-01Design & Construction of a Real Shopping Center and Hypermarket
356ENKAOnshore Plant ServicesOil & Gas, PetrochemicalsAsiaKazakhstan2006-06-012007-02-01Construction of infrastructure of off plot works such as piping, pipelines, civil, electro-mechanical and instrumentation and maintenance works of the plant
355ENKASGP Onplot Multidiscipline Contract Purchase OrderOil & Gas, PetrochemicalsAsiaKazakhstan2005-04-012007-01-01Purchase of Paint and Insulation material
354ENKAConstruction of Cuttings Pits worksInfrastructureAsiaKazakhstan2005-08-012007-01-01Construction of 6 ea. (Totally 7,420 m³ Volume) Cuttings Pits including Concrete works and steel lining works
353ENKACapital Fit-out ShabalovskayaCivilEurasiaRussian Federation2006-05-012006-12-01Fit-out Works for the Shabalovkaya Office Building with a 8,000 m² net fit-out area
352ENKA4 x 360 MW Afşin Elbistan B Thermal Power PlantPower PlantEurasiaTurkey2000-06-012006-10-01In August 1998, ENKA formed a consortium with Mitsubishi Heavy Industries LTD. (MHI), Babcock Kraftwerkstechnik Gmbh and GTT to win the contract for the turnkey construction of a conventional-type coal-fired thermal power plant, with a nominal capacity of 4 x 360 MW Afşin Elbistan B Thermal power plant. This contract included the construction and installation of four steam turbojets, a flue gas desulphurization plant, a slag and ash handling system, a raw water supply system, a water treatment plan, a coal handling system, a cooling system, ancillary plants, generating plants and auxillaries, storage facilities and necessary workshops, operation and auxillary buildings as well as low, medium and high voltage switchgears, control and monitoring equipment and power transformers. Also called in the contract were the complete implementation of design as well as tests, trial runs, acceptance tests and maintenance until the temprorary acceptance date together with the training of all operational personnel and the provision of all necessary consumables. Steam generators were supplied by Babcock (Germany), steam turbines and the Fuel Gas Desulphurization (FGD) plant by MHI (Japan), the switchyard and the main and auxillary transformers by Alstom (France).
351ENKASED New USA Embassy Compound - Sierra LeoneCivilAfricaSierra Leone2004-01-012007-10-01Construction of a Standard Embassy Design New Embassy Compound of the USA on a land of 51,000 m²
350ENKASakhalin I Chayvo Onshore Processing Facility (OPF) ProjectOil & Gas, PetrochemicalsEurasiaRussian Federation2005-06-032006-10-01The Sakhalin-1 Project, operated by Exxon Neftegas Limited, is one of the largest single international direct investments in Russia and an excellent example of how advanced technologies are being applied to meet the challenges of the world’s growing energy demand. Over its years of production operations, the multi-billion dollar project has exhibited exemplary operational, environmental, and safety performance, and has provided significant benefits to Russia and its people. Located off the north-eastern shore of Sakhalin Island, the Sakhalin-I Project was developed within the framework of a product sharing agreement signed between a consortium of Russian, Indian, Japanese and U.S. companies and the Russian government. Having taken effect in 1996, the agreement covers the Chayvo, Odoptu and Arkutun-Dagi fields where potential recoverable resources are 307 million tonnes of oil and 485 billion cubic meters of natural gas Oil & gas produced from the Sakhalin-1 fields is transported to the Chayvo Onshore Processing Facility (OPF), which stabilizes oil for shipment to the international market and gas for supply to the Russian domestic market or re-injection to the field to maintain reservoir pressure. The OPF’s capacity is approximately 34,000 metric tons (250,000 barrels) of oil and 22.4 million cubic meters (800 million cubic feet) of gas per day.
349ENKASED New USA Embassy Compound - MaliCivilAfricaMali2003-12-012006-09-01Construction of a Standard Embassy Design New Embassy Compound of the USA on a land of 72,300 m²
348ENKARamstore 15 Shopping Centre, VernadskovoCivilEurasiaRussian Federation2005-01-012006-09-01Construction of a shopping center which consists of 5.580m² hypermarket, 1,300m² storage area with 45 check-outs and 53,300 m² mall including an aquapark and 6 halls multiplex cinema complex and 33,000 m² closed car parking and open car parking
347ENKAUS AID Office Building - GuineaCivilAfricaGuinea2005-01-012006-09-01Construction of a Standard Embassy Design US AID Office Building of the USA
346ENKAGelendjik AirportCivilEurasiaRussian Federation2006-06-012006-09-01Conceptual design for the development of the Master plan, architectural and technological concepts for a passenger terminal and service area facilities of Gelendjik Airport
345ENKAReal Hypermarket, TatarstanCivilEurasiaTatarstan-Russian Federation2006-06-012006-08-01Design & Construction of architectural, mechanical and electrical completion works in the Real Hypermarket
344ENKACapital Fit-out StrastnoyCivilEurasiaRussian Federation2006-03-012006-07-01Fit-out Works for the Strasnoy Office Building with a 8,000 m² net fit-out area
343ENKAINTEL KH1 ProjectCivilEurasiaRussian Federation2005-07-012006-04-01Fit-out works of office premises on the floors between 2 & 6 including all MEP and weak current systems
342ENKASenimdi Kurlyls Infrastructure Works EngineeringOil & Gas, PetrochemicalsAsiaKazakhstan2001-09-012006-03-01Engineering Contract for the off plot works for the existing Plant
341ENKASED New USA Embassy Compound - GuineaCivilAfricaGuinea2003-10-012006-03-01Construction of a Standard Embassy Design New Embassy Compound of the USA on a land of 50.000 m²
340ENKASGI Main Mechanical Installation (Nouvo Pignone; Contract OM 211)Oil & Gas, PetrochemicalsAsiaKazakhstan2003-11-262006-02-01Construction of Injection Compression area Mechanical Works including the structural steelwork erection, injection piping and installation of Nuovo Pignone Packages
339ENKASGI Electrical & Instrumentation Installation (Contract 571501-6-1088)Oil & Gas, PetrochemicalsAsiaKazakhstan2004-05-012006-02-01Construction of Sour Gas Injection project Electrical and Instrumentation Works
338ENKAProcter & Gamble Naberezhnaya Tower, Block BCivilEurasiaRussian Federation2005-06-012006-01-01Fit-out works of office premises within Moscow City Block B on 7 floors including all MEP and weak current systems
337ENKALesnaya Office Building Fit-out WorksCivilEurasiaRussian Federation2005-03-012005-12-01Fit-out works in the rentable office areas of Capital Group's "Lesnaya" office building at the address 4th Lesnoy per., Moscow
336ENKASED New USA Embassy Compound - CameroonCivilAfricaCameroon2003-10-012005-11-01Construction of a Standard Embassy Design New Embassy Compound of the USA on a land of 47.150 m².
335ENKAMoscow City Plot 10 The Naberezhnaya Tower Office Buildings Block B, Phase ICivilEurasiaRussian Federation2004-07-012005-11-01The Naberezhnaya Tower Project, an investment project entirely developed by ENKA, is located on 1,574 hectares of land in MIBC “Moscow City,” at the intersection of the Third Transport Ring and Krasnopresnenskaya Embankment. This region of the city is rapidly emerging as Russia’s new business capital. Prominently situated on the riverside, the buildings offer an awe-inspiring panoramic view of central Moscow across the Moscow River. The Naberezhnaya Tower project was a two-phase project, consisting of two buildings, 17 and 27 stories respectively, designated as A and B in Phase 1. The Tower, also referred to as Building C, is a 60-story skyscraper developed as Phase 2.Turn-key design and construction of a highrise "A Class" office building, Block B, having 27 storeys with a height of 110 m. The building has a glazed façade and all structure is reinforced concrete.
334ENKAReal Shopping Center and Hypermarket, SignalnyCivilEurasiaRussian Federation2004-08-012005-11-01Construction of a shopping center, including; Hypermarket, storage areas, underground parking with mall and open parking areas. External and internal infrastructural / utility lines are included in the works scope
333ENKARamstore 14 Shopping Centre, SivastopolskyCivilEurasiaRussian Federation2003-09-092005-09-01Construction of a shopping center including 4.400 m² hypermarket, 800 m² storage area with 28 check-outs, 25,000 m² mall and a multiplex cinema complex, 18,000 m² closed and open car parking
332ENKARamstore 16 Shopping Center, Udelny ParkCivilEurasiaRussian Federation2004-09-012005-08-01Construction of a shopping center, including; Mall, hypermarket, storage areas, multi-storey parking, multiplex cinema complex
331ENKAReal Shopping Center and Hypermarket, BrateevoCivilEurasiaRussian Federation2004-08-012005-07-01Construction of a shopping center, including; Hypermarket, storage areas, underground parking with mall and open parking areas. External and internal infrastructural / utility lines are included in the works scope
330ENKAPerinatal Medical Centre, Sivastopolsky Metro StationCivilEurasiaRussian Federation2004-04-012005-06-01Detailed design (including TEO and approvals) and construction of Perinatal Medical Centre with 103 beds including all M&E systems as well medical gas, garbage collection and vacuum dust systems
329ENKARamstore 19 Market Reconstruction and Restoration, BabushkinCivilEurasiaRussian Federation2005-03-222005-06-01Reconstruction and restoration of a Ramstore market
328ENKA5 Star Swissotel, Krasnye HolmyCivilEurasiaRussian Federation2003-04-012005-07-01Fully opened in September, 2005, the 235-key Swissôtel Krasnye Holmy is one of the most recent additions to the Riverside Towers Business Center. With its slim, circular-shaped tower and its antenna reaching a height of 160 m, the hotel is one of central Moscow’s tallest buildings. The hotel’s interior design is one grand flourish of contemporary style, befitting Moscow’s new image. The 37-story high-rise takes full advantage of its height to afford its spacious rooms and suites a clear view of Moscow with wall-to-wall, floor-to-ceiling windows. The rooftop bar, called City Space, commands a breathtaking 360-degree panorama. In addition, the hotel hosts three other bars, two restaurants, meeting and conference rooms, a full-floor banqueting facility, a health club with spa and swimming pool and a dedicated business lounge for its executive guests. A state-of-the-art room management system and high-speed and wireless telecommunication facilities make life easy for the guests. The building automation, fire protection and security systems surpass the highest international standards. Commencing in July, 2003, ENKA completed the turnkey construction of the hotel, which has a total construction area of 30,000 m², within 26 months, including installation of furniture, fixtures and equipment. The structure of the building is reinforced concrete, with a foundation sitting on 1,000 mm diameter piles that are 24 m long. The facade system is a combination of aluminum composite panel cladding, granite and stainless steel.Design & Construction of a 5 star Luxury Hotel having 30 storeys with a height of 120 m. The business hotel has 216 rooms. The building has a glazed façade and all structure is reinforced concrete.
327ENKASGI - SGP Additional Piling (Contract 571500-2-1697)Oil & Gas, PetrochemicalsAsiaKazakhstan2004-10-282005-05-01Installation of Piles
326ENKARamstore Market 2 Reconstruction and Refurbishment, Maryina RoschaCivilEurasiaRussian Federation2005-01-012005-03-01Refurbishment of the Ramstore market
325ENKAPhilip Morris Izhora Cigarette Factory Secondary ExtensionCivilEurasiaRussian Federation2003-10-012005-02-01Civil, steel structure, architectural, electro-mechanical and automation works of the Additional Production Unit, Technical Service Buildings and New DIET Building & Primary Building Extension to increase the existing 40 billion cigarettes/year output capacity of the factory to 70 billion cigarettes/year
324ENKAIKEA Mega Commercial Centre, KhimkiCivilEurasiaRussian Federation2003-09-012005-01-01The construction of the commercial center, which is an IKEA investment project is located in the Khimki district of of Moscow having 25,000 m² hypermarket , 138,000 m². Mega Mall comprising department stores, multiplex cinemas, shops, fastfood restaurants, foodcourts, wintergarden with ice rink,and mall management offices, 50,000 m² below deck parking and 210,000 m² open external parking areas, including all utility / infrastructure works.
323ENKASGI - SGP Frame Agreement 2003Oil & Gas, PetrochemicalsAsiaKazakhstan2003-08-012004-12-01Preparation of the site for the future plant construction works
322ENKARamstore Market 17 Refurbishment, IzmailovskyCivilEurasiaRussian Federation2004-09-172004-12-01Refurbishment of the Ramstore market
321ENKASGI Piling and Main CivilsOil & Gas, PetrochemicalsAsiaKazakhstan2003-04-012004-09-01Driving of piles on the plant area and construction of all plant foundations and all underground services including area fill
320ENKAMoscow City Plot 10 The Naberezhnaya Tower Office Buildings Block A, Phase ICivilEurasiaRussian Federation2003-08-012004-09-01The Naberezhnaya Tower Project, an investment project entirely developed by ENKA, is located on 1,574 hectares of land in MIBC “Moscow City,” at the intersection of the Third Transport Ring and Krasnopresnenskaya Embankment. This region of the city is rapidly emerging as Russia’s new business capital. Prominently situated on the riverside, the buildings offer an awe-inspiring panoramic view of central Moscow across the Moscow River. The Naberezhnaya Tower project was a two-phase project, consisting of two buildings, 17 and 27 stories respectively, designated as A and B in Phase 1. The Tower, also referred to as Building C, is a 60-story skyscraper developed as Phase 2.Turn-key design and construction of a high-rise "A Class" office building, Block A, having 17 storeys with a height of 70 m. The building has a glazed façade and all structure is reinforced concrete. It has been equipped with state-of-the-art mechanical and electrical systems. The tower is outfitted with a total of 28 elevators, consisting of eight low-rise, eight mid-rise and six high-rise passenger lifts with a speed of 8 m per second, as well as six fire and service lifts.
319ENKASGP Site Temporary FacilitiesOil & Gas, PetrochemicalsAsiaKazakhstan2003-08-012004-09-01Construction of one 2 storey office building, 8 pieces shelters in Place Buildings and 4 gate houses
318ENKABregana - Zagreb - Dubrovnik Motorway, Sections I & IIIInfrastructureEuropeCroatia1998-07-012004-07-01This important motorway project's total lenght amounts to 156 km and consists of two separate sections. Section I: Bregana-Jankomir Motorway (13 km), is a four lane link from the capital city Zagreb to the border of Croatia and Sloevenia, and was opened to traffic in December 2000. The other section, Bosiljevo - Sveti Rok Motorway (143 km) linking centrak Croatia to the Dalmatian Coast, opened in July 2014. The works also included the construction of bridges and viaducts reaching a length of 7,500 m. The motorway is considered vitally important as it provides the principal link between the Zagreb region in central Croatia and Dalmatian Coast. With this motorway, Croatia's Dalmatian Coast is now integrated with Europe's central and western highway network. The project is furhter distinguished for winning the 2004 Croation Contractor Safety Award, as it was sucessfully realized without any compromise in quality and safety.
317ENKA790 MW Rijnmond Energy Center ProjectPower PlantEuropeNetherlands2002-08-012004-06-01Design, engineering, equipment supply, construction and commissioning works of 790 MW Natural Gas Combined Cycle Cogeneration Power Plant consisting of a 2x2x1 combined cycle arrangement. There are two combustion turbine generators, two duct-fired heat recovery steam generators and a single steam turbine generator in the power island. The plant is capable of supplying 350 ton/hour export steam to the neighboring Shell Netherlands Refinery and the initial 125 ton/hour capability has been installed in the first phase. A mechanical draft cooling tower is utilized. The plant fires natural gas only. The combustion turbine generators were delivered by Siemens (Germany), the heat recovery steam generators by SFL (Netherlands), the STG is by Alstom Power (Germany), the DCS control systems are by ABB-Bailey (USA), Water Treatment Plant by US filter (USA), Main and Auxilary transformers by Areva (Turkey), Switchyard by Siemens (Turkey) and cooling towers by Balcke-Dür (Germany).
316ENKAKashagan Oil Field Exploration Project, Offshore Civil WorksOil & Gas, PetrochemicalsAsiaKazakhstan2001-03-012004-05-01Construction of artificial islands. Construction of ice protection barriers. Modification and extension of loading jetties in Bautino Base. Loading, transportation and installation of various types of concrete precast elements on Islands. Construction of underwater foundation berms for drilling rigs, grounded barges, and accommodation vessels. Construction of seawater intake structures. Extracting, loading and transportation of various types of fill material (quarry run, limestone armour rock). Supply batching plant and in-situ concrete. Stockpile management. Construction of steel structures. Support for diving operations. Support for rig-move operations. Maintenance and modification of existing facilities. Provision of various types of construction materials. Prepared/constructed and maintained various ramps/platforms for emergency escape vehicles. Installation of 3.200m length of pipeline. Installation of 5.900 m length of cable utilities. Construction of 4 ice protection barriers
315ENKASGP Site Preparation & Early CivilsOil & Gas, PetrochemicalsAsiaKazakhstan2002-08-012004-02-01Levelling and disposal of the top soil of the site, construction of access and interior roads, preparation of the laydown areas and fencing
314ENKAIkea Retail StoreCivilEurasiaTatarstan-Russian Federation2003-06-012004-02-01Turn key construction of Ikea Retail Store including all related infrastructural connections and outside carpark for 800 vehicles
313ENKATechnical Assistance Contract for the Performance of 5.028 Residential UnitsCivilAfricaLibya1997-11-012003-12-01Complete final design and Construction Management of 5,028 residential units. The contract excludes the supply of all the materials, machinery and equipment and local expenditures for the performance of the project
312ENKABenghazi Residential Unit ProjectCivilAfricaLibya1998-03-012003-12-01Turn-key construction of 25 nbr residential units
311ENKABeyda Construction ProjectCivilAfricaLibya1998-04-012003-12-01Turn-key construction of residential units
310ENKASGI - SGP Frame Agreement 2002Oil & Gas, PetrochemicalsAsiaKazakhstan2002-06-012003-12-01Various site preparation works
309ENKAIKEA St Petersburg Building MarketCivilEurasiaRussian Federation2003-03-012003-12-01Turn key construction of a shopping mall comprising show rooms and offices, including all related infrastructural works, as well asroad / car park for 2,000 vehicles and landscaping works of 77,000 m²
308ENKARamstore 12, PodolskCivilEurasiaRussian Federation2003-05-012003-10-01Renovation and transformation of an existing factory building into a shopping mall
307ENKARiverside Towers Square of Art, Phase 3C Finishing WorksCivilEurasiaRussian Federation2003-05-012003-09-01Stone cladding and decorative finishing works of Square of Art, Block 3C building, within the Moscow Cultural Center
306ENKAIKEA Obi Retail Stores in Komunarka and KhimkiCivilEurasiaRussian Federation2002-12-012003-07-01Turn key construction of 2 shopping malls, winter garden and officesincludingpiling, infrastructure and road / car park and landscaping works
305ENKANew American Consulate Office Building Construction - TurkeyCivilEurasiaTurkey2000-09-012003-06-01On January 24, 2001 the United States government renewed its commitement to its nearly 170 year presence in Istanbul with an official ground-breaking ceremony on the site of its new consulate building. The building in Istanbul's Istinye district on the Bosphprus provides spacious and modern facilities with increased security for the employees as well as the general public, visiting the consulate to make visa applications and for other consular services. Situated on a nine-hectare plot, the new building provides 8,000 m² of office space. Zimmer Gunsul Frasce Architects of Portland, Oregon are working together with Turgut Alton Architects of Istanbul, in the design of the new consulate. ENKA is working with Caddell as consultant in all aspects of the construction, including mechanical and electrical installations.
304ENKAİzmir Shipyard Commandership East Dock & Repair Jetty ConstructionCivilEurasiaTurkey2001-04-012003-06-01Construction of a dock of 250 m long and a repair jetty of 120 m long
303ENKAYukos Research & Development Laboratory Technology CenterCivilEurasiaRussian Federation2002-11-012003-05-01Turn keyrenovation works of a petrochemical research and development laboratory including all civil, architectural and M&E works
302ENKA1,520 MW İzmir Natural Gas Combined Cycle Power PlantPower PlantEurasiaTurkey2000-08-012003-03-01Established in 1997 as a 40%-60% partnership of ENKA and InterGen respectively, the InterGen-ENKA was awarded the right to build and operate the 1523 MW İzmir Natural Gas Combined Cycle Power Plant. The combustion turbine generators were supplied by General Electric (USA), steam turbine generators by Alstom Power (Germany), closed cooling system by EGI (Hungary), heat recovery steam generators by CMI (Belgium), switchyard by Siemens (Turkey-Germany), main and auxiliary transformers bu Alstom (Turkey), water treatment plant by Aquatech-ENKA Teknik (USA-Turkey), gas RMS systems by ENKA Teknik (Turkey) and DCS control systems by ABB-Bailey (USA).
301ENKAConstruction of Administrative Complex at Paveletskaya Railway Station Square, Stage BCivilEurasiaRussian Federation2002-02-012003-03-01Design and construction of the Paveletskaya Square Business center, Stage B,a "Luxury Class" Office Building having 27 storeys with a height of 110 m. The building has a build up façade (gas block / brick + heat insulation + plaster + paint) and all the structure is reinforced concrete.
300ENKAOffice Complex for the Embassy of JapanCivilEurasiaRussian Federation2002-03-012003-03-01Construction of Foundations with a diaphragm wall, the excavation and the civil works up to the ground level 0.00
299ENKAGUM Reconstruction Works - Stage 2CivilEurasiaRussian Federation2002-08-052003-03-01Installation of new pedestrian bridges / escalators andrefurbishment of interiorof a historical building, the Shopping Center GUM
298ENKAMoscow International House of Music, Phases 1 & 2CivilEurasiaRussian Federation2001-03-012002-12-01Home to world famous Russian violinist and conductor Vladimir Spivakov’s “Virtuosi of Moscow” Chamber Orchestra, the International House of Music is one of the largest concert halls in the world. It also has the distinction of being the first concert hall built in the city of Moscow for classical music in the last 100 years. The building encompasses a 1,800 seat grand philharmonic concert hall, a 575 seat chamber music concert hall, a 532 seat multifunctional theatre hall, as well as several rehearsal halls of various sizes, audio-visual recording studios, restaurants, cafes, shops, administrative premises and a two-story underground car park. The primary component of the music house is a rounded spatial structure topped with a cupola, formed by an elegant blend of glass and stainless-steel architectural elements. In the interior decoration of the building, wooden elements were widely used to provide superior acoustics. The structure houses two of the three concert halls, configured with one atop the other, each designed with separate entrances and lobbies. One of the rehearsal halls is large enough to accommodate a philharmonic orchestra and allows for the highest quality audio recordings possible. To this end, for protection from external vibrations, the concert and rehearsal halls have all been isolated from the ground by inserting special neoprene elements between the lower and upper parts of the load-bearing structures. This grand music house first opened its doors to guests in December, 2002. Since 2003, this magnificent venue has welcomed numerous famed Russian and international musicians, artists and orchestras to perform under its cupola.
297ENKARamstore 11 Hypermarket and Shopping Center Ramstore City, LeningradskyCivilEurasiaRussian Federation2002-05-012002-12-01Construction of a shopping center, including 8,720 m² hypermarket with 41 pay desks, 1,700 m² storage area, 28,000 m² mall and a multiplex cinema complex with 23,600 m² with covered car parking
296ENKARiverside Towers Phase 3C - ParkingCivilEurasiaRussian Federation2002-06-012002-12-01Construction of the entrance structure and multi-storey car parking for the Moscow International House of Music
295ENKASGI Facility Site Preparation and RoadsOil & Gas, PetrochemicalsAsiaKazakhstan2002-06-012002-12-01Levelling of the project top soil, laying of 50 cm construction mat, construction of roads and fencing
294ENKA1,540 MW Gebze Natural Gas Combined Cycle Power PlantPower PlantEurasiaTurkey2000-04-012002-10-01Established in 1997 as a 40%-60% partnership of ENKA and InterGen respectively, the InterGen-ENKA was awarded the right to build and operate the 1554 MW Gebze Natural Gas Combined Cycle Power Plant. The main components for the power plant were delivered by companies from a number of countries. The combustion turbine generators were supplied by General Electric (USA), steam turbine generators by Alstom Power (Germany), closed cooling system by EGI (Hungary), heat recovery steam generators by CMI (Belgium), switchyard by Siemens (Turkey-Germany), main and auxiliary transformers bu Alstom (Turkey), water treatment plant by Aquatech-ENKA Teknik (USA-Turkey), gas RMS systems by ENKA Teknik (Turkey) and DCS control systems by ABB-Bailey (USA). The first ignition of the Gebze plant was performed on November 10,2001. On November 2014, the EMRA (Republic of Turkey Energy Market Regulatory Authority) issued Electricity Generation Licenses, for Gebze Elektrik Üretim Ltd. Şti. , Adapazarı Elektrik Üretim Ltd. Şti. and İzmir Elektrik Üretim Ltd. Şti.
293ENKA770 MW Adapazarı Natural Gas Combined Cycle Power PlantPower PlantEurasiaTurkey2000-04-012002-10-01Established in 1997 as a 40%-60% partnership of ENKA and InterGen respectively, the InterGen-ENKA was awarded the right to build and operate the 777 MW Adapazarı Natural Gas Combined Cycle Power Plant.The combustion turbine generators were supplied by General Electric (USA), steam turbine generators by Alstom Power (Germany), closed cooling system by EGI (Hungary), heat recovery steam generators by CMI (Belgium), switchyard by Siemens (Turkey-Germany), main and auxiliary transformers bu Alstom (Turkey), water treatment plant by Aquatech-ENKA Teknik (USA-Turkey), gas RMS systems by ENKA Teknik (Turkey) and DCS control systems by ABB-Bailey (USA).
292ENKARamstore 10 Hypermarket and Shopping Center, BelyaevaCivilEurasiaRussian Federation2002-02-012002-10-01Hypermarket, store / shop, underground car parking, movie theatre complex and offices, including outside parking area and infrastructure works
291ENKAFritolay Salty Snack Food Factory, Stage 2CivilEurasiaRussian Federation2001-12-012002-09-01Completion of the construction of a salty snack food factory with a closed manufacturing area of 10,160 m² and an office building with an area of 2,376 m² including mechanical, electrical, partial processing installation and finishing works. The project also includes the infrastructure works and the construction of a sewage treatment plant
290ENKAKursky Cinema ProjectCivilEurasiaRussian Federation2001-12-012002-05-01Reconstruction of the 3rd and 4th floors of an existing building into 8 halls of Cinemas including a foyer and bar. The project also includesmechanical, electrical and finishing works
289ENKADanone Food Manufacturing Plant - Extension Works, Phase 5CivilEurasiaRussian Federation2001-08-282002-01-01Extension works for loading docks and waste water treatment plant's concrete works for the Danone Plant
288ENKAShopping Center DesignCivilEurasiaRussian Federation2001-11-012002-01-01Conceptual design works of a shopping center in Perm
287ENKAE+K Sadovaya Plaza Office BuildingCivilEurasiaRussian Federation2001-03-012001-12-01Sadovaya Plaza is located on a 2,200 m² plot of land at the junction of Dolgorukovskaya Street and the Garden Ring in Moscow. The plaza is a 15 storey office building with two levels of underground parking. The building features a double-height lobby, four large-capacity hight speed lifts, individually controlled heating, ventilation and air-conditioning systems with ceiling-mounted fan coil units, a full sprinkler system, raised floors, building automation system, an access control system at the entrance to the building and security systems. The building has been fitted out in accordance with the tenant's requirements.
286ENKAGUM Reconstruction WorksCivilEurasiaRussian Federation2001-07-012001-12-01Construction of new Pedestrian Bridges and Escalators in the Shopping Mall
285ENKADanone Food Manufacturing Plant Extension WorksCivilEurasiaRussian Federation2001-04-012001-06-01Extension to the existing buildings of the milk products plant constructed in Phase 2
284ENKATripoli Construction ProjectCivilAfricaLibya1996-11-012001-05-01Turn-key construction of 14 nbr residential units
283ENKATengiz Oil Fields Development Off Plot (Contract OM 133)Oil & Gas, PetrochemicalsAsiaKazakhstan1993-07-162001-03-01Design and infrastructure of off plot works such as piping, pipelines, civil, electro-mechanical and instrumentation works for the refurbishment of the plant and camp for 10,000 workers
282ENKARamstore 9 Supermarket & Fast Food Restaurant, SokolCivilEurasiaRussian Federation2000-11-012001-03-01Architectural, mechanical and electrical restoration of the first and second floors of an existing building to be used as a supermarket and a fast food restaurant
281ENKARamstore 6 Supermarket & Shopping Center, KashirskayaCivilEurasiaRussian Federation2000-05-102001-01-01Construction of a supermarket with a floor area of 9,808 m², a three storey shopping center with a floor area of 17,153 m² and a warehouse with a floor area of 3,067 m²
280ENKARefurbishment of the existing Sulphur Recovery Unit 2.1 & 2.2 and LPG Unit 700/200 in KTL 1 and Crude Oil Tankfarm in the Tengiz Oil Processing Facilities (Program 12)Oil & Gas, PetrochemicalsAsiaKazakhstan1999-12-012000-12-01The contract for the Program 12 project was signed between the ENKA-Bechtel joint venture and Tengizchevroil in December 1999. The project consists of 3 sections: Sulphur Recovery Works at KTL 2.1 & KTL 2.2 - LPG Unit 700/200 in KTL 1 - Crude Oil Tankfarm Construction, piling, erection of steel structure, piping works, insulation, testing and commissionning for the refurbishment of the Tengiz Oil Processing Facilities
279ENKAINTEL Office RenovationCivilEurasiaRussian Federation2000-08-012000-12-01Renovation works of the 6th and 7th floors of the Intel Company including centralized M&E works and furniture
278ENKARamstore 8 Supermarket, MarinoCivilEurasiaRussian Federation2000-09-042000-12-01Architectural, mechanical and electrical restoration of the first floor of an existing building as a supermarket
277ENKARenovation of the Main Building Offices of the Ministry of Finance, İlyinka 9CivilEurasiaRussian Federation2000-02-012000-11-01Renovation of the main building offices
276ENKACrude Oil Export ProjectOil & Gas, PetrochemicalsAsiaKazakhstan2000-03-012000-10-01Modifications on the storage tanks of 10,000 m³ capacity, Booster pumps, Export pumps, 10" Lines to the Rail Loading rack, Electrical substation
275ENKARamstore 7 Supermarket, TrivagzalCivilEurasiaRussian Federation2000-07-102000-10-01Architectural, mechanical and electrical restoration of the first floor of an existing building as a supermarket
274ENKAKTL 2.3 Additions to Tengiz Oil Processing Facilities (Train 5)Oil & Gas, PetrochemicalsAsiaKazakhstan1997-06-262000-08-01The Train 5 project entailed the construction of a process group with an annual capacity of 2.5 million tons. The project contributed to the increase in the crude oil production capacity to 12 million tons of sweet crude per year as forecast in Tengizchevroil's 5-year business plan. The project involved the engineering, supply of equipment and materials, and construction of the processing unit for crude separation, desalting, condensate srtipping, H2S removal and NGL recovery. The auxiliary units, built in addition to the main processing units, were a 2x40 MW gas turbine generator station, a 110 KV switchyard power management system, a high-pressure boiler plant, a nitrogen unit and a 100 ton/hour water treatment plant.
273ENKARamstore 5 Supermarket & Fast Food Restaurant, MitinoCivilEurasiaRussian Federation2000-03-012000-06-01Architectural, mechanical and electrical restoration of an existing building. The first floor is used as a supermarket of 3,018 m² and the second floor as a fast food restaurant of 2,667 m²
272ENKAAmra Housing ProjectCivilAfricaLibya1994-01-012000-05-01Turn-key construction of 300 farm houses in Amra area. The project also includes construction of social buildings and Ibni Sina Hospital of 1,500 m²
271ENKADanone Food Manufacturing PlantCivilEurasiaRussian Federation1998-08-012000-03-01Construction of milk products plant including process, warehousing, office buildings, external infrastructure works, roads, waste water treatment plant and r.c. water reservoir
270ENKABautino Supply Base 99 ProjectOil & Gas, PetrochemicalsAsiaKazakhstan1999-09-012000-03-01Construction of a sewage treatment plant, 8 km HV overhead line / transformer building and supply and installation of one 400 kVA generator set
269ENKABaku International Airport Renovation of ATC-Air Traffic Control BuildingCivilAsiaAzerbaijan1999-10-012000-03-01Renovation of the 3 floors of the Air Traffic Control Building
268ENKASOS Children Village ProjectCivilAsiaAzerbaijan1999-08-012000-02-01Construction of one storey family houses and service buildings for lodging and schooling of orphan children
267ENKAMessebo Cement FactoryCivilAfricaEthiopia1997-02-011999-12-31The construction of a cement factory with 2,000 t/day capacity, located at 7 km from Mekele in the northern part of Ethiopia. The project encompassed all the civil and structural works, supply and installation of the structural steel, and the entire mechanical erection works. The mechanical equipment was provided by F.L. Smith of Denmark. The annual capacity of the plant is 600,000 tons and it is capable of producing portland cement with or without additivies.
266ENKAApartment at ZvenigorodskayaCivilEurasiaRussian Federation1999-04-071999-12-01Construction of 7 storey apartment building with an underground garage
265ENKARamstore 2 Multifunction Trade Center Additional Works, Maryina RoschaCivilEurasiaRussian Federation1999-05-011999-12-01Fit out and decoration works at mall section and infrastructural works out-side of the fence boundaries of the Ramstore 2
264ENKARamstore 3 & 4 Markets Renovation, Sokolniki & ChertonovoCivilEurasiaRussian Federation1999-08-011999-11-01Renovation of 2 hypermarkets
263ENKAAktau Port Rehabilitation ProjectInfrastructureAsiaKazakhstan1997-05-011999-09-01Aktau is Kazakhstan's main port on the Caspian Sea and serves as the major logistics base for the offshore oil fields. The ENKA-Bechtel joint venture signed the contract with Kazakhstan's Ministry of Transportation for the Aktau Port rehabiliation project. The contract included elevating the port by two meters, replacing all the port utilities, and constructing a new 550 m pile supported quay, a new railroad, a port administation building and a 6,500 m² transit shed as well as additional auxiliary buildings. The port had to be kept operational throughout construction.
262ENKABautino Supply Base Construction ProjectOil & Gas, PetrochemicalsAsiaKazakhstan1998-05-011999-09-01ENKA and joint venture partner Bechtel were awarded a contract for the construction of a Marine Supply Base to support the drilling operations at the Kashagan Oil Field. The project comprised the engineering, supply of materials and equipment and construction of a compund with storage and core processing facilities, a sewager treatment plant, a quay, administrative buildings and accomodation facilities.
261ENKARiverside Towers Additional Fit-out WorksCivilEurasiaRussian Federation1999-06-251999-09-01Interior decoration, partioning of an office building
260ENKABautino Quarrying Graded Rock for Appraisal Berms in Kashagan Oil Field ProjectOil & Gas, PetrochemicalsAsiaKazakhstan1998-08-011999-08-01Rock extraction from 2 quarries for offshore civil projects at Kashagan field
259ENKA1,400 MW Bursa Natural Gas Combined Cycle Power PlantPower PlantEurasiaTurkey1996-05-011999-06-01The Japanese-Turkish consortium of MHI-ENKA-MC-ITC was awarded the contract to build a 1,400 MW natural gas fired combined cycle power plant in Bursa on a turn-key basis. Using the latest technology, the Bursa power plant stood out as the largest and most efficient power plant of its period in Turkey. The project encompassed all civil works, sub and superstructures, and supply of auxiliary components. It also included the supply, installation, testing and putting into operation of the mechanical and electrical systems at the power plant. The main components were supplied from Japan by MHI. The project was financed by JEXIM and a number of commercial banks. The main plant consists of two power blocks. Each has a set of two combustion turbines/generators, two heat recovery steam generators, one steam turbine/generator and closed cooling water system with a 135-m natural draft dry cooling tower.
258ENKABaku International Airport Rehabilitation and Expansion of Main Terminal Buildings and ATC TowerCivilAsiaAzerbaijan1998-01-011999-06-01Rehabilitation and Expansion works of the Terminal Buildings of the Baku International Airport in Azerbaijan, with a capacity of 5,000,000 passengers/year and the Air Traffic Control Tower. The project also includes 25 cm thick reinforced concrete apron works with an area of 11,000 m²
257ENKAGerede-Ankara and Ankara Peripheral MotorwayInfrastructureEurasiaTurkey1987-01-011999-05-01ENKA and Bechtel began the design and construction of the motorway in 1987. The 120 km Gerede-Ankara section is 2x3, and the 110 km Ankara peripheral section is a 2x4 lane motorway. There are six interchanges on the Gerede-Ankara section and 14 interchanges on the Ankara peripheral section, as well as 22 viaducts, 3 bridges, 63 under and overpasses. The Gerede-Ankara section of the project was opened to traffic on October 28, 1992. At the peak of construction, a workforce of 6,300 was employed.
256ENKAFritolay Salty Snack Food Factory, KashiroCivilEurasiaRussian Federation1998-06-011999-04-01Turn-key construction of a salty snack food factory including mechanical and electrical works
255ENKAMinistry of Finance 3rd Building, İlyinka 6CivilEurasiaRussian Federation1998-08-011999-02-01Restoration of the 3rd Building of the Ministry of Finance of the Russian Federation
254ENKAMars Warehouse Food Factory, StupinoCivilEurasiaRussian Federation1998-05-011999-01-01Turn-key construction of a warehouse including mechanical and electrical works
253ENKATengiz Chevroil KTL and off Plot DebottleneckingOil & Gas, PetrochemicalsAsiaKazakhstan1996-11-041998-11-01Under the contract between the ENKA-Bechtel joint venture and Tengizchevroil, which included the provision of engineering, procurement and construction services for the debottlenecking project, additional units where built in order to increase the capacity of certain processes, previously limiting the productivity of the pre-treatment plant. Crude oil separation and stabilization, amin regeneration, and gas separation and treatment units were the main components, built in order to incease the capacity of the plant. Following the completion of the project in 1998, the plant's annual capacity increased from 6 to 8.5 million tons/year.
252ENKARamstore 2 Multi-function Trade Center, Maryina RoschaCivilEurasiaRussian Federation1998-04-011998-10-01Procurement and construction of a hypermarket, store and shop offices group with a total floor area of 8,000 m² and a shopping mall with a total floor area of 24,700 m² in three floors including infrastructural works and parking area
251ENKARiverside Towers Phase 3ACivilEurasiaRussian Federation1997-03-011998-09-01Design and construction of the 1st part of the 3rd stage of the Russian Cultural and Business Center as "A Class" office.The building has 17 storeys + 1 basement. Rentable area is 14,192 m². ENKA's investment project with 52 % share
250ENKAFORD Dealership ComplexCivilEurasiaRussian Federation1998-04-021998-08-01Turn-key construction of FORD service, showroom and spare parts warehouse buildings
249ENKAHarawa Housing ProjectCivilAfricaLibya1992-07-011998-07-01Turn-key construction of warehouses, office buildings, water reservoir, 2,5 km of pipeline, a family camp of 62 buildings
248ENKAPaveletskaya Business and Trade Center Stage CCivilEurasiaRussian Federation1997-09-011998-07-01Design and construction of a business and trade center. The building has 14 storeys + 3 basement
247ENKARenovation and Widening of Golden Horn BridgeInfrastructureEurasiaTurkey1994-03-011998-06-01Turn-key construction of the renovation and widening of the existing Golden Horn Bridge by 2 new steel bridges with 2 lanes on each side
246ENKARiverside Towers Phase 2DCivilEurasiaRussian Federation1997-06-011998-04-013rd part of the 2nd stage of the Russian Cultural and Business Center as "Luxury Class" office. The building has 16 storeys + 2 basements
245ENKAMaly Gum BuildingCivilEurasiaRussian Federation1997-04-011998-03-01Reconstruction and restoration of a XIX Century building. The building will be accommodating trade halls, offices and a warehouse in the basement
244ENKAIstanbul Metro Project, Stage I, Section IIInfrastructureEurasiaTurkey1992-09-011998-02-01Istanbul's dreams of an underground transporation network were deferred until the early 1990s although designs had been in place for decades. Following the 1992 decision to construct the present line between Taksim and Levent, ENKA and its joint ventures, signed the contract with the İstanbul Metropolitan Municipality for Stage I, Section II. The project entailed the construction of 10,250 m. long metro tunnel and 3 stations each having a length of 180 m. Distances between stations are 1,430 m. and 1,310 m. The New Austrian Tunnel Method was employed in the construction of the tunnels.
243ENKACivil and Installation Works of VII th Section of the AKSAZ Naval Base, MarmarisCivilEurasiaTurkey1994-05-011998-02-01Construction of a jetty of 140 m (and additional extention of 325 m) length on steel piles and a pier of 140 m length (and partial construc-tion of 2 additional piers 140 m length each) at 12 m water depth. Construction of various military facilities, a helicopter pist and related facilities, infrastructual works, cable channels, roads. Supply (including foreign supply) and erection of mechanical and electrical works for the military base
242ENKAMinistry of Finance 4th BuildingCivilEurasiaRussian Federation1997-07-011998-01-01Restoration & renovation of the 4th Building of the Ministry of Finance of the Russian Federation
241ENKAMoscow Tax Inspectorate Buildings ComplexCivilEurasiaRussian Federation1994-12-011997-12-01Complete design and construction of the Complex of Administrative Buildings for Moscow Tax Inspectorate
240ENKARiverside Towers Phase 2CCivilEurasiaRussian Federation1996-04-011997-12-01Design and construction of the 2nd part of the 2nd stage of the Russian Cultural and Business Center as "Luxury Class" office. The building has 10 storeys + 2 basemens for parking area. Rentable area is 9,024 m²
239ENKAPaveletskaya Business and Trade Center Stage ACivilEurasiaRussian Federation1997-03-011997-12-01Paveletskaya Business Center, located on a 1.26 hectare plot of land on Paveletskaya Square on the Garden Ring, is one of ENKA's major development projects in Moscow. The building has 13 storeys + 1 basement.
238ENKAMars Luzhniki Petfood Plant Extension Phase 4, StupinoCivilEurasiaRussian Federation1997-06-011997-11-01Turn-key construction of packaging building and warehouse including mechanical and electrical works
237ENKARamstore 1 Multifunction Trade Center, MaladoznayaCivilEurasiaRussian Federation1997-04-011997-10-01Turn-key construction of a hypermarket, store and offices complex and a shopping mall including infrastructural works
236ENKAOdessa Port Plant Headquarter and Administration Building - Stages 1 & 2CivilEuropeUkraine1996-09-011997-09-01Turn-key renovation works of the administration building of a fertilizer complex, consisting of one 12 storey and one 4 storey office buildings
235ENKAJaarif Housing ProjectCivilAfricaLibya1993-01-011997-08-01Turn-key construction of 50 villas in Jaarif. The project includes also construction of social buildings, 2,000 m² of offices, 3,500 m² of recreational area, a swimming pool, 103,000 m² of landscaping and furniture supply
234ENKASupreme Court BuildingsCivilEurasiaRussian Federation1996-04-011997-08-01Construction of 4 separate buildings
233ENKAMars Nut Processing Plant and Mezzanine ExtensionCivilEurasiaRussian Federation1996-11-011997-06-01Turn-key construction of nut processing plant including supply of process equipment, construction of utility access bridge connection of nut plant
232ENKATschist Porous Gas Concrete, Roof Tile, Lime and Dry Mortar FactoriesCivilEuropeBelarus1993-07-011997-04-01All civil and building works, structural steel works and electro-mechanical erection works for the turn-key building materials production complex undertaken by the consortium Klöckner Industrie Anlagen-Preussag Anlagen-ENKA. The main units of the complex are the lime factory, the gas concrete factory, the concrete roof tile factory, supporting operation facilities and infrastructures
231ENKADomodedova Airport Cargo TerminalCivilEurasiaRussian Federation1996-08-011997-04-01Construction of Cargo Terminal at Domodedova Airport consisting of 8,457 m² storage facilities and 3,200 m² administrative buildings
230ENKAMinistry of Finance 6th Building RefurbishmentCivilEurasiaRussian Federation1996-07-011997-01-01Restoration of the 6th Building of the Ministry of Finance. The project also includes finishing works, renovation of electro-mechanical systems and modernization of a kitchen for 1,500 persons
229ENKAKumtor Gold MineInfrastructureAsiaKyrgyzstan1994-07-011996-12-01ENKA and its Canadian partner Kilborn have undertaken EPCM and construction works at Kumtor gold mine site at 4,200 m. above sea level in Kyrghyzstan. The project also includes site services, mine, tailings disposal, 42 km of access roads, power supply and training facilities
228ENKABakulev Institute of Cardiology, Stage IICivilEurasiaRussian Federation1994-09-011996-12-01Design, construction and turn-key completion of the finishing works of the second stage construction. The turn-key project also includes the supply and erection of electro-mechanical works
227ENKA150 Bed Gubkinsky Hospital, Tymen RegionCivilEurasiaRussian Federation1994-05-011996-10-01Design and turn-key construction of a 150 bed hospital. The turn-key project also includes the supply and erection of electro-mechanical works
226ENKARiverside Towers Phase 2ACivilEurasiaRussian Federation1996-02-011996-10-01Design and construction of the 1st part of the 2nd stage of the Russian Cultural and Business Center as "Luxury Class" office. Block A has 10 storeys+2 basements. Rentable area is 6.090 m². ENKA's investment project with 52 % share
225ENKAChaplygina House Office BuildingCivilEurasiaRussian Federation1996-02-011996-09-01Construction of a 6 storey Office Building
224ENKARenovation of the Transneft Office BuildingCivilEurasiaRussian Federation1996-03-011996-07-01Refurbishment of an existing 5 storey building as an Office Space including electro-mechanical works
223ENKARestoration of Ministry of Finance 2nd BuildingCivilEurasiaRussian Federation1995-08-011996-05-01Restoration of the 2nd Building of the Ministry of Finance of Russian Federation
222ENKATechnostroj-export Office RefurbishmentCivilEurasiaRussian Federation1996-03-011996-05-01Refurbishment, internal finishing and decoration works of an existing office building
221ENKARiverside Towers Phase 1CivilEurasiaRussian Federation1995-07-011996-04-01Design and construction of the 1st stage of the Russian Cultural and Business Centers "luxury Class" office. Block A has 16 storeys+1 basement Block B has 13 storeys+1 basement Block C has 7 storeys+1 basement Block D consists of 1 basement
220ENKADerna Al-Bumba Water ProjectInfrastructureAfricaLibya1986-12-011996-03-01Turn-key engineering, civil and building works, erection and supply of all electromechanical plant and services, supply, commissioning and training for a Project comprising: 110 km of water supply pipeline with ductile iron pipes dia. 600, 40 nbr. washouts and 41 nbr. air release chambers. 7 nbr. above ground concrete water reservoirs between 1,000-5,000 m³ and their electro-mechanical equipment. 4 nbr. elevated water reservoirs with 250 m³ capacity. 4 nbr. pump stations and their electro-mechanical equipment. Telecom./telemetry system and station control for whole system. 12 km of 11 KV medium voltage overhead power line
219ENKAEgorlykskaja Military Housing ProjectCivilEurasiaRussian Federation1995-03-011996-02-01Design and turn-key construction of a residential complex with 401 dwelling units including social and technical buildings such as a kindergarten, heating plant, a sewage treatment plant with the complete infrastructure
218ENKAYolocky Cottages and Health Center, DomodedovaCivilEurasiaRussian Federation1994-12-011996-01-01Design and turn-key construction of 9 cottages and a health center with infrastructural works
217ENKAHarawa Housing ProjectCivilAfricaLibya1992-04-011995-12-01Following the completion of the Great Man-made River project in Libya, a 30x40 km expanse of land was selected for a new agricultural settlement. In 1991, ENKA signed a frame contract for the turn-key construction of 150 villas and 600 farm houses, including social and technical buildings, water reservoir, pipelines, roads and infrastructure, with a total construction area of 180,000 m². Under this comprehensive contract, the project's goal to turn arid desert into cultivatable and a habitable settlement materalized in several stages between 1991 and 2001.
216ENKAPodreskova Ceramic Production PlantCivilEurasiaRussian Federation1993-11-011995-12-01Rehabilitation and expansion of the existing ceramics and glazed tiles factory with additional facilities
215ENKAMOSENKA Office Building No: 4 - TaganskayaCivilEurasiaRussian Federation1994-12-011995-12-01Design and construction of a modern business complex owned by MosENKA JV and rented or sold to foreign companies
214ENKASretENKA Office and Residential ComplexCivilEurasiaRussian Federation1994-12-011995-12-01Turn-key design, renovation and reconstruction of 7 ancient buildings with an underground car park in the historical center of Moscow creating a mixed use office and residential complex
213ENKATsvetnoy Office and Residential BuildingCivilEurasiaRussian Federation1994-12-011995-12-01Turn-key design and reconstruction of a prerevolution imperial building
212ENKAMOSENKA Office Building No: 6CivilEurasiaRussian Federation1995-05-011995-12-01Design and construction of the 4 storey "Luxury Class" Office Building with basement garage
211ENKAGrozni Reconstruction WorksCivilEurasiaRussian Federation1995-09-011995-11-01State House and 10 Buildings Reconstruction Works
210ENKAGas Pipeline ConstructionOil & Gas, PetrochemicalsAfricaAlgeria1995-01-011995-10-01
209ENKAMars Confectionery Plant, Phase 1, StupinoCivilEurasiaRussian Federation1994-06-011995-07-01As Russia continued to attact foreign investment, ENKA's client portfolio also diversified as demonstrated by the turn-key contract awarded to ENKA for the contstruction of the 30,000 m² Mars Confectionery Plant. The plant in Stupino, located 120 km south of Moscow, occupies a 40 hectare plot of land. The project included the construction of a snack food building, office building, energy building, warehouse, waster water treatment plant, raw water treatment plant and all necessary utilities and services works.
208ENKAMOSENKA Office Building No: 5CivilEurasiaRussian Federation1995-01-011995-07-01Design, reconstruction and renovation of the existing 4 storey & basement prerevolutionary Police + Fire Station to a "Luxury Class" Office Building
207ENKASirte Housing ProjectCivilAfricaLibya1991-07-011995-04-01Turn-key construction of fully furnished high quality 59 villas including services buildings, roads and infrastructure in Sirte
206ENKATschaikowski Military Housing ProjectCivilEurasiaRussian Federation1992-12-091995-03-01In 1993, ENKA signed the contract for the construction of the 250 bed hospital as a part of the Tchaikovsky military housing project. The contract included the delivery and installation of medical equipment, supplied both from local and international manufacturers. The building has a total construction area of 30,000 m² and is equipped with fully automated HVAC, fire fighting, security and medical gas systems.
205ENKARestoration of Ministry of Finance 1st BuildingCivilEurasiaRussian Federation1994-06-011995-03-01Restoration of the Building of the Ministry of Finance of Russian Federation
204ENKATurkish Embassy Building ExtensionCivilEurasiaRussian Federation1994-10-011995-01-01Construction of a residential extension to the Turkish Embassy
203ENKAMOSENKA Office Building No: 3 (MOSENKA Plaza)CivilEurasiaRussian Federation1994-05-011994-12-01Reconstruction of the 8 storey "Luxury Class" Office Building with basement garage
202ENKARussian Federation Parliament Buildings (Duma) ReconstructionCivilEurasiaRussian Federation1994-07-061994-09-30Reconstruction and renovation of two buildings
201ENKAKrasnodar Military Housing ProjectCivilEurasiaRussian Federation1993-02-011994-08-31Design and turn-key construction of a residential complex with 2004 dwelling units including social and technical buildings and the furnishing thereoff with the complete infrastructure. The scope also includes a 50 MW combined cycle heating & power plant for electricity, heat, hot water and steam supply. The project in Krasnodar is the largest of a series of residential settlements, constructed for the Ministry of Defense of the Russian Federation. The project covers the turn-key design and construction of 2,004 apartments, complete with infrastructure as well as social and technical buildings, with a total construction area of 285,000 sqm, and a 62 MW electricity and heating center. During construction, ENKA was able to overcome the challenges posed by the swamped ground conditions and abnormal drops in temperature to levels as low as -25 °C. ENKA met the intermediate contract milestone to hand over 1,200 units in 11 months from contract signature date to 31 December 1993, by implementing accelerated construction measures and low temperature work procedures. The completion of the project on August 31, 1994 marked a further achievement for ENKA despite adverse climatic conditions. Throughout the construction period, ENKA worked in close cooperation with the local authorities and organizations to ensure effective implementation of the project.
200ENKAPrenzlauer Karree Office / Exhibition Center ConstructionCivilEuropeGermany1993-05-011994-08-01Turn-key construction of 7 storey office / exhibition center building
199ENKAExtension for Ras Lanuf New Town Phase 1 & 2CivilAfricaLibya1990-03-011994-06-01Design and turn-key construction of 360 houses with garage, 1 preparatory school, 1 multi-purpose office and one 56 bed hospital with a total floor area of 10,000 m². The project also includes all infrastructure works, landscaping, natural gas network system, telecommunication system, 11 KV energy system, transformer buildings and interior furnishing of the houses. The second mega-project of the Libyan Petroleum Ministry is the Ras Lanuf New Town Construction. In 1986, ENKA had completed the first part of this project encompassing 1,129 villas, 5 hotels and motels, 5 housing compounds, a primary school, kindergardeni snd supermarket, complete with all auxiliary facilities and the necessary structure and had handed over Ras Lanuf New Town with a magnificient inaguration ceremony. ENKA subsequently undertook the additional construction for the Ras Lanuf town. The additional construction is worth approximaltely, 90 millon USD and covers a 60,000 m² area, emcompassing 360 villas and a number of social buildings. As foreseen by the work-program, the extension works are to be completed in 1993.
198ENKAToyota-Sa Automobile Factory ProjectCivilEurasiaTurkey1992-04-011994-04-01The plant located in Adapazari, is a ToyotaSA investment. With a production capacity of 100,000 cars per year, it ranks as third among the 35 Toyota factories in the world. The project comprised the construction of an automobile factory including 22 process buildings and 7 service buildings. The project also includes electrical and mechanical installations, roads, parking areas and landscaping.
197ENKABakulev Institute of Cardiology, Stage ICivilEurasiaRussian Federation1991-03-011994-03-01Design, and turn-key completion of 8 units. The turn-key project also includes the supply and erection of electro-mechanical works
196ENKATschaikowski 215 Apartment Housing ProjectCivilEurasiaRussian Federation1993-04-011994-03-01Design and turn-key construction of a residential complex with 215 dwelling units including kindergarten with swimming pool, post office, dairy, market,with the complete infrastructure works
195ENKAMOSENKA Office Building No: 2CivilEurasiaRussian Federation1993-07-011994-03-01Reconstruction and renovation of the existing 6 storey "Luxury Class" Office Building
194ENKARussian Federation Government House (White House) ReconstructionCivilEurasiaRussian Federation1993-11-011994-01-01Reconstruction and renovation of a 13 storey Government House
193ENKA250 Bed Maternity HospitalCivilEurasiaRussian Federation1991-09-011993-09-01Design and construction of a seven storey main and auxiliary buildings of a hospital. The project also includes the supply & erection of medical equipment package and electro-mechanical works
192ENKABrega New Town ProjectCivilAfricaLibya1986-05-011993-08-01Complete design and turn-key construction of 2,666 villas , 2 schools, 2 supermarkets, 2 clinics, 2 post offices, recreational facilities, 2 service shops, 2 cultural centers. The project also includes all infrastructure works, landscaping, electrical installations, telecommunication systems, utilities, town gas system and interior furnishing of all buildings. The Brega New Town Construction Project is a mega housing project of the Petroleum Ministry of Libya. The total contract value is 550 million USD. The contract is turn-key and comprises 2 housing projects covering 550,000 m² construction area consisting of 2,666 single or two-story villas of 19 different types, social buildings, including schools, supermarkets, slinics, post offices and other service units, cultural centers, soccer fields and tennis courts, roads, complete infrastructure, landscaping, telecommunication and interior furnishings of the buildings.
191ENKABrega New Town Project Sewage Treatment Plant and Relating jobsInfrastructureAfricaLibya1988-02-011993-08-01Turn-key construction of a sewage treatment plant including raw sewage pump station, connection pipes, roads, telecommunication and energy lines and collectors between the sewage treatment plant and community centers
190ENKABrega New Town Project District CenterCivilAfricaLibya1988-06-011993-08-01Design and turn-key construction of boys and girls preparatory school, mosque, bank, post office and activities center. The project also includes all infrastructure works, public and external works such as landscaping
189ENKABrega New Town Project Water Reservoirs and Piping WorksInfrastructureAfricaLibya1988-06-011993-08-01Construction of two reinforced concrete water reservoirs each with a capacity of 20.000 m³
188ENKABrega New Town Hospital ProjectCivilAfricaLibya1988-10-011993-08-01Construction of a three-storey hospital buiding for 105 beds a one-storey polyclinic building
187ENKAHarawa Housing ProjectCivilAfricaLibya1991-02-011993-07-01Turn-key construction of 221 one storey farm houses and 7 km long of asphalt road. Following the completion of the Great Man-made River project in Libya, a 30x40 km expanse of land was selected for a new agricultural settlement. In 1991, ENKA signed a frame contract for the turn-key construction of 150 villas and 600 farm houses, including social and technical buildings, water reservoirs, pipelines, roads and infrastructure, with a total construction area of 180,000 sqm. Under this comprehensive contract, the project's goal to turn arid desert into cultivatable land and a habitable settlement materialized in several stages between 1991 and 2001.
186ENKABrega New Town Project Coastal HighwayInfrastructureAfricaLibya1991-12-011993-07-01Construction of 13 km long, 2 x 3 lanes highway
185ENKA212 Bed Gynecological and Obstetrics ClinicCivilEurasiaRussian Federation1991-03-231993-03-01Design, reconstruction and restoration of a five storey building. The turn-key project also includes the supply and erection of medical equipment package and electro-mechanical works
184ENKASlonim Military Housing ProjectCivilEuropeBelarus1991-10-011992-12-01Design and turn-key construction of a residential complex with 1,455 dwelling units including social and technical buildings and the furnishing thereoff with the complete infrastructure. Beside others, the project also includes a 30 MW central heating plant, school, trade center, shopping center and social center with indoor swimming pool
183ENKAMOSENKA Office Building No: 1CivilEurasiaRussian Federation1992-07-011992-12-01Reconstruction and renovation of the existing 5 storey "Luxury Class" Office Building
182ENKABerke Dam Diversion Tunnel, Access Roads, Tunnels and BridgesInfrastructureEurasiaTurkey1990-09-011999-08-01Construction of the diversion tunnel of the Berke Dam on the Ceyhan river and the access roads, tunnels and bridges
181ENKAGMMR Benghazi End Reservoir, Phase 1InfrastructureAfricaLibya1988-07-011991-04-01Construction of the civil works and supply, delivery and installation of the associated electrical and mechanical equipment of a circular earthfill holding reservoir with a capacity of 4.7 million m³
180ENKABorisow Military Housing ProjectCivilEuropeBelarus1991-07-031991-12-31Design and turn-key construction of a residental complex with 725 dwelling units including social and technical buildings and the furnishing thereoff with the complete infrastructure. The project also includes a 30 MW central heating plant. The Borisow military housing project in Belarus was the pioneering settlement within the military housing program and as such demanded great speed of construction. Form green field to turn-key completion took just 173 days. The project has a total construction area of 85,000 sqm and includes social and technical buildings, infrastructure and a 30 MW heating center. Within the context of rapid developments following the unification of Germany, ENKA was determined to hanf over the project on the planned arrival date of the troops. ENKA's speed in completing the 725 apartments required intensive logistical arrangements backed up by the network of ENKA offices in İstanbul, Minsk, Moscow, Wiesbaden, Stockholm and London. As a result of this coordinated effort, a total of 1,510 trucks and 1,747 train wagons of equipment and materials were moved to the site. At the peak of activity, the number of workers and personnel reached 3,300. The inaguration ceremony on January 8, 1992, received extensive international media attention, marking the success of ENKA's contribution to a historic event.
179ENKAC.W.U. Office BuildingCivilEurasiaRussian Federation1991-09-011991-12-01Reconstruction and complementary civil works of an 8 storey office building and additional architectural finishing, mechanical and electrical works
178ENKA1000 Bed Hospital for the 2nd World War VeteransCivilEurasiaRussian Federation1989-03-011991-08-01Design, construction, supply and erection of engineering systems and medical equipment package of the 1,000 bed turn-key Hospital Project. The hospital consists of 5 buildings. The main building is 18 storey with each floor area of 5,000 m². All buildings have fully automated heating, ventilation, fire fighting (sprinkler), fire alarm, public address, security, medical gases systems. Some of the premises are equipped with steril ventilation and air conditionning system. Modern sophisticated medical equipment are also supplied, erected and put into operation.
177ENKAPetrovsky Passage Shopping CenterCivilEurasiaRussian Federation1988-12-011990-11-01Design, restoration, renovation, construction, supply and erection of engineering systems of a shopping center Project
176ENKAZara-Ghor Haditha HighwayInfrastructureAsiaJordan1986-11-011990-10-01Construction of 32 km. long highway between Zara and Haditha including 10 bridges and related structures
175ENKABekhme Dam - EPCInfrastructureAsiaIraq1986-09-011990-08-01Construction of civil works including supply and erection of the hydraulic steel structures for Bekhme Dam Project and turn-key housing complex comprising 350 villas 17 social facilities such as Guest House, Restaurant, Club House, Supermarket, Dispensary, Kinder Garten, School, Mosque, Bank, Post Office, Laundry and Offices. The Dam works consist of: A rockfill dam with a inclined impervious core, approx. 600 m. long at crest, height 204 m. fill volume 37 million m³. A spillway of 8.900 m³/s capacity, consisting of three tunnels of dia. 12 m. and 700 m. long with three radial gates. 2 bottom outlets of total capacity 750 m³/s, 1.200 m. long each. 2 diversion tunnels of dia. 12 m., 1,100 m. long each. 3 concrete lined tailrace tunnels of dia. 12. m. and approx 640-710 m. long. A conventional underground powerhouse having 6 units with a total capacity of 1.560 MW. An underground transformer hall and a switchyard hall. Due to the Gulf crises and war this project has been stopped indefinitely since August 1990. 32 % of work progress has been reached
174ENKAAhmetler DamInfrastructureEurasiaTurkey1987-09-011990-01-01Construction of all civil works including supply and erection of the hydraulic equipment for Ahmetler Dam. This dam has the storage capacity of 3 million cu.m. For the cooling and utilizing water of 3x210 MW Kemerköy Thermal Power Plant. The work calls; A rockfill dam (consisting of some different kinds of filter zones) with an impervious core approx. 220 m. long at crest, height 48m., fill volume approx. 1,650,000 cu.m. A spillway of approx. 162 cu.m/s capacity, consisting of a tunnel 6 m diameter and 268,6 m. long. A bottom outlet conduit with 2.5 m diameter and 126.5 m long.
173ENKA600 MW Trakya Natural Gas Combined Cycle Power Plant Extension IPower PlantEurasiaTurkey1986-11-011989-08-01In the Iate 70’s MTA, Mineral lnvestigation and Research Institute discovered natural gas resources in Trakya, north-west of Turkey. In early 80’s T.P.A.O., Turkish Petroleum Inc., determined reserves up to 15 billion m3 of natural gas in the same area and soon afterwards the State Planning Organization commenced feasibility studies regarding alternative usages of the exploited gas. The main alternatives were; to use natural gas as raw material in the existing and future fertilizer plants, to change Ambarlı Power Plant from fueloil fired to natural gas fired, etc. Finally it was decided to erect a combined cycle power plant to utilize the natural gas in the most favorable way and TEK, Turkish Electricity Authority called for an international turn-key tender. Depending on the new natural gas source-Gas Pipeline between U.S.S.R. and Turkey- decision for the 100 % Extension of the plant was given and construction works were started on Dec., 1986. Trakya Natural Gas Combined Cycle Power Plant is the first of its type in Turkey and will produce 7,2 billion kWh electricity per year when all units will be under operation. Plant is consist of 8 gas and 4 steam turbine each having an output of 100 MW and equipped with 2 Heller System Natural Draft Dry Cooling Tower each 135 m high. The Plant has a high thermal efficiency (≈51 %) and specific installation cost (cost/kW) is much lower than the comparable conventional steam power plants.
172ENKASirte Bay Hotel and Conference CenterCivilAfricaLibya1989-01-011989-07-01Turn-key construction of 4 hotel buildings each 4 stories with a total floor area of 32,164 m². Single storey Reception Hall for 400 persons with a floor area of 2,697 m². A tent to be used as a Conference Hall with a floor area of 3,500 m². 43 Bungalows comprising administrative office, Restaurant, cafeteria, sports center with a floor area of 4,750 m². The entire Project has been fully furnished and equipped. This magnificient convention center and tourism complex on the Nortg African Riviera, designed to host conferences and guests of top offical levels, has been completed with incredible speed in an extraordinarily short period of 6 months. The contract was on turn-key basis with a cost of 84 million USD, complete with infrastructure constructions, landscaping, and fully furnished and equipped facilities.
171ENKASekköy Dam Water Line for Yeniköy Thermal Power PlantInfrastructureEurasiaTurkey1986-07-011989-06-01Additional water circulation supply necessary for the agriculture and Yeniköy Thermal Power Plant's process. Extension to the Cooling Water System 2 x 250 lt/s
170ENKAGemlik Ammonia Plant Extension ProjectOil & Gas, PetrochemicalsEurasiaTurkey1986-04-011989-02-01Extension works of an ammonia plant
169ENKAENKA, Sadi Gülçelik Sports Complex, İstinyeCivilEurasiaTurkey1985-01-011988-12-01Preliminary and final design, and turn-key construction of the following sports and recreational facilities to serve approx. 2,500 people on a total lot of 130,000 sq.m. including all the infrastructure and landscaping works: 2 sports halls, bath hall with a 21 x 25 m. swimming pool, 3 tennis hall, bowling hall, chess room, olympic swimming pool 21 x 50 m., 9 tennis courts, 2 volleyball fields, handball field, playgrounds, track field, administration building, club and restaurant building, camp building
168ENKAAlpet Plant Acetic Acid Tank of PTA FactoryOil & Gas, PetrochemicalsEurasiaTurkey1988-03-011988-12-01Construction and erection of a stainless steel tank with a capacity of 1,000 m³
167ENKAUSSR - Turkey Natural Gas Pipeline ProjectOil & Gas, PetrochemicalsEurasiaTurkey1986-09-011988-09-01ENKA and its partner Spie-Capag (France) entered into a contract with BOTAŞ for the construction of the Russian natural gas pipeline in September 1986. The 842 km, 36-24 inch natural gas pipeline extends from the Bulgarian border of Turkey to Ankara, including a total of 118 km of offshore pipeline between Ambarli-Pendik and Dil Iskelesi-Hersek in the Marmara Sea at a maximum depth of 90m. Other principal works in the contract included a 20 MW compressor station, 11 reducing and metering stations, 9 pig stations, 32 line valves, a dispatching center, 3 maintenance center, and telecommunication and telecontrol systems. The pipeline has an annual capacity to deliver 14bcm of natural gas, under 70 barg pressure, into Turkey through the Ukraine. This is equivalent to 75% of Turkey's current consumption. The project was financed though a number of export credit agencies, such as US Exim, JEXIM, Coface and ECGD.
166ENKAIstanbul Sewerage Project (1st Stage) Mechanical and Electrical Works for Yenikapı Pre-treatment Plant & Pumping StationsInfrastructureEurasiaTurkey1984-09-011988-08-01Supply and installation of all electrical and mechanical parts of a sewage pretreatment plant and 2 pumping stations
165ENKAIstanbul Sewerage Project (1st Stage) Civil Works for Yenikapı Pretreatment Plant & Pumping StationsInfrastructureEurasiaTurkey1985-06-011988-06-01Architectural, civil, structural, HVAC, plumbing, electrical and infrastructures design and construction of a course screen house, a pumping station (influent), pretreatment plant, a pumping station (effluent), incoming interceptor, sewers and force mains fabrication and laying of overflow systems and connecting pipes construction of roads and fire fighting system related with a pretreatment plant and 2 pumping stations
164ENKAAl Jubail - Riyadh, Line C, RWC (Reservoirs)InfrastructureAsiaSaudi Arabia1984-02-011988-04-01Construction of 6 reservoirs, each with a capacity of 50,000 m³ including valve chambers
163ENKAWater Supply Treatment System for Al Rass, Contract 1InfrastructureAsiaSaudi Arabia1985-04-011988-03-01Architectural, infrastructure design and turn-key construction of water treatment plant
162ENKAAl Medinah HousingCivilAsiaSaudi Arabia1982-04-011988-02-01Complete design and turn-key construction of 2,084 villas, related infrastructural works such as roads, sewerage system, potable water and rain water system, land reclamation, irrigation and landscaping. All electrical installation, telephone and tv systems are included in the contract, as well as interior furnishing of the villas. A housing project of 2084 villa-type housing units at Medinah Munawwara in Saudi Arabia in line with the Public Housing Programme of the Ministry of Public Works and Housing, will extend the holy city Medinah Munawwara in the south-east direction. Construction work comprises the execution and completion of the houses, sanitary, electrical, telephone and finishing works together with the external works including roads, playgrounds, gardens, open passages and plantations. The design of the houses which was included in the bidding requirements is made by ENKA and KUTLUTAŞ who will build the entire sub and superstructure of the project. A new additional town with 2,084 villas was built in Saudi Arabia near Medinah, occupying 540 acres of land, as a complete turn-key project with roads, over and under passes, drinking water, drainage and sewage systems, land reclamation, all electric installations, TV and telephone systems, interior furnishing, irrigation, and landscaping.
161ENKAÇobançeşme JunctionInfrastructureEurasiaTurkey1985-06-011987-12-01Construction of 2 bridges, each 2 x 15 m. in length, and 2 underpasses
160ENKAGirne Touristic PortCivilEurasiaTurkey1983-04-011987-10-01Design and construction of a main break-water and a secondary breakwater, 920 m. and 210 m. long respectively, a 779 m. long quay wall with 2 piers, 40 m. in length and administration building, passenger terminal, customs house and light houses. Contract also includes illumination works, electrical installations, telecommunication system, water supply system, fencing works, and fortification works of the shore
159ENKASamsun Fertilizer Plant, Sulphuric Acid Rehabilition ProjectCivilEurasiaTurkey1984-03-011987-09-01Steel structure fabrication and erection works, 2,406 tons of machinery and equipment erection, piping works related with the rehabilitation of sulphuric acid unit of Samsun Fertilizer Plant
158ENKA600 MW Trakya Natural Gas Combined Cycle Power PlantPower PlantEurasiaTurkey1984-12-011987-09-01In the Iate 70’s MTA, Mineral lnvestigation and Research Institute discovered natural gas resources in Trakya, north-west of Turkey. In early 80’s T.P.A.O., Turkish Petroleum Inc., determined reserves up to 15 billion m3 of natural gas in the same area and soon afterwards the State Planning Organization commenced feasibility studies regarding alternative usages of the exploited gas. The main alternatives were; to use natural gas as raw material in the existing and future fertilizer plants, to change Ambarlı Power Plant from fueloil fired to natural gas fired, etc. Finally it was decided to erect a combined cycle power plant to utilize the natural gas in the most favorable way and TEK, Turkish Electricity Authority called for an international turn-key tender.
157ENKAProcessing Units of Middle Anatolian RefineryOil & Gas, PetrochemicalsEurasiaTurkey1980-08-011987-08-01Construction and erection of processing units of a refinery with a processing capacity of 5,000,000 tons/year of crude oil
156ENKAAkgübre Sulphuric Acid Unit Rehabilitation and Phosphoric Acid Tanks ConstructionOil & Gas, PetrochemicalsEurasiaTurkey1985-11-011987-08-01Project design and steel structure fabrication and erection works and instrumentation works, insulation related with the rehabilitation of sulphuric acid unit. Construction of 2 steel tanks with related piping, electrical, instrumentation, insulation and all civil works of the phosphoric acid unit
155ENKA2 x 210 MW Yeniköy Themal Power Plant Units 1 and 2Power PlantEurasiaTurkey1981-05-011987-07-01Complete architectural and structural design, and construction of all civil, building works, steel structure fabrication and erection works related with all buildings, facilities and infrastructure of a 2 x 210 MW thermal power plant. Construction works, steel structure fabrication and erection works for 2x210 MW units of coal fired power plant. The construction works include mainly Boiler, Turbine and Bunker Buildings, coal supply system, water supply and treatment system, 380 kV and 154 kV switchyard, ash and slag handling system and other auxiliary and service buildings. The stack within ash and slag handling system is 200 m high and was constructed by sliding forms.
154ENKABaghdad Cigarette Factory - EPCCivilAsiaIraq1984-07-011987-07-01Architectural detailed design and all civil and building works, HVAC and other common utilities for a cigarette factory. Total floor area of the adminis-tration building, restaurant and the conference hall is 3,000 m²
153ENKAConstruction of the Al Rass Water Supply and Treatment Systems Contract No. 2BInfrastructureAsiaSaudi Arabia1985-11-011987-07-01Pipelaying for transmission main and distribution network
152ENKAKahramanmaraş Sewage System Network, Collectors and Drinking Water Network SystemInfrastructureEurasiaTurkey1985-05-011987-05-01Turn-key construction of the sewage system network and collectors of the city of Kahramanmaraş including manufacturing of pipes with dia. Between Ø 100 - 1.200 mm. Contract also includes drinking water network of 200 km consisting of Ø 100-800 mm. Dia pipes.
151ENKAExtension of Riyadh Distribution System, Aditional Main LinesInfrastructureAsiaSaudi Arabia1984-12-011986-12-01Trench excavation and pipelaying
150ENKAFerjijel Steel Railway BridgesInfrastructureAfricaAlgeria1985-06-011986-11-01Manufacturing and erection of 9 steel railway bridges between Jijel Port and Djamel City of Algeria
149ENKABridges 082/C24 - C36 - C87InfrastructureAsiaSaudi Arabia1983-04-011986-10-01Construction of 4 post tensioned bridges and 4 box culverts in Jubail Industrial City
148ENKAAlaybey Shipyard Extension Project (1st Phase)CivilEurasiaTurkey1983-05-011986-09-01Design and construction of: 2 crane runways supported by driven r.c. piles (dia. 480 mm.) 185 m. and 165 m. long. 3 slipways 167 m. and 184 m. long. Transfer area 127 m. in length and 80 m. in width, supported by in-situ r.c. and steel piles. 2 wharves 36 m. and 125 m. long. 2 synchrolift jetties ea. 148 m. length. Related earthworks, filing and dredging works
147ENKAWater Lines in Fanateer, Defii and Mutrafiah, Contract No. 570-C11InfrastructureAsiaSaudi Arabia1985-02-011986-09-01Extension of potable water and irrigation water transmission pipelines and construction of valve chambers
146ENKALibya Bombah Military Airbase, 40 Aircraft SheltersCivilAfricaLibya1984-01-011986-08-01Construction of 40 aircraft shelters and aprons with runways
145ENKAErection of Coal Blending Plant EquipmentCivilEurasiaTurkey1985-11-011986-08-01Erection of stacker reclaimers. Coal crusher, feeder, tripper and weighing bridge. Conveyors steel structure
144ENKACalcium Hypochlorite Factory BuildingCivilAsiaIran1986-01-011986-07-01
143ENKADiyarbakır Province Drinking Water Supply SystemInfrastructureEurasiaTurkey1982-05-011986-05-01Construction of the water supply system of Diyarbakır Province consisting of 67 km pipeline
142ENKADiyarbakır Province Sewage SystemInfrastructureEurasiaTurkey1982-04-011986-04-01Construction of the sewage system network in Diyarbakır Province about 100 km. of pipelaying
141ENKAAmman Service Reservoirs - Contract 2InfrastructureAsiaJordan1983-10-011986-04-01Construction of 5 ground level water reservoirs with a total capacity of 63,000 m³, 3 water towers, an instrument house and 3 pumping stations
140ENKAAmman Service Reservoirs - Contract 3InfrastructureAsiaJordan1983-10-011986-04-01Construction of 6 ground level water reservoirs with a total capacity of 97,800 m³, 2 instrument houses and a pumping station
139ENKAWater Supply Project for Sudair Region, Water Distribution System Phase 1 Contract CInfrastructureAsiaSaudi Arabia1984-07-011986-04-01Architectural, civil, structural, infrastructure design including HVAC, plumping, electrical design and construction of booster stations, reservoirs and distribution networks
138ENKAWater Supply Project for Nifi and Surrounding Villages, Contract A-2InfrastructureAsiaSaudi Arabia1984-10-011986-04-01Water distribution piping
137ENKAWater Works Improvements Jeddah, 4 Reservoirs and Associated WorksInfrastructureAsiaSaudi Arabia1985-05-011986-04-01Complete design and construction of 4 water reservoirs each with a capacity of 50.000 m³, distribution chambers, pipe installation and inlet/outlet structures
136ENKAMakkah-Taif Water Transmission System, Reservoirs, MakkahInfrastructureAsiaSaudi Arabia1983-08-011986-03-01Construction of 8 water reservoirs including valve chambers. 4 reservoirs have a capacity of 50,000 m³, each and the others 4 have a capacity of 25,000 m³
135ENKANahrawan Industrial Estate Water Supply Scheme - EPCCivilAsiaIraq1984-08-011986-03-01Complete design and construction of a water treatment plant and one pumping station
134ENKAAl Khafji Phase 2 Desalination PlantInfrastructureAsiaSaudi Arabia1982-10-011986-02-01Civil works of the plant Construction of sea-water intake, outfall and treatment facilities. Construction of product water pipeline and facilities for fuel-oil supply, storage and handling. Construction of control buildings, laboratory, maintenance shop, warehouse, office buildings, housing compound. HVAC and fire protection system related to a single purpose MSF type desalination plant to produce 5 million gallons of desalted water per day
133ENKAExtension of Riyadh Distribution System Secondary Distribution Systems Stage 1 Part 3InfrastructureAsiaSaudi Arabia1984-03-011986-02-01Execution of pipe installation
132ENKAHabur Bridge Iraqi-Turkish Border - EPCInfrastructureAsiaIraq1984-06-011986-01-01Design and construction of a bridge 315m in length having 9 equal spans of 35m
131ENKAFirst Extension of Tasluja Cement Plant - EPCCivilAsiaIraq1981-05-011985-10-01All civil and building works related with 100 percent extension of Tasluja Cement Plant
130ENKA500 Villas in Al AhsaCivilAsiaSaudi Arabia1981-10-011985-10-01Complete final design and turn-key construction of 500 low cost houses
129ENKASmoke Stacks of Middle Anatolian RefineryOil & Gas, PetrochemicalsEurasiaTurkey1983-05-011985-10-01Construction of 3 smoke stacks with heights of 129.80 m., 115.60 m. and 121.30 m
128ENKAExtension of Riyadh Distribution System Secondary Distribution Systems Stage 1 Part 2InfrastructureAsiaSaudi Arabia1983-11-011985-10-01Execution of pipe installation for the secondary distribution systems of Riyadh Distribution System
127ENKAFirst Extension of Kerbela Cement Plant - EPCCivilAsiaIraq1981-09-011985-08-01All civil and building works related with 100 percent extension of Kerbela Cement Plant
126ENKACooling Water System of Yeniköy Thermal Power PlantPower PlantEurasiaTurkey1983-10-011985-08-01Construction and erection works of cooling and feeding water system for the boilers of Yeniköy Thermal Power Plant
125ENKATasluja Cement Plant - EPCCivilAsiaIraq1981-03-011985-07-01All civil and building works related with a cement plant of 1,000,000 tons/ year capacity
124ENKAEuropean Highway, Sağmalcılar Section StructuresInfrastructureEurasiaTurkey1981-11-011985-07-01Design, and construction of viaducts
123ENKA3 x 210 MW Kemerköy Thermal Power Plant Units 1-2-3, KemerköyPower PlantEurasiaTurkey1984-09-011985-06-01Complete architectural and structural design, and all civil, building, steel structure fabrication and erection works related with all buildings, facilities and infrastructure of a 3 x 210 MW thermal power plant. Nominated Subcontractor to Electrim/Poland
122ENKA1 x 210 MW Yatağan Thermal Power Plant Unit 3Power PlantEurasiaTurkey1980-10-011985-06-01Construction works, steel structure fabrication and erection works for 3x210 MW units of coal fired power plant. The construction works include mainly Boiler, Turbine and Bunker Buildings, coal supply system, water supply and treatment system, 380 kV and 154 kV switchyard, ash and slag handling system and other auxiliary and service buildings . The stacks within ash and slag handling system are 120 m high and were constructed by sliding forms.
121ENKARas Lanuf New Town Project Contract No: 11CivilAfricaLibya1981-02-011985-05-01Complete final design and turn-key construction of 1,129 villa type housing units. All infrastructure works related with the new town: roads, underpasses, sewage collection system, rain water systems, water supply network, irrigation, electricity and natural gas supply and distribution, telecommunication systems and landscaping
120ENKARas Lanuf New Town Project Contract No: 12CivilAfricaLibya1981-07-011985-05-01Design and turn-key construction of five motels with a total floor area of 16,500 m², five 3-storey apartment houses with a total floor area of 32,000 m², a primary school, a kindergarten, a supermarket with a total floor of 11,500 m² and 2 water tanks, each with a capacity of 20,000 m³, sewage treatment plant, water supply system, electrical and mechanical installations
119ENKASAMA Branch Office BuildingsCivilAsiaSaudi Arabia1984-07-011985-05-01Construction of 4 branch office buildings with 4 storeys and related infrastructure works of SAMA at 4 different locations
118ENKANew Battaliyah Water Stormwater FacilitiesInfrastructureAsiaSaudi Arabia1984-07-011985-05-01Construction of one 38.5 m. high and 1,890 m³ capacity water tank, one pump station, Water pipeline
117ENKAKerbela Cement Plant - EPCCivilAsiaIraq1981-05-011985-03-01All civil and building works related with a cement plant of 1,000,000 tons/ year capacity
116ENKAKing Saud University Main MosqueCivilAsiaSaudi Arabia1984-02-011984-12-01Construction of the main mosque of the King Saud University
115ENKARas Tanura Bridges, Project KSA-1InfrastructureAsiaSaudi Arabia1984-03-011984-12-01Construction of 4 steel bridges and 2 prestressed bridges with 37 m. and 17 m. spanlengths, respectively
114ENKAIraq-Turkey Crude Oil Pipeline Expansion Project (Turkish Part)Oil & Gas, PetrochemicalsEurasiaTurkey1983-03-011984-10-01ENKA and its partner Toyo Engineering (Japan) undertook the turn-key contract with BOTAŞ, the Turkish state-owned company for pipeline transportation, and completed the construction in October 1984. The project was designed to increase the capacity of the existing 40-inch. 1,000 km crude oil pipeline from 35 to 50 million ton/year. The design and construction works were carried out simultaneously in Turkey and Iraq. The major work items were the replacement of pumps at existing pump stations, construction of three new pump stations, installation of booster pumps, construction of an 80 km pipeline loop with diameters of 30 and 40 inches, modification of the dispatching center, extension of the existing metering station and the installation of a fourth metering station, two new pump stations complete with HV and MV substations, and fire-fighting, telecontrol and telecommunication, instrumentation, station piping, and cathodic protection systems.
113ENKACrude Oil Export ProjectOil & Gas, PetrochemicalsAsiaIraq1983-03-011984-10-01Design and construction of expansion project to increase the capacity of existing 40", 1,000 km crude oil line from 35 million tons/year to 50 million tons/year. Replacement of pumps and motors at existing stations. Modification of dispatching center. Extension of the metering stations and addition of the 4th metering st. Construction of two new pump stations complete with high voltage substation, MV substation, fire fighting/fire alarm system, telecontrol / telecommunication and instrumentation system, 4 x 3.6 MV, 11 KV pump/motor sets, station piping and cathodic protection systems. Tie-in of new stations to existing pipeline
112ENKASCC Mining RoadsInfrastructureAsiaJordan1983-05-011984-08-01Turn-key construction of a double lane road 3,200 m. in length with asphalt pavement, and a quarry access road of 6,000 m. in length
111ENKARiyadh - Dammam Expressway BridgesInfrastructureAsiaSaudi Arabia1983-08-011984-08-01Construction of 2 posttensioned bridges on the 4th stage of Riyadh - Dammam Expressway
110ENKAPendik Shipyard BreakwaterInfrastructureEurasiaTurkey1981-07-011984-07-01Construction of a 680 long breakwater with an average depth of 18 m
109ENKAAromatics Plant of Petkim Aliağa Petrochemical ComplexOil & Gas, PetrochemicalsEurasiaTurkey1980-08-011984-06-01Detailed designs for civil and mechanical works and construction and erection of an aromatics plant with a total capacity of 320,000 tons of benzene, paraxylene, orthoxylene. Heavy steel structure construction of the plant
108ENKARashadiya Cement PlantCivilAsiaJordan1981-11-011984-06-01Construction of a complete cement plant with a capacity of 2,000,000 tons/year
107ENKAJubail Expressway Bridges, TS 7 - 3 Lanes - 082-C26InfrastructureAsiaSaudi Arabia1982-01-011984-04-01Construction of 2 prestressed express-way bridges with three and four spans
106ENKAPendik Shipyard Diesel Engine Factory FoundationsCivilEurasiaTurkey1983-10-011984-04-01Foundations and infrastructure works of a diesel engine factory
105ENKASaudi Cable Factory Extension ProjectCivilAsiaSaudi Arabia1983-05-011984-03-01Construction of plant support facilites, medium voltage transformer building and loading bay works
104ENKABazian Quarry Road - EPCInfrastructureAsiaIraq1983-10-011984-01-01Construction of 4.7 km. macadam road and parking lot for the Al Ta'mim Cement Plant quarry
103ENKATasluja Water Pipeline and Pumping Station - EPCCInfrastructureAsiaIraq1982-03-011983-12-01Complete design and turn-key construction of 23 km. drinking water pipeline and a pumping station for transmission of 400 m³/h of water
102ENKAKozyatağı Housing ProjectCivilEurasiaTurkey1982-07-011983-12-01Construction of on 7-storey and one 9-storey apartment houses, a total of 64 apartments
101ENKAKerbela Water Pipeline and Pumping Station - EPCCInfrastructureAsiaIraq1982-05-011983-11-01Complete design and turn-key construction of 70 km. drinking water pipeline and a pumping station for transmission of 400 m³/h of water
100ENKAConcrete Sleepers - 065-C10, CC0-03 (204 C12)InfrastructureAsiaSaudi Arabia1982-08-011983-09-01Construction of concrete sleepers for handling piping material
99ENKAAnatolian Highway, Gebze - Hereke Section Prestressed StructuresInfrastructureEurasiaTurkey1977-10-011983-08-01Detailed design and construction of 10 prestressed concrete viaducts
98ENKASeawater Cooling Supply / Return Canal No. 1 West Section, 065-C10InfrastructureAsiaSaudi Arabia1980-10-011983-08-01Turn-key construction of a reinforced concrete seawater intake and outfall canal, 1,700 m. in length, 118 m. in width and 9 bridges, 2 offtake structures, dividing walls, 1,600 mm. dia. prestressed pipes with a total length of 1,675 m
97ENKARiyadh Water Transmission System, Pump Stations 5 and 6InfrastructureAsiaSaudi Arabia1981-03-011983-07-01Architectural, civil and structural design, and construction of 2 pump stations for pumping 830,000 m³/day, related service buildings and living facilities
96ENKA2 x 210 MW Yatağan Thermal Power Plant Units 1 and 2, YatağanPower PlantEurasiaTurkey1977-04-011983-06-01Construction works, steel structure fabrication and erection works for 3x210 MW units of coal fired power plant. The construction works include mainly Boiler, Turbine and Bunker Buildings, coal supply system, water supply and treatment system, 380 kV and 154 kV switchyard, ash and slag handling system and other auxiliary and service buildings . The stacks within ash and slag handling system are 120 m high and were constructed by sliding forms.
95ENKABreakwater Construction on the Coast of Marmara SeaInfrastructureEurasiaTurkey1980-07-011983-04-01Construction of a 310 m. long breakwater with an average depth of 25 m
94ENKAStorage Tanks of Middle Anatolian RefineryOil & Gas, PetrochemicalsEurasiaTurkey1979-07-011983-03-01Construction and erection of 82 cylindrical tanks for the storage of crude oil and oil products
93ENKABadoosh Cement Plant - EPCCivilAsiaIraq1980-10-011983-03-01Design, engineering, fabrication and erection of the steel structure works of homogenisation buildings of a cement plant with a 3,000 tons daily capacity
92ENKAENKA-SIP, PVC Pipes FactoryCivilAsiaSaudi Arabia1982-07-011983-03-01Factory building for producing PVC pipes
91ENKAENKA Gayrettepe Office BuildingsCivilEurasiaTurkey1980-04-011983-01-01Construction of a 15-storey office building
90ENKAENKA Business Premises (3. building)CivilEurasiaTurkey1982-01-011983-01-01Construction of 8-storey office building and landscaping
89ENKARiyadh Additional Water Supply Contract No. 3 Treatment WorksInfrastructureAsiaSaudi Arabia1979-10-011982-05-01Architectural, civil and structural design, and construction and erection of a water treatment plant of 200,000 m³ per day capacity. Laying of 3,000 tons of ductile iron pipes. Civil and building works for coolers, softners, filters, sludge disposal plant, chemical handling buildings, pumphouses, administration buildings, workshops and stores. All mechanical and electrical installation works of the above mentioned units including insulation and painting
88ENKARiyadh Water Treatment and Distribution System New Areas, Part 5, Al Badiah ContractInfrastructureAsiaSaudi Arabia1980-09-011982-05-01Installation of a complete water distribution network including branch lines and 6.100 house connections. Execution of valve chambers and asphalt works
87ENKAArab Potash Refinery Screening and Compaction PlantOil & Gas, PetrochemicalsAsiaJordan1981-04-011982-04-01Construction of the screening and compaction plant of the potassium refinery and related infrastruc-ture works
86ENKAArab Potash Potassium RefineryOil & Gas, PetrochemicalsAsiaJordan1980-01-011982-03-01All civil works, building works, and design, fabrication and erection of steel structure works related with all processing units and administration buildings of a potassium refinery to produce 1,200,000 tons/year of potassium
85ENKATarhuna - Quasbat RoadInfrastructureAfricaLibya1978-01-011981-11-01Construction of a 46 km. long, 15 m. wide highway and related structures
84ENKALassy Computer CenterCivilAfricaLibya1980-03-011981-06-01All civil works related with a computer center
83ENKASouth Jordan Electrical SubstationsInfrastructureAsiaJordan1980-05-011981-06-01Construction and extension works of 8 substations in various places in Jordan
82ENKATPAO Aliağa Refinery New Storage TanksOil & Gas, PetrochemicalsEurasiaTurkey1979-03-011981-02-01Fabrication, erection, piping and insulation of varıous tanks
81ENKAENKA Business Premises (2. Building)CivilEurasiaTurkey1979-01-011981-01-01Construction of 8-storey office building and landscaping
80ENKAAnatolian Highway, Dilderesi and Hereke TunnelsInfrastructureEurasiaTurkey1976-10-011980-12-01Construction of two tunnels, one with a total length of 580 m and a cross-section of 150 m² and another with a total length of 440 m. and cross-section of 90 m²
79ENKAAnatolian Highway, Hereke - İzmit Section Prestressed StructuresInfrastructureEurasiaTurkey1974-12-011980-10-01Construction of 5 prestressed viaducts with a total length of 1.996 m. (2 x 998 m.) and width of 12.80 m., total of 52 spans varying between 12.50 m. and 42 m., 62 piers between 8.02 m. and 39 m. with a deck area of 25,429 sq.m. 7 prestressed underpasses. 3 overpasses
78ENKAMiddle Anatolian Refinery Housing Compound Part 2CivilEurasiaTurkey1977-08-011980-10-01Construction of residential buildings, social facilities and infrastructure works consisting of 14 apartment buildings, 12 villas, a primary school, sports facilities, central heating system, water treatment plant and pump station, water tank, water supply system, sewage treatment plant, roads, high voltage transmission lines, transformer stations, low voltage system and telecommunications
77ENKAMiddle Anatolian Refinery Various StructruesInfrastructureEurasiaTurkey1978-04-011980-10-01Construction of an administration building, three access bridges and two water reservoirs with a capacity of 35,000 m³ each
76ENKAÇekmece Nuclear Research ReactorPower PlantEurasiaTurkey1979-08-011980-02-01All civil construction and electromechanical erection works of TR1 Research Reactor (extension) and TR2 Research Reactor
75ENKAKüçükçekmece BridgeInfrastructureEurasiaTurkey1978-04-011979-12-01Construction of a prestressed bridge with a length of 132 m. and width of 12.80 m. having 3 spans with a max. spanlength of 43 m
74ENKARiyadh Limestone Brick FactoryCivilAsiaSaudi Arabia1978-01-011979-11-01Civil works of a Lime stone brick factory and its related facilities
73ENKAElazığ - Uluova Irrigation ProjectInfrastructureEurasiaTurkey1977-05-011979-10-01Construction of irrigation network, pumping station and related facilities
72ENKAJeddah Limestone Brick FactoryCivilAsiaSaudi Arabia1978-01-011979-09-01Civil works of a Lime stone brick factory and its related facilities
71ENKAShatt Al Arab Bridge - EPCInfrastructureAsiaIraq1975-03-011979-08-01Construction of a 761 m. long prestressed concrete bridge
70ENKAYamama Cement Factory Extension (Phase 2)CivilAsiaSaudi Arabia1976-01-011979-07-01Civil works of a cement plant of 1,000,000 tons/year capacity
69ENKAAl Khoms Cement PlantCivilAfricaLibya1977-03-011979-03-01All civil and building works of a cement plant with a capacity of 1,000,000 tons/year
68ENKAİzmit Open TunnelInfrastructureEurasiaTurkey1974-12-011978-12-01Construction of a tunnel with a width of 13 m., height of 5.50 m. and length of 660 m
67ENKAKızılırmak BridgeInfrastructureEurasiaTurkey1977-08-011978-11-01Construction of 2 double lane prestressed bridges across Kızılırmak River with a max. spanlength of 17.25 m. and a total length of 125 m
66ENKA150 MW Tunçbilek II Thermal Power PlantPower PlantEurasiaTurkey1973-03-011978-08-01Civil, building works, steel structure fabrication and erection works of a 150 MW thermal power plant
65ENKAİGSAŞ Accommodation Houses, 2nd PartCivilEurasiaTurkey1977-03-011978-08-01Construction of three 13-storey apartment houses, 4 triplex villas and recreational facilities
64ENKAMiddle Anatolian Refinery Housing Compound Part 1CivilEurasiaTurkey1977-04-011978-07-01Construction of a social building including a cinema hall, a kitchen, refrigeration unit, supermarket, restaurant, infirmary and recreational facilities, and accommodation facilities
63ENKAYeşilköy Airport New Terminal BuildingCivilEurasiaTurkey1975-07-011978-06-01Civil works, steel structure fabrication and erection works of an airport terminal and its control tower
62ENKAContinuous Slab Casting Unit of Ereğli Iron and Steel WorksCivilEurasiaTurkey1976-03-011978-05-01Civil works, steel structure fabrication and erection works, installation and adjustment of slab casting machines and related equipment, erection of 7 sliding cranes, electrical installations, instrument works and telecommunication system of the Continuous Slab Casting Unit
61ENKAPetkim Yarımca Complex New Tank FarmOil & Gas, PetrochemicalsEurasiaTurkey1976-09-011978-01-01Fabrication, erection, piping and insulation of different type of tanks
60ENKAHawari Cement PlantCivilAfricaLibya1975-10-011977-11-01All civil and building works of a cement plant with a capacity of 1,000,000 tons/year
59ENKAMakkah Water PipelineInfrastructureAsiaSaudi Arabia1977-07-011977-11-01Supply and laying of 46 km of diameter 400 mm ductile iron pipes
58ENKASouk Al Khamis Cement PlantCivilAfricaLibya1974-08-011977-05-01All civil and building works of a cement plant with a capacity of 1,000,000 tons/year
57ENKAConcrete Hollow Brick FactoryCivilAfricaLibya1977-01-011977-05-01All civil works of a concrete hollow brick factory
56ENKAİskenderun Iron and Steel Factories, Rolling Mill Erection and Electromechanical Manufacturing and Erection WorksCivilEurasiaTurkey1974-01-011976-06-01Erection of rolling mill units of 364 tons, erection and adjustment of 1,450 KVA thyristore controlled electrical motors, manufacturing and erection of structural steel works and of various equipment
55ENKASecond Extension of Benghazi Cement PlantCivilAfricaLibya1974-10-011976-06-01All civil works of a cement plant extension project with a capacity of 600,000 tons/year
54ENKASiemens Cable Factory's ExtensionCivilEurasiaTurkey1974-07-011975-06-01By extension contract, the construction of the additional plant in the same architectural design, installation works, roads, canals and site levelling works were undertaken.
53ENKAİskenderun Iron and Steel Factories, Raw Materials Preparation FacilitiesCivilEurasiaTurkey1972-01-011975-05-01Turn-key construction of raw materials preparation facilities group of the Iron and Steel Factory with one million tons/year capacity. Raw materials such as iron ore, coke, dolomite which are transported by sea or by railway, are carried from unloading area which has a depth of 7.36 m below sea level, to raw materials is storage area at first, then to crushing and screening plant and afterwards to mixing plant by conveyor system. From the mixing plant the raw material is transported to steel bunkers in stock area. At the time of production mixed raw material is conveyed to sintering buildings. This system composes the Raw Material Preparation Facilities. Raw Materials Preparation Facilities consist of 74 units, among them 11 main units, 44 platforms (gantry), 14 junction towers and other auxiliary units which spread over an area of 1 km². Generally these units are founded on bored piles and have reinforced substructures and steel structure superstructures. Construction includes underwater excavation and erection, fabrication and erection of 83 steel bunkers, 4 steel stacks, aspirator collectors rails etc. and concrete bunkers. Raw Materials Preparation Facilities have 29 substations including transformers and energy transmission lines, fuel-oil pipelines plant, pneumatic conveyor system, drainage and sewage systems and technological piping works
52ENKAİskenderun Iron and Steel Factories, Steel Rolling Mill PlantCivilEurasiaTurkey1974-07-011975-04-01Construction of a steel rolling mill plant of 1,000,000 tons/year capacity consisting of stock area of annealing furnaces, lathe and repair workshops, machine hall and electrical control units
51ENKASifaş Synthetic Tread Factory ExtensionCivilEurasiaTurkey1973-08-011974-12-01Expansion works of synthetic thread factory including construction of workshop, 6 types of blocks, generator building and plant cooling system.
50ENKAOnduline Corrugated Roof Covering Materials FactoryCivilEurasiaTurkey1973-09-011974-12-01Construction and installation works of the corrugated roof covering materials factory with a capacity of 3,000,000 m². The plant has a covered area of 10,000 m² spreaded over an area of 50,000 m². Contract includes landscaping of the plant area, as well
49ENKAİskenderun Iron and Steel Factories, Coke Furnaces PlantsCivilEurasiaTurkey1970-09-011974-10-01Turn-key construction of coke furnaces plants group of the Iron and Steel Factory with one million tons/year capacity. Block coal is carried by conveyor system from the crushing and screening plant to the 50 m. high coke tower and from there to coke batteries which consist of 138 furnaces. Coke is conveyed from furnaces to bunkers passing through slaking units. The Coke Furnace group has 38 units which rest on a foundation of bored piles amounting to 19,000 m. in length totally. Some of these units are completely r.c. structures, some of them have steel structure superstructures. Among the r.c. units there are 50 m. high coke tower and 18 m. high bunkers. Steel conveyor bridges, 42 m. above the ground with a main span of 46 m. are among significant steel structure works. Coke batteries are another important construction unit including erection of 12,720 pipes with a level precision of 1 mm and coordinate precision of ± 5 mm, smoke ducts and B. 300 concrete which stands up to a temperature of 700 ºC. In addition to these, there is installation of 3,316 m. long underground concrete and steel pipes of various diameters and various pressure up to 40 atu of operating pressure and above ground pipes 8,800 m. in length and electrical conduit pipes 600 m. in length
48ENKABenghazi Limestone FactoryCivilAfricaLibya1973-07-011974-06-01Construction of the limestone factory and its related facilities
47ENKAIstanbul Peripheral Highways, Construction of the 4th Section BridgesInfrastructureEurasiaTurkey1970-09-011974-05-01Construction of 8 prestressed overpasses between "Bosphorus" Bridge and "Mecidiyeköy" Viaduct of Istanbul Peripheral Highways. These overpasses were constructed in different types and some of them have cast-in-place continuous prestressed slabs. Generally B 450 quality concrete was used
46ENKABenghazi Gas Turbine Power PlantPower PlantAfricaLibya1973-07-011974-05-01Construction of a gas turbine power plant
45ENKAIstanbul Peripheral Highways, Ortaköy ViaductsInfrastructureEurasiaTurkey1970-12-011973-09-01Construction of three prestressed viaducts with precast beams and with spans of 45 m. on the main arteries linking Bosphorus Bridge to the city center. The max. height of the piers which were constructed by sliding forms is about 42 m. The cast-in-place, prestressed capping beams joining two piers were built with a formwork which rested on the steel scaffolding. The main precast and prestressed beams have a length of 44 m. and weight of 120 tons and they were erected by means of special equipment
44ENKAIstanbul Peripheral Highways, Esentepe-Ortaköy Highway ConstructionInfrastructureEurasiaTurkey1969-11-011973-08-01All infrastructure works of Esentepe - Ortaköy Highway km. 16+300-19+400. The works include embankments (filling) higher than 30 m., excavation of 1,500,000 m³ and compaction
43ENKAFirst Extension of Benghazi Cement PlantCivilAfricaLibya1972-03-011973-06-01All civil works of a cement plant extension project with a capacity of 600,000 tons/year
42ENKAENKA Business Premises (1. Building)CivilEurasiaTurkey1972-01-011973-01-01Construction of 6-storey office building and landscaping
41ENKAAksa Acrylic Chemical Industry FactoryCivilEurasiaTurkey1970-09-011972-07-01Turn-key construction of a chemical process plant on an area of 20,000 m² and its wharf on the shore. The works consists of all the infrastructure of the plant, steel structure erection works, superstructure of the plant, roads and loading-unloading wharf, landscaping, foundations of the machinery and various mechanical installation works. The foundations consist of cast in-situ concrete piles under water. 2,536 m. of cast in-situ concrete piles have been utilized. Several precast elements were used for the construction lightweight plates were used on the roof
40ENKARed Mud DamInfrastructureEurasiaTurkey1970-09-011972-03-01Construction of 400 m. long, 20 m high soil dam and related pressure pipes of 30 cm in diameter and total length of 5,000 m. This da has 1,8 million m³ storage capacity for the cooling and utility water of the Seydişehir Aluminium Plant
39ENKAAzapkapı Quaywall,Crane Roads and Slipway ConstructionInfrastructureEurasiaTurkey1970-11-011972-03-01This project consists of a slipway, crane roads and quaywall. The whole structure is supported upon in-situ reinforced concrete piles
38ENKAAltaş Handtools & Steel Forging FactoryCivilEurasiaTurkey1969-12-011971-03-01Construction of the steel forging plant with a capacity of 675 tons/year for the manufacturing of handtools and automotive parts. The plant was constructed by using only precast reinforced concrete elements and steel structure roof trusses. Foundations of the machinery, sanitary installation and landscaping of the plant area were also realized by ENKA
37ENKATaşkızak Shipyard's Crane-way ConstructionInfrastructureEurasiaTurkey1968-12-011971-01-01Construction of a shipyard and crane-way
36ENKAAksu Paper Mill FactoryCivilEurasiaTurkey1968-06-011970-10-01Turn-key construction of an automatic wood pulp and paper mill with a capacity of 110,000 tons/year. Construction of 55,000 m² covered plan area and 30,000 m² humidification pool. Construction of machinery and equipment foundations, all infrastructure works, roads and auxiliary buildings covering an area of 45,000 m²
35ENKAHaliç Shipyard's Quaywall ConstructionInfrastructureEurasiaTurkey1969-07-011970-05-01Quaywall construction for the ship slipway and crane-way for 5 tons. The project consists of a slipway platform, a craneway and a quaywall. The whole structure is supported upon in-situ r.c. piles. The wet portion of slipway platform is composed of precast r.c. blocks
34ENKACamialtı Shipyard, Large Shops ConstructionCivilEurasiaTurkey1967-06-011970-02-01This plant which covers an area of 5.500 m² in Camialtı Shipyard is a steel construction founded on in-situ r.c. piles. The construction consists of a heavy parts manufacturing shop with 25 m. span-length and height of 15 m. Besides cranes of 5, 15, 30 tons lifting capacities are constructed
33ENKAHaydarpaşa Agricultural Products SilosInfrastructureEurasiaTurkey1967-10-011969-10-01Construction of reinforced concrete silos for agricultural products with a capacity of 20,000 tons.
32ENKAPimaş PVC Pipes and PVC Products FactoryCivilEurasiaTurkey1964-03-011969-03-01The project consists of a reinforced concrete factory building composed of hyperbolic - parabolic shaped plain concrete roof supported on reinforced concrete central columns and, warehouses, water distribution and sewage disposal systems, installation works and landscaping. Extension works: Construction of a 23 m. high mixer building, extension of the main factory building by steel structure construction, central heating system, administration building and social facilities
31ENKAOlmuk Corrugated Cardboard FactoryCivilEurasiaTurkey1968-04-011969-03-01The manufacturing hall, which covers an area of 10,000 m², was constructed by using precast columns and beams with an interval of 10 m. Structure trusses with a spanlength of 15 m. were used for the roof construction. This manufacturing hall is founded on 15 m. long in-situ reinforced concrete piles. There are also a boiler building and administration building in the project
30ENKAHaliç Shipyard's Fitting Wharf, Quaywall and Crane-way ConstructionInfrastructureEurasiaTurkey1968-06-011969-03-01The foundations are made of r.c. in-situ piles. The slipways are made of 80 tons precast r.c. blocks, and then assembled. The fitting wharf was also precast
29ENKAAEG-ETİ Transformator FactoryCivilEurasiaTurkey1967-10-011968-05-01The factory consists of a manufacturing hall, an assembly and a finishing hall. The assembly hall is a reinforced concrete structure with 25 m. spanlength and has a crane of a capacity of 30 tons. The finishing hall is a steel structure construction with a span of 2 x 15 m. Besides, an office building was constructed near the plant. Total covered area is about 7,000 m²
28ENKACamialtı Shipyard's Fitting Wharf and Crane-way ConstructionInfrastructureEurasiaTurkey1967-10-011968-05-01Construction of crane-way for 5 tons. The foundations are r.c. in-situ piles. The slipways were made of precast r.c. blocks and assembled. The fitting wharf was in precast system
27ENKATaşkızak Shipyard's Naval Ship Slipway ConstructionInfrastructureEurasiaTurkey1966-11-011968-01-01Construction of Historic shipyard and ship slipway
26ENKAArçelik Home Appliances Manufacturing FactoryCivilEurasiaTurkey1966-07-011967-10-01Construction of the main factory building composed of pressing, enamelling and painting halls on a total covered area of 30,000 m²., boiler house and 20 m. high stack including underground gallery connected to the main building, transformer stations and social facilities. Main factory building covers an area of 30,000 m² with a length of 290 m. and width of 100-120 m. The span of the columns of the building in longitudinal direction is 10 m. and 20 m. in width. The height of this main building varies between 9 and 13 m. 198 precast r.c. columns (B 300 concrete) were used in the construction and their weights vary between 12 and 16 tons. These columns are tied by r.c. beams. Steel structure trusses with 20 m. span were used for the roof structure. Two cranes of 20 tons and 10 tons capacity were mounted by using seel beams on the r.c. columns. In the main factory building, various machinery foundations made of heat resistant concrete, conveyor systems, underground galleries for Müller press with 6 m. depth and foundations ofpresses were built by ENKA
25ENKATürk Demir Döküm Cast Iron FactoryCivilEurasiaTurkey1965-06-011967-08-01Construction of steel structure factory building and auxiliary buildings. The contract covers sanitary, heating and electrical installations as well as roads, quaywalls, canals and 30 m. high open hearth blast furnace construction, 8 tons capacity gantry - crane with a 15 m. span and 12 m. height
24ENKAÇayırova Windowpane FactoryCivilEurasiaTurkey1965-06-011966-08-01Extension of the factory building to erect the second furnace. Reinforced concrete superstructure supports steel structure roof. Mat foundations have a thickness of 1,75 m. Earthwork and concrete works were performed 4.5 m. below the underground water table
23ENKAArçelik Agricultural Machinery FactoryCivilEurasiaTurkey1966-05-011966-06-01Steel structure factory building on an area of 2,230 m²
22ENKAGeneral Electric-Electrical Motors Manufacturing FactoryCivilEurasiaTurkey1965-05-011966-03-01Factory building consists of steel structure trusses supported by smooth surface reinforced concrete columns. Administration buildings have reinforced concrete superstructures. The project also contains heating, electrical and sanitary installations. Total covered area is 7,500 m²
21ENKAKuruçeşme Quaywall ConstructionInfrastructureEurasiaTurkey1965-12-011966-03-01Foundations of quaywalls are in-situ reinforced concrete piles. Total length of piles are 1500 m. and length of the quaywalls are 106 m.
20ENKADSİ Etlik Machine Shop ConstructionCivilEurasiaTurkey1965-01-011966-01-01Complete construction of the machine shop and related heating, electrical and sanitary installations
19ENKAUnkapanı OverpassInfrastructureEurasiaTurkey1964-08-011965-08-01Design and construction of an overpass with a span of 68 m. and width of 27 m. The r.c. superstructure is supported by in-situ r.c. group of piles, of which total length is 6,700 m. The concrete quality is B 300
18ENKAGood Year Rubber Tire Factory ExtensionCivilEurasiaTurkey1965-03-011965-08-01Extension of the factory building by steel structure construction, modifications on the existing plant and installation works. Total covered construction area is 4,000 m²
17ENKASiemens Cable FactoryCivilEurasiaTurkey1964-08-011965-06-01Construction of the cable factory with a covered area of 7,000 m². Project consist of steel structure truss supported by reinforced concrete superstructure, the walls were built by stone concrete. Contract includes machinery foundations and infrastructure works, as well
16ENKATOE Truck Assembly Factory ExtensionCivilEurasiaTurkey1964-12-011965-05-01Extension of the plant by steel structure construction and construction of reinforced concrete administration building.
15ENKAChrysler Truck Assembly FactoryCivilEurasiaTurkey1964-03-011965-02-01Turn-key construction of the heavy steel structure factory building, reinforced concrete administration building, r.c. water tower of 43.5 m high, with a capacity of 400 m³, roads, canals. The contract includes also installation work and landscaping. Total covered area is 6,100 m²
14ENKATürk Kablo Aluminium Cable FactoryCivilEurasiaTurkey1964-03-011964-11-01Construction of the heavy steel structure main factory building, auxiliary buildings, infrastructure works such as roads, water distribution and sewage disposal systems, landscaping and installation works
13ENKAGölcük Naval Ship Slipway and Crane-ways ConstructionInfrastructureEurasiaTurkey1962-09-011964-10-01The construction is made of precast reinforced concrete blocks, each 65 tons and resting on in-situ pile foundations. A new original system is applied in the construction. The slipway is designed for 10,000 tons ships
12ENKAU.S. Royal Rubber Tire FactoryCivilEurasiaTurkey1963-03-011963-11-01Heavy steel structure construction of the main factory building, construction of the machinery foundations, reinforced concrete construction of the administration building, canteen, lodging buildings and social facilities, infrastructure works such as drainage and sewage systems, roads and fences. Workshop building, pumping room substation, r.c. water tower, water distribution and fire protection systems are also included in the contract. Cast in-situ r.c. piles were used on the foundations. The covered area of the main factory building amounts to 17,000 m²
11ENKAÇayırbaşı Wharf and Quaywall ConstructionInfrastructureEurasiaTurkey1962-06-011962-10-01Construction of reinforced concrete wharf and quaywalls
10ENKAConstruction of Roads in Diyarbakır ProvinceInfrastructureEurasiaTurkey1962-05-011962-07-01Construction of several roads to oil exploration area
9ENKAHabiller-Muratçallı Road ConstructionInfrastructureEurasiaTurkey1962-02-011962-03-01Construction of a stabilised road, 8 km. in length, leading to the oil exploration area
8ENKASusanbaş Flour Mill FactoryCivilEurasiaTurkey1961-04-011961-12-01Construction of reinforced concrete flour mill plant with a capacity of 5,000 tons/month and grain silos of circular cross section founded on in-situ r.c. piles. The site area has been gained from the sea by mechanical earthfill. Covered construction area is 7,000 m². The construction of the quaywall was also realised by ENKA
7ENKABüyükdere Wharf and Quaywall ConstructionInfrastructureEurasiaTurkey1961-01-011961-11-01Construction of an in-situ reinforced concrete quaywall
6ENKAPendik Quaywall ConstructionInfrastructureEurasiaTurkey1961-06-011961-09-01Construction of an in-situ reinforced concrete quaywall, 650 m. in length
5ENKAKefeliköy Quaywall and Fishermen's Storm Refuge HarbourInfrastructureEurasiaTurkey1959-05-011960-08-01The reinforced concrete highway bridge and quaywalls bearing upon in-situ reinforced concrete piles
4ENKABabaeski-Kuleli Road ConstructionInfrastructureEurasiaTurkey1960-06-011960-07-01Construction of 10 km. stabilised road leading to the oil exploration area
3ENKAİstinye Wharf and Fishing Jetty ConstructionInfrastructureEurasiaTurkey1958-07-011959-08-01Reinforced concrete highway bridge and quaywalls bearing upon in-situ reinforced concrete piles
2ENKAİstinye Highway Bridge and Quaywall ConstructionInfrastructureEurasiaTurkey1958-02-011959-06-01Design and construction of a reinforced concrete highway bridge and 550 m. long quaywall founded on in-situ reinforced concrete piles
1ENKAYeşilyurt Coastal Protection WallsInfrastructureEurasiaTurkey1957-09-011957-12-01Construction of 550 m. long cast in place concrete sea coast protection walls
52ENKA TEKNİKNorth Rumaila Crude Oil Turbo Pump Station (PS-1) ProjectOil & Gas, PetrochemicalsAsiaIraq2013-12-012016-04-30PS-1 Depot, located approximately 60 km west of Basrah, is one of the major crude oil storage depots in Iraq housing ten storage tanks each with 82,000 m3 capacity. Oil produced at the super-giant Rumaila oil field, which comprises over one third of Iraq’s total production, is collected here and pumped to Al Fao Terminal, located 140 km away, for export via a 48” Pipeline. PS-1’s operations are critical for maintaining uninterrupted export of oil to sustain oil sales which constitutes almost all of Iraq’s income. A modernization and expansion program developed by South Oil Company of Iraq is underway to restore integrity, operability and reliability as well as increase oil export capacity. Main part of this program is the Crude Oil Turbo Pump Station (PS-1) Project consisting of EPC delivery of a pump station adjacent to the existing pump station complete with all balance of plant equipment and systems. The new pumping station has two 13 MW Gas Turbine Driven Turbo Pump Units, delivering oil 6,100 m3/hr at a pressure of 685 meters at the 42” discharge.
51ENKA TEKNİK4×125 Najybia Gas Turbine Power PlantPower PlantAsiaIraq2013-05-012015-05-19Najybia Power Plant Project, located near Basrah, was part of a master plan developed and implemented by Republic of Iraq’s Ministry of Electricity to increase the power generation capacity to meet the rapid growth of demand in the country after 25 years of war and lack of investment. The Al Najibiyah Najybia 4×125 MW Gas Turbine Power Plant Contract, one of the “Mega Deal Projects”, was signed in January 2012 with the Ministry of Electricity of Iraq. The Project consisted of engineering, procurement, construction, commissioning and start-up of a 4×125 MW Power Generation Plant to operate in simple cycle mode of operation with three type of fuel, Heavy Fuel Oil (HFO), Natural Gas and Light Distillate Oil (LDO), complete with all Balance of Plant (BOP) systems to support safe and efficient operation of Combustion Turbine Generator (CTG) units. Heavy fuel oil (HFO) is used as main fuel for CTG operation whereas; natural gas and light distillate oil (LDO) are used as back-up fuels. Plant has an overall storage capability of five (5) days for both liquid fuels (HFO & LDO). Power is generated at 15 kV in the CTGs and stepped up by main transformers to the grid voltage via 132kV and 400 kV GIS Substations. Project’s four (4) each GE Frame 9E Gas Turbine Generator Sets were free issued and delivered to site by the Owner.
50ENKA TEKNİK4x160 MW Awbari Gas Turbines Power PlantPower PlantAfricaLibya2010-12-012017-06-01Design, engineering, equipment supply, construction, commissioning and putting into operation of Crude Oil fired simple cycle power plant with a capacity of 640 MW. 4 SIEMENS CTGs. Turn-key engineering, supply for BOP parts and complete plant, construction, erection and commissioning.
49ENKA TEKNİK500 MWAl Haydariyah Simple Cycle Power PlantPower PlantAsiaIraq2012-04-012013-12-01Basic & Detail Design and Engineering of a 4 x 125 MW Simple Cycle Power Generation Plant with all Balance of Plant (BOP) systems to support safe and efficient operation of the whole Power Plant.
48ENKA TEKNİKHaydaria 4xGE Fr9E Gas Power Plant - Engineering ServicesPower PlantAsiaIraq2011-09-302012-07-30Engineering services for a simple cycle power plant including BOP facilities. It consists of mechanical, E&I and civil desing services. Basic and detail engineering services for 4x125 MW Simple Cycle Power Plant BOP Facilities.
47ENKA TEKNİKZawia Desalination Plant Project (Sea Water Thermal (MED-TVC) Plant)Oil & Gas, PetrochemicalsAfricaLibya2006-07-112012-02-29Zawia Desalination Plant Project, located in Zawia city in western part of Libya in 60 km distance to capital city Tripoli, was in part of a development plan implemented by General Electricity Company of Libya, in the period of 40th Anniversary preparations of Libyan Leader, to cover high demand of reliable water sources in eastern part of Libya. The Project consisted of engineering, procurement, construction, commissioning and start-up of a 4 x 20.000 m3/day Water Production Plant with three type of fuel, Heavy Fuel Oil (HFO), NG and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. NG is planned to be used as main fuel for MED Desalination Plant operation whereas; heavy fuel oil (HFO) are used as back-up fuels. Main process and equipment, MED evaporators, boilers and auxiliaries are supplied by Sidem (Veolia, FR) as consortium partner of the Project. The project includes a relatively large water distribution network line in 142 km with water storage tanks and pumping stations.
46ENKA TEKNİKSupply and Erection of Zawia Potable Water Pipeline ProjectOil & Gas, PetrochemicalsAfricaLibya2007-06-232011-06-30EPC base project for main potable water distribution network in DI piping in Zawia region with pumping stations and water storage tanks in capacity of 5000 to 20000 m3. Turn-key engineering, supply, construction, erection and commissioning of a network ( total 140 km DI pipe), 4 nos.pump station and 14 nos.water reservoirs.
45ENKA TEKNİKZUARA Desalination Plant Project (Sea Water Thermal (MED-TVC) Plant)Oil & Gas, PetrochemicalsAfricaLibya2007-03-142010-11-30Zuara Desalination Plant Project, located in near Zuara city within 10 km in western part of Libya, in 100 km distance to capital city Tripoli, was in part of a development plan implemented by General Electricity Company of Libya, in the period of 40th Anniversary preparations of Libyan Leader, to cover high demand of reliable water sources in eastern part of Libya. The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20.000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO), and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. HFO is planned to be used as main fuel for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels. Sidem (Veolia, FR) as consortium partner of the Project.
44ENKA TEKNİKDerna Desalination Plant Project (Sea Water Thermal (MED-TVC) Plant)Oil & Gas, PetrochemicalsAfricaLibya2006-08-052010-08-30Derna Desalination Plant Project, located in Derna city in eastern part of Libya, was in part of a development plan implemented by General Electricity Company of Libya, in the period of 40th Anniversary preparations of Libyan Leader, to cover high demand of reliable water sources in eastern part of Libya. The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20.000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. Heavy fuel oil (HFO) is used as main fuel for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels. The project consists of a redundant sea water intake system of which complete basic and detailed engineering was included in EPC scope of the Project. Main process and equipment, MED evaporators, boilers and auxiliaries are supplied by Sidem (Veolia, FR) as consortium partner of the Project. The project includes a water distribution network line with water storage tanks.
43ENKA TEKNİKSoussa Desalination Plant Project (Sea Water Thermal (MED-TVC) Plant)Oil & Gas, PetrochemicalsAfricaLibya2006-08-052010-08-15Soussa Desalination Plant Project, located in Soussa city in eastern part of Libya, was in part of a development plan implemented by General Electricity Company of Libya, in the period of 40th Anniversary preparations of Libyan Leader, to cover high demand of reliable water sources in eastern part of Libya. The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20.000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. Heavy fuel oil (HFO) is used as main fuel for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels. The project consists of a redundant sea water intake system of which complete basic and detailed engineering was included in EPC scope of the Project. Main process and equipment, MED evaporators, boilers and auxiliaries are supplied by Sidem (Veolia, FR) as consortium partner of the Project.
42ENKA TEKNİK570 MW Zwitina Gas Turbines Power PlantPower PlantAfricaLibya2008-04-262012-08-01Zwitina Power Plant is designed for Simple Cycle Operation. The plant consists of 2 (two) Combustion Turbine – Generators (CTG) each nominally rated at 285 MW power producing capacity at generator output terminals at ISO conditions. Base fuel is natural gas while diesel oil is also available as backup fuel. The CTG’s for this project are Siemens Model SGT5-PAC-4000F. Overall plant design, sub-systems design and selected equipment are suitable for future conversion into Combined Cycle Operation. Power island equipment (i.e., Combustion Turbine – Generator packages and their auxiliary packages) have been procured directly by GESCO (Global Electricity Service Company of Libya) while ET was responsible for complete plant engineering, procurement of Balance of Plant (BOP) equipment and material, Natural Gas Pipe line and complete site works (construction and erection), commissioning and start-up.
41ENKA TEKNİKDedusting Bag Filter Rehabilitation ProjectCivilAfricaLibya2003-07-162008-03-15EPC project for replacement of old type dedusting filters with modern bag type dedusting units including auxiliaries in 4 cement plants in Libya. Complete New Supply and Modification of the Existing Dedusting Filters (total no. of 78 pieces), including Design, Detail Engineering, Equipment Supply, Erection Works, Dust Content Measurements, Start-up and Commissioning Activities
40ENKA TEKNİKSouq Al-Khamis Cement Plant Kiln Section Replacement ProjectCivilAfricaLibya2005-10-092007-06-30EPC project for replacement of old kiln sections and renavation of old kiln tyres, gears. Turn-key engineering, supply, erection and commissioning for replacement of sections of two rotary cement kilns.
39ENKA TEKNİKAFŞİN ELBİSTAN - B, FGD Plant, TED Project, FGD SectionMaterial HandlingEurasiaTurkey2000-08-302006-08-31Flue Gas Desulphurisation Plant, Limestone Handling & Grinding System's Basic and Detail Design, Supply of Equipmens, Supervision of Erection and Commissioning
38ENKA TEKNİKMB Sugar Plant Erection and Commissioning ProjectCivilEurasiaTurkey2005-07-202006-08-03Complete erection and commissioning of a sugar producing plant. Complete Erection and Commisioning of the Sugar Plant including Mechanical Installation, Piping, Instrumentation and Electrical Installation
37ENKA TEKNİKSakhalin I, De Kastri Terminal Sewage Treatment Plant ProjectOil & Gas, PetrochemicalsEurasiaRussian Federation2004-11-242005-11-14EP base project for sewage treatment system including supervision. Equipment Supply, Training, Supervising for Erection and Commissioning
36ENKA TEKNİKErection of Grate Cooler at Benghazi Line IICivilAfricaLibya2005-05-072005-10-31Dismantling of old cooler of the cement plant and EPC project of a new cooler unit as replacement in the latest technology. Erection and Commissioning of Grate Cooler at Benghazi Line II
35ENKA TEKNİKAFŞİN ELBİSTAN - B, FGD Plant, TED Project, FGD Section Electrical Engineering Services and Material SupplyPower PlantEurasiaTurkey2000-11-302004-10-01Electrical engineering services and supply package of the main project. Flue Gas Desulphurisation Plant, Electrical Detail Engineering Services, Procurement and Supply of Electrical Construction Material, Site Supervision Services for Erection.
34ENKA TEKNİKIndustrial Type Kraft Paper Bags Manufacturing Plant MusellataCivilAfricaLibya2001-12-252004-09-09EPC project for complete kraft paper cement bag manufacturing plant including BOP facilities of it. Supply of Detail Engineering (Civil, Mechanical, Piping, Electric and Instrumentation), Equipment Supply, Erection Works, Taking over, Technical Assistance and Training of Client Personnel for a period of one year. Provision of Cement Paper Bag Production Plant, Management Team.
33ENKA TEKNİKMaintenance and Repair Project at LISCO Misurata Ship PortCivilAfricaLibya2004-01-272004-06-12Engineering, Material Supply, and Site Works for; Replacement of Damaged Steel Parts of Fixed boom, Telescobic boom, Vertical boom Conveyors, Replacement and Repair of Secondary Structures together with Replacement of Relevant Switches and Instruments. Start-up and Commissioning. Complete Engineering, Material Supply, and Site Works for renavation of loading system at Ship Port including start-up and commissioning.
32ENKA TEKNİKCS-1 Kırklareli Compressor Station, Unit K4 Supply and Construction ProjectOil & Gas, PetrochemicalsEurasiaTurkey2000-03-302002-11-07EPC project for NG compressor station including BOP facilities. Turn-key Construction of Unit K4 at CS-1 Kirklareli Compressor Station including Civil, Mechanical and Electrical Engineering, Equipment and Material Supply and Civil Works.
31ENKA TEKNİKİZMİR BOO CCPP Fuel Gas Pipeline and Pressure Reducing, Metering Station ProjectPower PlantEurasiaTurkey2001-05-152002-03-21EPC project scope for gas RMS package of the power plant. Supply of Basic and Detail Engineering, All Civil Engineering Work, Piping Engineering and Design (Including Stress Analysis), All Piping Material Supply, Gas Filters, Heaters, Reducing Unit, Metering Unit and Control Systems Supply, Electrical Material Supply, All Site Works (Civil Works, Piping, Mechanical and Electrical / Instrumentation Erection Works, Testing and Commissioning).
30ENKA TEKNİKCS-1 Kırklareli Compressor Station, Unit K3 Upgrade and Revamping ProjectOil & Gas, PetrochemicalsEurasiaTurkey1999-08-062002-03-19EPC project for NG compressor station including BOP facilities. Turn-key Upgrading and Revamping of Unit K3 at CS-1 Kirklareli Compressor Station including Civil, Mechanical and Electrical Engineering, Equipment and Material Supply and Civil Works.
29ENKA TEKNİKLEBDA Cement Plant, Limestone Hopper ModificationCivilAfricaLibya2001-03-032002-03-07EPC project for implementation of rotating discharge equipment in order to maintain uninterrupted limestone feeding to cement production process. Installation of a Central Rotating Discharge Equipment in order to Discharge Limestone from a Concrete Hopper (3000 cu.m)
28ENKA TEKNİKLEBDA Cement Plant, Clinker Cooler RenovationCivilAfricaLibya2001-03-032002-03-07Replacement of main sections of the cooler with the latest technology equipments. Rehabilitation and Renovation of Clinker Cooler.
27ENKA TEKNİKİZMİR BOO CCPP Project, Water Treatment SystemPower PlantEurasiaTurkey2000-10-182001-11-27EPC package for the treatment system to produce process water for use in power plant. Detail Engineering, Equipment Supply, Erection, Commissioning and Start-up.
26ENKA TEKNİKGEBZE - ADAPAZARI BOO CCPP Fuel Gas Pipeline and Pressure Reducing, Metering Station ProjectPower PlantEurasiaTurkey2001-01-132001-10-31EPC project scope for gas RMS package of the power plant. Supply of Basic and Detail Engineering, All Civil Engineering Work, Piping Engineering and Design (Including Stress Analysis), All Piping Material Supply, Gas Filters, Heaters, Reducing Unit, Metering Unit and Control Systems Supply, Electrical Material Supply, All Site Works (Civil Works, Piping, Mechanical and Electrical / Instrumentation Erection Works, Testing and Commissioning).
25ENKA TEKNİKGEBZE - ADAPAZARI BOO CCPP Project, Water Treatment SystemPower PlantEurasiaTurkey2000-07-142001-09-27EPC package for the treatment system to produce process water for use in power plant. Detail Engineering, Equipment Supply, Erection, Commissioning and Start-up.
24ENKA TEKNİKCement Plant, Electrostatic Precipitator & Water Spray System RenovationCivilAfricaLibya2000-01-012001-04-05Complete replacement of inner part of old EPC type dedusting units including auxiliaries. Turn-key Construction of Electrostatic Precipitator & Water Spray System (2 no’s).
23ENKA TEKNİKNew DCS 1800 Cellular Communication Network Base StationsInfrastructureEurasiaTurkey1999-09-012000-11-01Site Search, Survey and Engineering Works for Implementation of Base Stations in TURKEY.
22ENKA TEKNİKEGYPTALUM, Calcined Coke Storage Project (16.000 MT)CivilAfricaEgypt1997-10-132000-10-21EP base project for calcines coke handling system including supervision. Basic and Detail Design, Equipment Supply of a Calcined Coke Storage (16.000 MT) Silos and Conveying System, Supervision of Erection, Training.
21ENKA TEKNİKSODA SANAYİİ A.Ş., Lime Discharge Conveyor System ModernizationOil & Gas, PetrochemicalsEurasiaTurkey1999-01-052000-04-03EP base project for lime discharge conveyor system in order to maintain envirimental friendly process conditions. Design and Supply of Lime Discharge Conveyor System, Supervision of Erection.
20ENKA TEKNİKCS-1 Kırklareli Compressor Station, K1&K2 Units Upgrade ProjectOil & Gas, PetrochemicalsEurasiaTurkey1997-05-221998-09-30EPC project for NG compressor station including BOP facilities. Turn-key Upgrading and Revamping of Unit K1&K2 at CS-1 Kirklareli Compressor Station including Civil, Mechanical and Electrical Engineering, Equipment and Material Supply and Civil Works.
19ENKA TEKNİKSupply and Construction of CS-3 Compressor Station ProjectOil & Gas, PetrochemicalsEurasiaTurkey1996-07-181998-07-31EPC project for NG compressor station including BOP facilities. Turn-key Construction of CS-3 Compressor Station including Civil, Mechanical and Electrical Engineering, Equipment and Material Supply and Civil Works.
18ENKA TEKNİKZliten Cement Plant, Replacement of Gas DuctsCivilAfricaLibya1995-01-011997-01-01Turn-key Construction of Gas Ducts including Basic and Detail Engineering, Material Supply, Erection and Commissioning.
17ENKA TEKNİKMaster Foods Plant, Potable Water Treatment PlantCivilEurasiaRussian Federation1994-06-011995-08-01Engineering, Material & Equipment Supply, Supervision of Erection and Commissioning.
16ENKA TEKNİKMaster Foods Plant, Waste Water Treatment PlantCivilEurasiaRussian Federation1994-06-011995-08-01Engineering, Material & Equipment Supply, Supervision of Erection and Commissioning.
15ENKA TEKNİKLebda Cement Plant, EP Replacement ProjectCivilAfricaLibya1994-03-311995-01-24Turn-key Construction of New Electrostatic Precipitator for Preheater Kiln/Mill includingBasic and Detail Design, Material/Equipment Supply, Erection and Commissioning.
14ENKA TEKNİKKhoms Cement Plant, Rehabilitation ProjectCivilAfricaLibya1990-05-011993-07-01EPC project for rehabilitation of the cement plant in order to maintain reliable productions in quality and capacity. Maintenance and Rehabilitation Works including Design, Engineering, Equipment Supply, Civil Works, Installation, Erection, Start-up, Commissioning, Maintenance and Training Services for the following sections. Preblending Storage, . Cooling Tower, . Electrostatic Precipitator, . Gas Analysers, . Sampling Station & X-ray, . Gepol Preheater, . Kiln Inlet Sealing.
13ENKA TEKNİKÇanakkale Water Treatment PlantCivilEurasiaTurkey1987-03-011992-08-01Turn-Key Construction of a Potable Water Treatment Plant.
12ENKA TEKNİKUm-Qasr Rail Tanker Off-Loading Cement Silos Feeding ProjectCivilAsiaIraq1989-11-011990-08-01Turn-Key Construction of Rail Tanker Unloading and Existing Cement Silos Feeding System.
11ENKA TEKNİKFalluja White Cement PlantCivilAsiaIraq1988-01-011990-01-01Provision of Maintenance Planning and Management Team.
10ENKA TEKNİKBekhme DamPower PlantAsiaIraq1987-01-011989-01-01Design and Engineering Services for Electromechanical Systems of the Workers and Employer's Camp. Training of the Operation and Maintenance Personnel, Commissioning, Operation and Maintenance of the installed System.
9ENKA TEKNİKBaghdad Cigarettes PlantCivilAsiaIraq1985-01-011989-01-01Provision of Start-up, Commissioning and Training Team.
8ENKA TEKNİKNazilli Waste Water Treatment PlantCivilEurasiaTurkey1984-10-011988-05-01Turn-key Construction of a Waste Water Treatment Plant.
7ENKA TEKNİKKubaisa Cement PlantCivilAsiaIraq1986-01-011987-10-01Turn-key Construction of Internal Railway Concrete Silo Bulk Loading and UnloadingFacilities Bag Loading and Unloading Facilities Heavy Oil Unloading Facilities.
6ENKA TEKNİKFalluja White Cement PlantCivilAsiaIraq1985-01-011987-01-01Operations Management and Maintenance of 1.000.000 ton Capacity White Cement Plant.
5ENKA TEKNİKTasluja Cement PlantCivilAsiaIraq1986-01-011987-01-01Operations Mangement and Maintenance of 1.000.000 ton Capacity Cement Plant.
4ENKA TEKNİKNahrawan Industrial Estate, Water Supply Scheme and Water Treatment PlantCivilAsiaIraq1984-08-011986-07-01Design and Engineering Services of Electromechanical Systems of a Water Treatment Plant, Pumping Station, Reservoirs, Laying of 23,4 km of dia 400 mm Ductile Iron Pipes, Laying of 39,5 km (dia 50 - dia 350 mm) Service Pipes and Commissioning.
3ENKA TEKNİKKerbela Cement PlantCivilAsiaIraq1984-01-011986-01-01Provision of Electro-Mechanical System Control and Consultancy Team.
2ENKA TEKNİKBadoosh Cement PlantCivilAsiaIraq1983-01-011985-12-31Operations Management and Maintenance of 1.000.000 ton Capacity Cement Plant.
1ENKA TEKNİKWaste Water Treatment PlantCivilAfricaLibya1980-01-011982-01-01Detail Engineering, Equipment and Material Supply, Erection and Supervision Services.
21TİTAŞEarly Works and Facilities Construction for South Caucasus Pipeline Expansion ProjectPower PlantAsiaGeorgia2014-05-132016-12-31Equipment supply and construction of 15km 6mt. width ashpalt road and Compressor Station in CSG2 area substructure, Temporary Facilities substructure, Camp Areas substructure. Quarry Operations for material needs for the motorway together with Bilgin İnş. as subcontractor. Scope of Work includes Blasting, Gabion Walls and Drainage Works. Unit price contract, supply for machinery and equipment, complete asphalt road construction, excavation and compaction of Temporary Facilities, Camp Areas, Compressor Station substructures, and Quarry Operations. Also, Balsting, Gabion Walls and Drainage Works
20TİTAŞMorine to Pristina North Junction, Section 1 Prishtine – Hani I Elezit (Route No:6) MotorwayInfrastructureEuropeKosovo2010-05-282013-12-01Equipment supply and construction of 77km of total 89km motorway, which is beginning from Morine in the Albania border then going through Prizren, Suhareke, Duhel, Malisheve, Arlatte, Komorane, Sllatina and reaching Prishtina. It is curving around Prishtina and ending in Besi small town on the north of Prishtina.Motorway is 28 meters wide which has 2 circular strips of 3.75 meters with an emergency lane of 2.5 meters and the green belt in median width between 3-4 meters. Unit price contract, supply for machinery and equipment, construction, excavation, and compaction of 77km road substructure, up to asphalt level.
19TİTAŞAlbania Motorway Project Rreshen to Reps & Quarry Operations RreshenInfrastructureEuropeAlbania2007-04-052009-06-30Equipment supply and construction of 61km long highway, which is the 18 km long stretch from Rreshen to Reps ,the 27 km Section 2 is from Reps to Thirra , 15 km long Section 3 is between Thirra and Kolshi with a 5.5 km, double bore tunnel. Quarry Operations for material needs for the motorway together with Pimtek A.Ş. as partners. Unit price contract, supply for machinery and equipment, construction, excavation, and compaction of 61km road substructure, up to asphalt level and Quarry Operations.
18TİTAŞDrainage Works at Section B&C of the Bregana Zagreb Dubrovnik Motorway ProjectInfrastructureEuropeCroatia2003-12-232004-09-30Equipment supply and construction of the drainage works and substructure works at Section B&C of the Bregana Zagreb Dubrovnik Motorway Project. Unit price contract, supply for machinery and equipment, construction, excavation, and compaction of Drainage Works
17TİTAŞSabancı University Infrastructure WorksInfrastructureEurasiaTurkey1998-05-012001-08-31Earthmoving, Grading and Structural Backfill works of Sabancı University Infrastructure Works/ Istanbul. Scope of work includes all pipe laying, construction of a mini tunnel, construction of a man-made pond, campus roads and asphalt works, construction of some concrete buildings. Unit price contract, Earthwork, Grading and Structural Backfill. Also, works include all pipe laying, construction of a mini tunnel, construction of a man-made pond, campus roads and asphalt works, construction of some concrete buildings.
16TİTAŞENKA Country (ENÇA) Infrastructure WorksInfrastructureEurasiaTurkey1999-10-012000-09-30Earthmoving, Grading and Structural Backfill works of ENKA Country (ENÇA) Infrastructure Works Hereke / Izmit. Unit price contract, Earthwork, Grading and Structural Backfill
15TİTAŞUSA Istanbul Embassy Infrastructure WorksInfrastructureEurasiaTurkey2001-01-012001-12-31Equipment supply and infrastructure works of USA Istanbul Embassy. Equipment rental, supply for machinery and equipment, construction, excavation, and compaction of USA Istanbul Embassy infrastructure
14TİTAŞAliağa Natural Gas Combined Cycle Power PlantPower PlantEurasiaTurkey2001-01-012002-08-31Earthmoving, Grading and Structural Backfill works of Aliağa Natural Gas Combined Cycle Power Plant / Izmir. Scope of work includes all substructure pipe laying, drainage system earthworks, consruction of cooling water system from sea level, all asphalt roads within the site, building duct banks for electrical power system. Unit price contract, Earthwork, Grading and Structural Backfill Also, including all substructure pipe laying, drainage system earthworks, consruction of cooling water system from sea level, all asphalt roads within the site, building duct banks for electrical power system
13TİTAŞYounde Embassy Infrastructure WorksInfrastructureAfricaCameroon2004-01-012006-01-31Equipment supply and infrastructure works of USA Cameroon / Younde Embassy. Equipment rental, supply for machinery and equipment, construction, excavation, and compaction of USA Cameroon / Younde Embassy infrastructure
12TİTAŞBamako Embassy Infrastructure WorksInfrastructureAfricaMali2004-07-012006-09-30Equipment supply and infrastructure works of USA Mali / Bamako Embassy. Equipment rental, supply for machinery and equipment, construction, excavation, and compaction of USA Mali / Bamako Embassy infrastructure
11TİTAŞFreetown Embassy Infrastructure WorksInfrastructureAfricaSierra Leone2004-07-012005-09-01Equipment supply and infrastructure works of USA Sierra Leone / Freetown Embassy. Equipment rental, supply for machinery and equipment, construction, excavation, and compaction of USA Sierra Leone / Freetown Embassy infrastructure
10TİTAŞAlgeria Motorway Project / East-West Motorway Single Section EastInfrastructureAfricaAlgeria2005-03-012006-01-01Equipment supply and construction of total 25.25km motorway, which is beginning from El-Affroun in the Algeria reaching El Hoceinia. Unit price contract, supply for machinery and equipment, construction, excavation, and compaction of 25.25km road substructure
9TİTAŞAGIP KCO North Caspian Sea Exploration Project Quarry Operations Construction of Cuttings Pits WorksPower PlantAsiaKazakhstan2005-03-012007-01-01AGIP KCO North Caspian Sea Exploration Project Quarry Operations Construction of Cuttings Pits Works / Kazakhstan – Caspian Sea. Unit price contract, supply for machinery and equipment, excavation, and Quarry Operations.
8TİTAŞGerede-Ankara and Ankara Peripheral Motorway under E+B Contract, Substructure and Drainage WorksInfrastructureEurasiaTurkey1991-10-251997-12-31Equipment supply and construction of the drainage works and substructure works at Gerede-Ankara and Ankara Peripheral Motorway Project. Unit price contract, supply for machinery and equipment, construction, excavation, and compaction of Gerede-Ankara and Ankara Peripheral Motorway
7TİTAŞKahramanmaraş City, Construction of Sewage System, Citywater System, Road ConstructionInfrastructureEurasiaTurkey1984-01-251991-01-16Kahramanmaraş City, Construction of Sewage System, Citywater System, Road Construction. Unit price contract, supply for machinery and equipment, construction, excavation, compaction and drainage works of Kahramanmaraş City Sewage and City Water Systems
6TİTAŞSakarya District, Sapanca Municipality Sewage System Construction and Urban Utility ConnectionsInfrastructureEurasiaTurkey1985-11-031989-02-09Sakarya District, Sapanca Municipality Sewage System Construction and Urban Utility Connections. Unit price contract, supply for machinery and equipment, construction, excavation, compaction and drainage works of Sakarya District / Sapanca Municipality Sewage System
5TİTAŞAnkara Municipality City Water System Construction and Urban Utiliy ConnectionsInfrastructureEurasiaTurkey1988-05-301992-12-25Ankara III.Step Dikmen Group / IV.Step Yenimahalle Group / VI.Step Güzelyaka-Kaletepe Group / VI.Step Gaziosmanpaşa-Kavaklıdere Group City Water System Construction and Urban Utiliy Connections, C2 Main Water Line Construction, E3-2 1.Step Main Water Line Construction, Altındağ-Feridun Çelik District Sewage System, Keçiören Municipality Yakacık District Sewage System, 3.Step Darıdere Pump Station City Water Urban Utility Connections. Unit price contract, supply for machinery and equipment, construction, excavation, compaction and drainage works of Ankara Municipality City Water System
4TİTAŞDiyarbakır City, Construction of Sewage System (including Urban Utility Connections) and Discharge Collector,Construction of City Water SystemInfrastructureEurasiaTurkey1982-02-021992-08-03Diyarbakır City, Construction of Sewage System (including Urban Utility Connections) and Discharge Collector, Construction of City Water System. Unit price contract, supply for machinery and equipment, construction, excavation, compaction and drainage works of Dyarbakır City Sewage and City Water Systems
3TİTAŞBursa Water and Sanitation Project Water Supply and Sewage ConstructionInfrastructureEurasiaTurkey1995-02-061997-07-24Unit price contract, supply for machinery and equipment, construction, excavation, compaction and drainage works of Bursa Metropolitan Municipality City Sewage and City Water Systems
2TİTAŞAnkara Hypodrome Construction of 4 Blocks of 24 Boxes StaplesInfrastructureEurasiaTurkey1999-06-031999-08-24Ankara Hypodrome Construction of 4 Blocks of 24 Boxes Staples. Lump sum, supply for machinery and equipment, construction, excavation, and compaction of 4 Blocks of 24 Boxes Staples at Ankara Hypodrome
1TİTAŞRussian Natural Gas Pipeline, BOTAŞ Ankara River PassInfrastructureEurasiaTurkey1986-09-011988-08-31Russian Natural Gas Pipeline,BOTAŞ Ankara River Pass. Unit price contract, supply for machinery and equipment, construction, excavation, and compaction of Natural Gas Pipeline.
64KASKTAŞSocar Star Aegean Refinery ProjectInfrastructureEurasiaTurkey2014-11-012016-03-01Remedial Works, Permanent Anchorage
63KASKTAŞJabal Al KabaInfrastructureAsiaSaudi Arabia2014-09-012016-03-01Anchorage Works
62KASKTAŞIstanbul Strait Road Tube Crossing ProjectInfrastructureEurasiaTurkey2015-05-012016-01-01Yenikapı U-Turn & Pedestrian Bridge Diaphragm Walls, Soil Improvement Works and Bi-directional Static Load Test
61KASKTAŞPetkim Container Port Backyard and Breakwater Construction WorksInfrastructureEurasiaTurkey2015-05-012015-09-01Permanent Anchor Works
60KASKTAŞSocar Star Aegean Refinery ProjectInfrastructureEurasiaTurkey2015-01-012015-09-01Piling Works
59KASKTAŞIstanbul Strait Road Tube Crossing ProjectInfrastructureEurasiaTurkey2015-07-012015-09-01Koşuyolu Eyüp Aksot Cut & Cover Tunnels Piling Works 2nd Phase
58KASKTAŞJabal Omar Development ProjectInfrastructureAsiaSaudi Arabia2011-08-012015-09-01Anchorage Works
57KASKTAŞFirst Ring Road ProjectInfrastructureAsiaSaudi Arabia2013-03-012015-09-01Anchorage Works
56KASKTAŞKing Faisal Specialist HospitalInfrastructureAsiaSaudi Arabia2014-05-012015-08-01Piling Works
55KASKTAŞAbraj KuadiInfrastructureAsiaSaudi Arabia2013-06-012015-08-01Anchorage Works
54KASKTAŞIstanbul Strait Road Tube Crossing ProjectInfrastructureEurasiaTurkey2014-03-012015-05-30European Transition Box & Cut-Cover & U-Section Diaphragm Wall, Piling and Soil Improvement Works
53KASKTAŞIstanbul Strait Road Tube Crossing ProjectInfrastructureEurasiaTurkey2015-02-012015-04-30Kazlıçeşme U-Turn Bridge - Piling Works
52KASKTAŞEroğlu Skyland ProjectInfrastructureEurasiaTurkey2013-02-012015-01-01Excavation Support System
51KASKTAŞSt. Petersburg Western High Speed DiameterInfrastructureEurasiaRussian Federation2013-04-012014-07-01Piling Works
50KASKTAŞIstanbul Strait Road Tube Crossing ProjectInfrastructureEurasiaTurkey2012-12-012014-03-01Excavation Supoort System Construction Works for ATB
49KASKTAŞIstanbul Strait Road Tube Crossing ProjectInfrastructureEurasiaTurkey2013-06-012014-02-01Koşuyolu Eyüp Aksot Cut & Cover Tunnels Piling Works
48KASKTAŞİzmit Bay Suspension Bridge Project - South Anchor BlockInfrastructureEurasiaTurkey2013-01-012014-02-01Excavation Support System
47KASKTAŞAl Najybia 4 X 125 GE 9E Gas Turbine Power Plant ProjectInfrastructureAsiaIraq2013-01-012014-02-01Piling Works
46KASKTAŞİzmit Bay Suspension Bridge Project - North Approach ViaductsInfrastructureEurasiaTurkey2013-11-012014-01-01Excavation Support System
45KASKTAŞİzmit Bay Suspension Bridge Project - South Approach ViaductsInfrastructureEurasiaTurkey2013-06-012013-11-01Excavation Support System
44KASKTAŞUS Embassy Compaund ProjectInfrastructureAsiaAfghanistan2012-03-012013-05-01Excavation Support System
43KASKTAŞKuntsevo Multifunctional Trade and Business CenterInfrastructureEurasiaRussian Federation2011-07-012013-05-01Excavation Support System
42KASKTAŞPlot 16 BInfrastructureEurasiaRussian Federation2012-02-012013-04-01Anchorage Works
41KASKTAŞJeddah Strom Water Drainage ProgramInfrastructureAsiaSaudi Arabia2012-05-012013-01-01Excavation Support System
40KASKTAŞİzmit Bay Suspension Bridge Project - Sheet Piling WorksInfrastructureEurasiaTurkey2012-08-012012-12-01Excavation Support System
39KASKTAŞFord Otosan Automobile FactoryInfrastructureEurasiaTurkey1998-08-012012-12-01Piling Works
38KASKTAŞLevent Özdilek Shopping MallInfrastructureEurasiaTurkey2010-09-012012-11-01Excavation Support System
37KASKTAŞMetrobankInfrastructureEurasiaRussian Federation2011-06-012012-09-01Excavation Support System
36KASKTAŞBautino - Agip KCO North C. Expl.InfrastructureAsiaKazakhstan2005-04-012012-08-01Sheet Pile Driving
35KASKTAŞTüpraş İzmit Refinery (RUP)InfrastructureEurasiaTurkey2012-01-012012-07-01Piling Works
34KASKTAŞTüpraş İzmit Refinery Upgrading ProjectInfrastructureEurasiaTurkey2011-09-012012-06-01Piling Works
33KASKTAŞYakimanskayaInfrastructureEurasiaRussian Federation2011-03-012012-05-01Piling Works
32KASKTAŞPlot 16 AInfrastructureEurasiaRussian Federation2010-11-012012-01-01Excavation Support System
31KASKTAŞLamar Towers ProjectInfrastructureAsiaSaudi Arabia2007-09-012011-10-01Excavation Support System
30KASKTAŞZorlu Levent ProjectInfrastructureEurasiaTurkey2010-10-012011-06-01Excavation Support System
29KASKTAŞGemlik Borusan Port Soil Improvements WorksInfrastructureEurasiaTurkey2010-11-012011-04-01Soil Improvement Works
28KASKTAŞGemlik Mannesmann Pipe PlantInfrastructureEurasiaTurkey2010-06-012010-10-01Soil Improvement Works
27KASKTAŞVyborgInfrastructureEurasiaRussian Federation2010-04-012010-09-01Piling Works
26KASKTAŞAl Jawharah ProjectInfrastructureAsiaSaudi Arabia2009-06-012010-09-01Piling Works
25KASKTAŞAl Mashaaer Al Mugaddesah Metro ProjectInfrastructureAsiaSaudi Arabia2010-05-012010-08-01Anchorage Works
24KASKTAŞJabal KhandamahInfrastructureAsiaSaudi Arabia2007-08-012010-08-01Anchorage Works
23KASKTAŞTula Cement FactoryInfrastructureEurasiaRussian Federation2009-04-012010-05-01Piling Works
22KASKTAŞAlgeria MotormayInfrastructureAsiaAlgeria2008-12-012009-09-01Piling Works
21KASKTAŞAlbanian Motorway ProjectInfrastructureEuropeAlbania2009-02-012009-08-01Anchorage Works
20KASKTAŞUS Embassy Project - DjiboutiInfrastructureAfricaDjibouti2009-03-012009-08-01Piling Works
19KASKTAŞPaveletskaya 2 PhaseInfrastructureEurasiaRussian Federation2008-06-012009-04-01Excavation Support System
18KASKTAŞ400 MW Shatura Combined Cycle Power PlantInfrastructureEurasiaRussian Federation2008-06-012009-02-01Piling Works
17KASKTAŞOn-Shore Processing Facilty Sakhalin IslandInfrastructureEurasiaRussian Federation2003-09-012008-03-01Excavation Support System
16KASKTAŞChiller PlantInfrastructureAsiaSaudi Arabia2005-05-012007-08-01Anchorage Works
15KASKTAŞQued Athmenia DamInfrastructureAsiaAlgeria2002-11-012006-03-01Investigation Drilling, Anchorage and Piling Works
14KASKTAŞPlot 9 Moscow and St. Petersburg TowersInfrastructureEurasiaRussian Federation2004-05-012005-12-01Excavation Support System
13KASKTAŞMoscow City Plot 9InfrastructureEurasiaRussian Federation2005-04-012005-11-01Piling Works
12KASKTAŞFenerbahçe Şükrü Saraçoğlu StadiumInfrastructureEurasiaTurkey1999-08-012005-11-01Piling Works
11KASKTAŞTechinvest Plot 12InfrastructureEurasiaRussian Federation2004-07-012005-11-01Excavation Support System
10KASKTAŞJabal Al KabaInfrastructureAsiaSaudi Arabia2004-05-012005-05-01Anchorage Works
9KASKTAŞBani Najjar ProjectInfrastructureAsiaSaudi Arabia2004-04-012005-03-01Anchorage Works
8KASKTAŞPlot 13 Federation TowersInfrastructureEurasiaRussian Federation2004-04-012005-01-01Excavation Support System
7KASKTAŞPlot 10 Naberezhnaya TowersInfrastructureEurasiaRussian Federation2004-08-012004-12-01Excavation Support System
6KASKTAŞThe C&WP Topside ProjectInfrastructureAsiaAzerbaijan2003-02-012004-01-01Piling Works
5KASKTAŞDeriner DamInfrastructureEurasiaTurkey2001-09-012003-05-01Anchorage Works
4KASKTAŞRehabilitaion of Mostar BridgeInfrastructureEuropeBosnia and Herzegovina2001-05-012002-02-01Drilling Works
3KASKTAŞHilton Hotel Jeddah (Phase 1 & 2)InfrastructureAsiaSaudi Arabia1995-10-012001-09-01Excavation Support System
2KASKTAŞAliağa Cycle Power PlantsInfrastructureEurasiaTurkey2000-06-012001-01-01Soil Improvement Works
1KASKTAŞTaiba 1-2-3 (Hotel and Business Center)InfrastructureAsiaSaudi Arabia1992-05-011996-05-01Excavation Support System
135ÇİMTAŞSabine Pass LNG Terminal (Train 5)OG&C, Petrochemical PlantsN. AmericaUnited States (U.S.A.)2016-03-012017-03-01Material Supply, Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Shop Delivery of Carbon, Stainless Steel Process Piping
134ÇİMTAŞColorado Bend #1 / 3 G4J0Power PlantsAmericasUnited States (U.S.A.)2015-09-082015-12-31Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
133ÇİMTAŞFpl Peakers - Pfm 1~2 7FaPower PlantsN. AmericaUnited States (U.S.A.)2015-06-292015-01-26Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
132ÇİMTAŞKazan Tec 3 9HaPower PlantsAsiaRussian Federation2015-03-162015-07-15Pipe, pipe fittings, and hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation, and Packing and Modularization.
131ÇİMTAŞMhps Usa Grda Project Gt Piping M501JPower PlantsN. AmericaUnited States (U.S.A.)2015-03-162015-11-19GAS TURBINE PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, JIG Assembly, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
130ÇİMTAŞMhps Usa Grda Project Local Piping M501JPower PlantsN. AmericaUnited States (U.S.A.)2015-03-162015-11-19LOCAL PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
129ÇİMTAŞMhps Usa Grda Project Fuel Units (Skid) M501JPower PlantsN. AmericaUnited States (U.S.A.)2015-03-062015-11-25SKID ASSEMBLY: Complete Skid Unit Assembly, Steel, Pipe, and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Assembly, Pipe Support fabrication & Installation, Enclosure Installation, Shrink Wrapping
128ÇİMTAŞPp13 Interconnecting 1 Intercon PipingPower PlantsAfricaIvory Coast2015-02-022015-06-10BALANCE OF PLANT PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
127ÇİMTAŞGE 6F.01 Gas Turbine Piping PrefabricationPower PlantsWorldwideWorldwide2015-01-012017-01-01Material Supply, Spooling, Fabrication, NDE, Hydrotesting, Pickling/Acid Cleaning, Painting, Packing/Crating, DDU France/Germany and FCA Shop Delivery of Frame 6F.01 Turbine Onbase Piping Systems.
126ÇİMTAŞKazan 1 – G4J0 Generator PipingPower PlantsAsiaRussian Federation2014-12-152015-07-13GENERATOR PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
125ÇİMTAŞGolden Spread 1~2 7Fa-SumpPower PlantsN. AmericaUnited States (U.S.A.)2014-11-252014-12-14Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
124ÇİMTAŞKospo Project - Cooling Optimization 7FaPower PlantsAsiaKorea, South2014-11-252015-11-20Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
123ÇİMTAŞAngola LNG Additional ScopeOG&C, Petrochemical PlantsAfricaAngola2014-11-192015-06-23Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Shop Delivery of Carbon, Stainless Steel Piping
122ÇİMTAŞSyncrude 1 7EPower PlantsN. AmericaCanada2014-10-202015-07-22Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
121ÇİMTAŞBismaya 1~8 9FaPower PlantsAsiaIraq2014-09-282015-08-24Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
120ÇİMTAŞYamal 1~6 Intercon PipingPower PlantsAsiaRussian Federation2014-09-222014-09-22Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
119ÇİMTAŞBismaya 1~4 – G4J0 Generator PipingPower PlantsAsiaK.S.A.2014-08-292015-03-26GENERATOR PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
118ÇİMTAŞAngola LNGOG&C, Petrochemical PlantsAfricaAngola2014-08-012014-10-01Mechanical Design (ASME Sec.VIII Div.2), Detailing, Supply, Fabrication, Heat Treatment, NDE (including TOFD Method), Hydrotesting, Painting, and FOB Delivery of ASME U2 Stamped Pressure Vessels (in total 4 pieces) with ID= 2.3 to 3.05 m, t= 70+3mm to 100 mm, the heaviest being with the Dryer Inlet Filter Coalescer (t=100 mm / 89 ton each).
117ÇİMTAŞMhps Thailand Khanom Gt Piping 1 M701F5Power PlantsAsiaThailand2014-06-162014-12-31GAS TURBINE PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
116ÇİMTAŞMhps Thailand Khanom Local Piping 1 M701F5Power PlantsAsiaThailand2014-06-162014-12-31LOCAL PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
115ÇİMTAŞPp14 1~6 7FaPower PlantsAsiaK.S.A.2014-05-292015-06-09Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
114ÇİMTAŞKirikkale 1~2 9FbPower PlantsEurasiaTurkey2014-05-262014-11-05Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
113ÇİMTAŞMhps Thailand Khanom Fuel Units (Skid) 1 M701F5Power PlantsAsiaThailand2014-05-202014-12-31SKID ASSEMBLY: Complete Skid Unit Assembly, Steel, Pipe, and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Assembly, Pipe Support fabrication & Installation, Enclosure Installation, Shrink Wrapping
112ÇİMTAŞPp13 1~6 7FaPower PlantsAsiaK.S.A.2014-05-052014-10-10Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
111ÇİMTAŞAzito Interconnecting 1 N888Power PlantsAfricaIvory Coast2014-04-182014-10-14BALANCE OF PLANT PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
110ÇİMTAŞKirikkale 1~2 G4J0 Generator PipingPower PlantsEurasiaTurkey2014-03-312014-11-07GENERATOR PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
109ÇİMTAŞCap Kaz 1~8 Intercon PipingPower PlantsAsiaKazakhstan2014-01-302014-05-19Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
108ÇİMTAŞIzmit Bay Crossing Suspension BridgeBridgesEurasiaTurkey2014-01-012015-01-01Deck Assembly Works
107ÇİMTAŞHongliu 1~4 Intercon PipingPower PlantsAsiaChina2013-09-182013-12-05Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
106ÇİMTAŞHuoerguosi 1~5 Intercon PipingPower PlantsAsiaChina2013-09-182013-11-15Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
105ÇİMTAŞJiayuguan 1~4 Intercon PipingPower PlantsAsiaChina2013-09-182013-12-05Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
104ÇİMTAŞJinhe 1~4 Intercon PipingPower PlantsAsiaChina2013-09-182013-11-18Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
103ÇİMTAŞAzito 1-Pj01 Pj01Power PlantsAfricaIvory Coast2013-08-272014-07-08P22 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
102ÇİMTAŞ16 Bed Tuapse CU1 PSA SkidOG&C, Petrochemical PlantsAsiaRussian Federation2013-08-202014-08-14Material Supply, Steel Fabrication & Piping , NDE, Hydrostatic Testing, Painting, E&I , Insulation, Assembly, Packing, Crating, EXW Delivery of PSA Skids
101ÇİMTAŞNanchong 1 Intercon PipingPower PlantsAsiaChina2013-07-182013-08-23Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
100ÇİMTAŞIzmit Bay Crossing Suspension BridgeBridgesEurasiaTurkey2013-07-012015-03-013D Modelling, engineering, supply, fabrication of the steel towers (total 18,000 tonnes) and the Orthotropic Box Girders (total 34 tonnes) including yard assembly Box Girders. İzmit Suspension Bay Bridge will be the 4. longest suspension bridge of the world with total length of 2,682 m and tower to tower lentgh of 1,550 m.
99ÇİMTAŞHabas 1~2 9FaPower PlantsEurasiaTurkey2013-02-012013-11-12Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
98ÇİMTAŞWest Qurna 2 Gas Treatment, Power Generation and Distribution SystemsPower PlantsAsiaIraq2013-02-012013-12-30Conceptual, Basic and Detail Design
97ÇİMTAŞWest Qurna 2 Gas Treatment, Power Generation and Distribution Systems - Buffer TankPower PlantsAsiaIraq2013-02-012013-05-01Mechanical Design (Sec VIII. Div 1 Edition.+2011 Add.), Detailing, Supply, Fabrication, Heat Treatment, NDE, Hydrotesting, Painting and Delivery of 3 nos of Buffer Tanks of material SA 516 Gr.70 with ID= 3.5m, L= 10m, t= 44mm and weight of 135 tons.
96ÇİMTAŞGiza North 1~6 9FaPower PlantsAfricaEgypt2012-10-232013-03-08Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation, and Packing and Modularization.
95ÇİMTAŞHabas 1~2– G4J0 Generator PipingPower PlantsEurasiaTurkey2012-10-082014-01-23GENERATOR PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
94ÇİMTAŞThailand, Gulf Nong-Seang Project Gt Piping 1- 4 M701F4Power PlantsAsiaThailand2012-09-182013-03-27GAS TURBINE PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
93ÇİMTAŞThailand, Gulf Nong-Seang Project Local Piping 1- 4 M701F4Power PlantsAsiaThailand2012-09-182013-03-28LOCAL PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
92ÇİMTAŞThailand, Gulf Nong-Seang Project Fuel Units (Skid) 1- 4 M701F4Power PlantsAsiaThailand2012-08-312013-05-08SKID ASSEMBLY: Complete Skid Unit Assembly, Steel, Pipe, and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Assembly, Pipe Support fabrication & Installation, Enclosure Installation, Shrink Wrapping
91ÇİMTAŞKumishi 1 Intercon PipingPower PlantsAsiaChina2012-07-252013-02-19Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
90ÇİMTAŞLunnan 1 Intercon PipingPower PlantsAsiaChina2012-07-252013-02-19Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
89ÇİMTAŞMojave 1~2-Pj01 Pj01Power PlantsN. AmericaUnited States (U.S.A.)2012-06-182013-03-20P22 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
88ÇİMTAŞKuntsevo Multifunctional, Shopping Entertainment, Administrative Office ComplexPublic BuildingsAsiaRussian Federation2012-06-012013-07-01Detailing, modeling, supply and fabrication of 4,600 tons of buildings structural steel.
87ÇİMTAŞKorea Yulcheon Fuel Units 1/ 2 M501JPower PlantsAsiaKorea, South2012-05-302012-12-04SKID ASSEMBLY: Complete Skid Unit Assembly, Steel, Pipe, and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Assembly, Pipe Support fabrication & Installation, Enclosure Installation, Shrink Wrapping
86ÇİMTAŞKorea Yulcheon Gt Piping 1/ 2 M501JPower PlantsAsiaKorea, South2012-05-302012-12-04GAS TURBINE PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
85ÇİMTAŞKorea Yulcheon Local Piping 1/ 2 M501JPower PlantsAsiaKorea, South2012-05-302012-12-05GAS TURBINE PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
84ÇİMTAŞEast To West Pipeline Booster PipingPower PlantsAsiaChina2012-03-212012-11-02Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
83ÇİMTAŞEmal 1~2-Pj01 Pj01Power PlantsAsiaUnited Arab Emirates2012-02-202013-01-07P22 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
82ÇİMTAŞKorea Posco Pohan-Fuel Units 1 M501S(Da)Power PlantsAsiaKorea, South2012-02-142012-11-22SKID ASSEMBLY: Complete Skid Unit Assembly, Steel, Pipe, and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Assembly, Pipe Support fabrication & Installation, Enclosure Installation, Shrink Wrapping
81ÇİMTAŞKorea Posco Pohan-Fuel Units 2 M501S(Da)Power PlantsAsiaKorea, South2012-02-142013-01-29SKID ASSEMBLY: Complete Skid Unit Assembly, Steel, Pipe, and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Assembly, Pipe Support fabrication & Installation, Enclosure Installation, Shrink Wrapping
80ÇİMTAŞKorea Posco Pohan-Gt&Gc Piping 1 M501S(Da)Power PlantsAsiaKorea, South2012-02-132012-11-20GAS TURBINE PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
79ÇİMTAŞKorea Posco Pohan-Local Piping 1 501S(DA)Power PlantsAsiaKorea, South2012-02-132012-11-19GAS TURBINE PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
78ÇİMTAŞBanha 1~2 - Gt Generator Piping Generator PipingPower PlantsAfricaEgypt2012-02-022012-09-12GENERATOR PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
77ÇİMTAŞOman Muscat International AirportAirportsAsiaOman2011-12-012013-12-01Detailed Engineering, Supply, Fabrication and Erection of the building Structural Steel. The first international airport project for Cimtas and includes 1.400 tons of casting components.
76ÇİMTAŞChuba Chita 1 7FaPower PlantsAsiaJapan2011-11-242012-04-17Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
75ÇİMTAŞBanha 1~2 9FaPower PlantsAfricaEgypt2011-11-032012-09-06Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing and Modularization.
74ÇİMTAŞShaybah 1~11 7EPower PlantsAsiaK.S.A.2011-08-312012-02-27Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
73ÇİMTAŞSouth Yoloten Gas Field Development ProjectOG&C, Petrochemical PlantsAsiaTurkmenistan2011-08-012012-06-01Mechanical Design (ASME Sec.VIII Div.2), Detailing, Supply, Fabrication, Heat Treatment, NDE (including TOFD Method), Hydrotesting, Painting and FOB Delivery of U2 Stamped 2 no.s of Slug Catchers with Alloy 625 weld overlay which have dimensions of with ID= 2.4 m, t= 104 mm and weight of 90 tons each.
72ÇİMTAŞChilca 1 - Bop N888Power PlantsS. AmericaPeru2011-07-082011-10-26BALANCE OF PLANT PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
71ÇİMTAŞHachinohe 1 9FaPower PlantsAsiaJapan2011-05-112012-02-15Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
70ÇİMTAŞMittelsburen 1 Pj01Power PlantsEuropeGermany2011-05-032012-03-22P91 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing - IBR CERTIFICATION
69ÇİMTAŞChilca 1 - Ps01 Ps01Power PlantsS. AmericaPeru2011-04-262011-09-05P22 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
68ÇİMTAŞGuddu 1~2 9FaPower PlantsAsiaPakistan2011-04-222011-11-10Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
67ÇİMTAŞN888 Oseong Gt Interconnecting Pj01Power PlantsAsiaKorea, South2011-04-192011-09-28BALANCE OF PLANT PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
66ÇİMTAŞKashima 1 - 3 9FaPower PlantsAsiaJapan2011-04-072012-01-04Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
65ÇİMTAŞNizhnevartovsk 1 Pj01Power PlantsAsiaRussian Federation2011-03-282012-03-22P91 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing - GOST CERTIFICATION
64ÇİMTAŞGuddu 1~2 - Gt Generator Piping Generator PipingPower PlantsAsiaPakistan2011-03-142011-11-11GENERATOR PIPING: Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
63ÇİMTAŞEast To West Pipeline Intercon PipingPower PlantsAsiaChina2011-02-172012-05-12Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
62ÇİMTAŞReliance 1~3 Pj01Power PlantsAsiaIndia2011-01-182011-06-22P91 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing - IBR CERTIFICATION
61ÇİMTAŞChina 9E Dln Upgrade 9E Dln UpgradePower PlantsAsiaChina2011-01-042011-04-04Pipe, pipe fittings, support, hardware procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
60ÇİMTAŞKPS - 9 Fatmagül Sultan Power Barge ConversionPower PlantsEurasiaTurkey2011-01-012012-01-01All steel structure, reinforcement works for CCPP mounted on a barge
59ÇİMTAŞReliance 1~6 9FaPower PlantsAsiaIndia2010-12-022011-06-09Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
58ÇİMTAŞKPS - 6 Irem Sultan Powership ConversionPower PlantsEurasiaTurkey2010-11-252011-07-05Steel Works (Superstructures, Engine Hall & Switchyard, Genset foundations and reinforcements, Reinforcements below main deck, Exhaust towers and reinforcements, External platforms, Internal platforms, Steel Gratings, Transformer foundations, Steam Turbine & alternator & condenser foundation, Switchyard platform, Auxiliary equipment foundations, Watertight bulkheads)
57ÇİMTAŞKallpa Pj01Power PlantsS. AmericaArgentina2010-11-162010-12-07P91 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
56ÇİMTAŞKPS - 9 Fatmagül Sultan Power Barge ConversionPower PlantsEurasiaTurkey2010-11-012011-12-05SteelWorks(Superstructures,EngineHall&Switchyard,Gensetfoundationsandreinforcements,Reinforcementsbelowmaindeck,Exhausttowersandreinforcements,Externalplatforms,Internalplatforms,SteelGratings,Transformerfoundations,SteamTurbine&alternator&condenserfoundation,Switchyardplatform,Auxiliaryequipmentfoundations, Watertight bulkheads)
55ÇİMTAŞPp11 1~2 Pj01Power PlantsAsiaK.S.A.2010-10-292011-09-13P91 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
54ÇİMTAŞChilca 1 - Pj01 Pj01Power PlantsS. AmericaPeru2010-10-152011-09-05P91 Pipe and pipe fittings procurement and receiving inspection, induction bending, Cutting and drilling, Fit-up and welding, Visual check, Heat Treatment Nondestructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
53ÇİMTAŞElectrabel Maasvlakte - XEBM 790 MW Coal Fired Power PlantPower PlantsEuropeNetherlands2010-09-272011-03-05Material Supply, Spooling, Fabrication, Induction Bending, Heat Treatment, NDE, Painting, Bundling and DDU Site Delivery of HP/LP P92, Carbon, Stainless, and Alloy Steel Power Piping.
52ÇİMTAŞChevron Pascagoula Base Oil Project-Reactor Pipe SpoolsOG&C, Petrochemical PlantsN. AmericaUnited States (U.S.A.)2010-05-012011-12-08Basic, Detail Design, Material Supply, Fabrication, Heat Treatment, NDE, Hydro Testing, Bundling, Containerizing and FCA Shop Delivery of SS and Alloy Steel Process Piping
51ÇİMTAŞNavoi - Uzbekistan Project M701F4Power PlantsAsiaUzbekistan2010-03-022011-04-26SKID ASSEMBLY: Complete Skid Unit Assembly, Steel, Pipe, and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Assembly, Pipe Support fabrication & Installation, Enclosure Installation, Shrink Wrapping
50ÇİMTAŞKPS - 9 Fatmagül Sultan Power Barge ConversionPower PlantsEurasiaTurkey2010-01-142012-08-15Basic, Detail Design, Material Supply, Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Delivery of Carbon Steel Piping.
49ÇİMTAŞElectrabel Wilhelmshaven (XEBW) 790 MW Coal Fired Power PlantPower PlantsEuropeGermany2010-01-142010-05-05Material Supply, Spooling, Fabrication, Induction Bending, Heat Treatment, NDE, Painting, Bundling and DDU Site Delivery of HP/LP P92, Carbon, Stainless, and Alloy Steel Power Piping.
48ÇİMTAŞPembroke 2000 MW CCPP (L40 - CS,SS,Alloy)Power PlantsEuropeUnited Kingdom (U.K.)2010-01-072011-01-21Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Shop Delivery of Carbon, Stainless Steel and Alloy Power Piping.
47ÇİMTAŞKPS - 6 Irem Sultan Powership ConversionPower PlantsEurasiaTurkey2010-01-012011-01-01All steel structure, reinforcement, piping, outfitting and commissioning works for CCPP mounted on a barge
46ÇİMTAŞNUON Magnum IGCC 1200 MWPower PlantsEuropeNetherlands2009-12-292011-09-19Material Supply, Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Delivery of Carbon, Stainless and Alloy Steel Piping.
45ÇİMTAŞKraftwerk Irsching 4 CCPPPower PlantsEuropeGermany2009-11-182010-09-02Spooling, Fabrication, Induction Bending, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Shop Delivery of P92, Carbon, Stainless, Alloy and Incoloy Steel Power Piping.
44ÇİMTAŞSabiya 1~6 9FaPower PlantsAsiaKuwait2009-11-122010-04-13Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
43ÇİMTAŞKPS - 6 Irem Sultan Powership ConversionPower PlantsEurasiaTurkey2009-07-182011-08-11Basic, Detail Design, Material Supply, Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing , Delivery and Installation.
42ÇİMTAŞYajva 411 MW CCPPPower PlantsAsiaRussian Federation2009-07-102010-09-16Material Supply, Shop Prefabrication and Site Installation of Aboveground and Underground Carbon, Stainless and Alloy Steel Process and Power Piping.
41ÇİMTAŞCairo West 700 MW Thermal Power Plant (Gas/Oil Fired Units)Power PlantsAfricaEgypt2009-04-242010-01-21Material Supply(including manual and motor operated valves, instrumentation and engineered supports), Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and DDU Delivery of Carbon, Stainless and Alloy Steel Piping.
40ÇİMTAŞAngola LNGOG&C, Petrochemical PlantsAfricaAngola2009-04-072011-07-27Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Shop Delivery of Carbon, Stainless, Alloy and Incoloy Steel Process Piping
39ÇİMTAŞChubu Joetsu 1 - 6 7FaPower PlantsAsiaJapan2009-02-262009-12-23Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
38ÇİMTAŞEl Atf 750 MW CCPPPower PlantsAfricaEgypt2009-02-102009-10-20Material Supply(including manual and motor operated valves, instrumentation and engineered supports), Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and DDU Delivery of Carbon, Stainless and Alloy Steel Piping.
37ÇİMTAŞSidi Krir 750 MW CCPPPower PlantsAfricaEgypt2009-02-062009-10-20Material Supply(including manual and motor operated valves, instrumentation and engineered supports), Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and DDU Delivery of Carbon, Stainless and Alloy Steel Piping.
36ÇİMTAŞYajva 411 MW CCPPPower PlantsAsiaRussian Federation2008-12-162010-10-25Detailing, Supply, Fabrication, Packing and FCA Shop Delivery of 3100 t building steel structure of the 411 MW single shaft combine power plant. Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling and FCA Shop Delivery of Carbon, Stainless, Alloy steel. Totally 10.000 tonnes all steel, mechanic and electrical installation.
35ÇİMTAŞRijnmond II 430 MW CCPPPower PlantsEuropeNetherlands2008-11-062009-07-06Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling and Containerizing, and FOB Delivery of Carbon and Alloy Steel HRSG Power Piping.
34ÇİMTAŞEl Tebbin 700 MW Thermal Power Plant (Gas/Oil Fired Units)Power PlantsAfricaEgypt2008-10-172009-10-08Material Supply(including manual and motor operated valves, instrumentation and engineered supports), Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and DDU Delivery of Carbon, Stainless and Alloy Steel Piping.
33ÇİMTAŞZwitina CTG BuildingPower PlantsAfricaLibya2008-09-242009-01-16Detailing, modeling and fabrication of 1.250 tons of structural steel with built-up columns and hot-rolled beams. Steel grades used for this project are S275 and S355J0 complying with EN 10025. Steel structure is for CTG building in a Power Plant.
32ÇİMTAŞPp10 1~36 7EPower PlantsAsiaK.S.A.2008-09-042009-03-26Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
31ÇİMTAŞAlkhairat 1~10 9EPower PlantsAsiaIraq2008-07-102010-02-06Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
30ÇİMTAŞMotiva Crude ExpansionOG&C, Petrochemical PlantsN. AmericaUnited States (U.S.A.)2008-07-042010-10-01Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Shop Delivery of Carbon, Stainless, Alloy and Incoloy Steel Process Piping
29ÇİMTAŞMakkah Clock TowerBusiness Centers & High RisesAsiaK.S.A.2008-03-142011-05-06Detailing, modeling, supply, fabrication, and erection of structural steel (including clock substructure, top stairs) with built-up columns and hot-rolled beams pf a 240 m-tall clock tower to be built on top of a 350 m-tall concrete structure. The tower will support the world's largest clock with a diameter of 43 meters ans the project floor heights vary between 6 m and 11 m. Project specs require the steel members to be encased in concrete due to fire protection purposes. Deepest beam section is 1600 mm high, built-up I beam. Steel grades used for this project are S460 NL/ML and S355J0 complying with EN 10025.
28ÇİMTAŞ750 MW Walsum Coal Fired Unit 10Power PlantsEuropeGermany2008-03-102009-05-27Material Supply, Shop Prefabrication, Site Installation of HP/LP, P92, Carbon, Stainless and Alloy Steel Power Piping.
27ÇİMTAŞTengiz Chevroil Tengiz Oil Field Sour Gas Injection and Second Generation Project - Waste Heat BoilerOG&C, Petrochemical PlantsAsiaKazakhstan2008-01-312008-04-04Supply except the free issued materials, Structural Steel, and Module Fabrication in accordance with ASME Section VIII, Div I, and FAS Delivery of 1 no of Heat Recovery Steam Generator Module
26ÇİMTAŞRabigh 1~16 7EPower PlantsAsiaK.S.A.2007-11-092008-08-05Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
25ÇİMTAŞAngola LNGOG&C, Petrochemical PlantsAfricaAngola2007-11-012008-12-01Mechanical Design (ASME Sec.VIII Div.1 & Div.2), Detailing, Supply, Fabrication, Heat Treatment, NDE (including TOFD Method), Hydrotesting, Painting, and FAS Delivery of ASME U & U2 Stamped Pressure Vessels (in total 12 pieces) including: a CO2 Absorber of 1,000 tons with wall thickness 163 mm, 5.26m ID, 48.1m Length and Molecular Sieve Dehydrators with 197mm wall thickness and also other vessels of various sizes with ID= 1m to 5.3 m.
24ÇİMTAŞAngola LNGOG&C, Petrochemical PlantsAfricaAngola2007-11-012008-12-01Mechanical Design (ASME Sec.VIII Div.1 & Div.2), Detailing, Supply, Fabrication, Heat Treatment, NDE (including TOFD Method), Hydrotesting, Painting, and FAS Delivery of ASME U & U2 Stamped Pressure Vessels (in total 12 pieces) including: a CO2 Absorber of 1,000 tons with wall thickness 163 mm, 5.26m ID, 48.1m Length and Molecular Sieve Dehydrators with 197mm wall thickness and also other vessels of various sizes with ID= 1m to 5.3 m.
23ÇİMTAŞASAB Gas Development Stage II (AGD II)OG&C, Petrochemical PlantsAsiaUnited Arab Emirates2007-10-012008-10-30Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Shop Delivery of Carbon, Stainless, Alloy and Incoloy Steel Process Piping
22ÇİMTAŞHasdrubalOG&C, Petrochemical PlantsAfricaTunisia2007-08-012008-06-01Mechanical Design (ASME Sec.VIII Div.1 & Div.2), Detailing, Supply, Fabrication, Heat Treatment, NDE (including TOFD Method), Hydrotesting, Painting, Belzona Lining and FAS Delivery of ASME U & U2 Stamped Pressure Vessels (in total 12 pieces) including: Slug Catcher Vessels each 500 ton with wall thickness 112 mm, 3.85m ID, 45m Length and other vessels & columns of various sizes with ID= 1 to 3.85 m, Incoloy 825 and SS316L Weld Overlay where required.
21ÇİMTAŞEurasia Building Techinvest Multifunctional High-Rise Complex, Plot 12Business Centers & High RisesAsiaRussian Federation2007-03-152008-10-08Detailing, Supply, Fabrication including Machining of the Columns on both ends, Seaworthy Packing and FCA Shop Delivery of the High-Rise Building Steel Structure (Plot 12). When completed this building will be tallest (306m) high-rise in Moscow with 72 storeys, 67 above ground and 5 under. The steel frame consists of 2.300 pcs column and 9.000 pcs. beams and is fabricated by utilising 7 CNC cutting and drilling machines and 2 robotic welding systems. The thickest steel plates used on column base for this work is 400 mm. The largest Build-up box column section is 750x750 with 230 mm thick plates.
20ÇİMTAŞMarafiq 1~12 7FaPower PlantsAsiaK.S.A.2007-02-102008-02-05Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
19ÇİMTAŞShakhtar Donetsk Stadium, Donbass ArenaStadiumsEuropeUkraine2006-12-272008-08-23Detailing, Supply, Fabrication including Machining of the support legs, pressure supports on both ends and pin holes, Seaworthy Packing and FCA Shop Delivery of the Space Trusses and anchore blocks including embeddet parts. The steel structures consist of 260 t embedded anchore, 56 pcs support block (530 t) , 12xSpace Truss 3400 t ( 8xSingle Truss each 260 t , 9x65x6 m and 4xDouble Truss each 325 t , 18x65x6 m ) . Bolted connections.
18ÇİMTAŞOnshore Gas Development Stage III (OGD III)OG&C, Petrochemical PlantsAsiaUnited Arab Emirates2006-12-012007-05-01Mechanical Design (ASME Sec.VIII Div.1 & Div.2), Ladders and Platforms Design, Detailing, Supply, Fabrication, Heat Treatment, NDE (including TOFD Method), Hydrotesting, Painting and FAS Delivery of ASME U & U2 Stamped Pressure Vessels (in total 54 pieces) including: Sweet Gas Knockout Drums each 355 ton with wall thickness 157+3 mm, Columns with L= 43.9 m each and other several vessels of various sizes with ID= 0.5 to 5.5 m, Incoloy 825 and SS316L Weld Overlay and HIC Testing where required.
17ÇİMTAŞPp9Ii 1~20 7EPower PlantsAsiaK.S.A.2006-11-242007-08-21Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
16ÇİMTAŞRiyadh Pp8 1~4 7FaPower PlantsAsiaK.S.A.2006-07-292007-07-24Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
15ÇİMTAŞASAB Gas Development Stage II (AGD II)OG&C, Petrochemical PlantsAsiaUnited Arab Emirates2006-05-012008-01-01Mechanical Design (ASME Sec.VIII Div.1 & Div.2), Detailing, Supply, Vessel Fabrication, Heat Treatment, NDE (including TOFD Method), Hydrotesting, Painting and FAS Delivery of ASME U & U2 Stamped Pressure Vessels (in total 27 pieces) including: HP Absorbers each 500 ton, Columns with longest being 44.4 m and various sizes of vessels with ID= 1.5 to 3.9 m, L= 5 to 44.4m, t= 11 to 117 mm, Incoloy 825 and SS316L Weld Overlay and HIC Testing where required.
14ÇİMTAŞOnshore Gas Development Stage III (OGD III)OG&C, Petrochemical PlantsAsiaUnited Arab Emirates2006-04-132008-09-02Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FCA Shop Delivery of Carbon, Stainless, Alloy and Incoloy Steel Process Piping
13ÇİMTAŞTengiz Chevroil Tengiz Oil Field Sour Gas Injection and Second Generation ProjectOG&C, Petrochemical PlantsAsiaKazakhstan2005-05-062005-12-07Detailing, Supply, Fabrication, Galvanizing, Painting, Packing and Crating, and FCA Shop Delivery of Structural Pipe Supports, Pipe Racks and Access Platforms.
12ÇİMTAŞCity Center - Multipurpose Administrative and Business Complex, Naberezhnaya Building Tower C, Plot 10Business Centers & High RisesAsiaRussian Federation2005-03-212007-01-10Detailing, Supply, Fabrication including Machining of the Columns on both ends, Seaworthy Packing and FCA Shop Delivery of the High-Rise Building Steel Structure (Plot 10, Block C). This building is 65 storeys, 60 above ground and 5 under. The steel frame consists of 125.000 fabrication components with 560.000 bolt holes and is fabricated by utilising 7 CNC cutting and drilling machines and 2 robotic welding systems. The largest hot rolled steel section processed for this work is 1.1 ton/m with 125 mm flange thickness.
11ÇİMTAŞTengiz Chevroil Tengiz Oil Field Sour Gas Injection and Second Generation ProjectOG&C, Petrochemical PlantsAsiaKazakhstan2005-01-012005-12-01Cimtas, under a Technical Service Agreement, has designed, equipped, furnished, commissioned and operated a dedicated Pipe Spool Shop with 10.000 sqm covered shop space and 750 ton/shift/month capacity in Tengiz–Kazakhstan, which has completed the Large Bore (2 inch and above) Low Temperature Carbon Steel and Stainless Steel Spool Fabrication and Painting within 18 months including: Crude, Gas, and Sulfur Plants as well as Power & Utilities related piping systems (in total approximately 9.500 ton, 580.000 bwdiainch, 33.000 spools). The services have included in-house Heat Treatment and NDE (RT, UT, MPI, PT, MT) and Pipe Support Fabrication.
10ÇİMTAŞEgyptian LNGOG&C, Petrochemical PlantsAfricaEgypt2004-04-012005-12-01Mechanical Design (ASME Sec.VIII Div.1 & Div.2), Detailing, Supply, Fabrication, Heat Treatment, NDE, Painting and FCA Shop Delivery of U & U2 Stamped Pressure Vessels for Train-1 and Train-2 (in total 18 pieces) with ID= 1.5 to 3.8 m, t= 16 to 94 mm, the heaviest being with the Molecular Sieve Dehydrator (t= 94 mm / 291 ton each).
9ÇİMTAŞTengiz Chevroil Tengiz Oil Field Sour Gas Injection and Second Generation ProjectOG&C, Petrochemical PlantsAsiaKazakhstan2004-03-182005-09-06Detailing, Supply and Fabrication of Steel Pipes and Fittings out of Steel Plates with material quality of ASTM A516Gr70-S5, NACE MR 0175, impact tested (-46°C), diameter 36" to 92" and wall thickness 10 mm to 16 mm, Spooling thereof, Heat Treatment, 100% RT and Hydrotesting, Partial Contra-Tracing, Packing, FCA Shop Delivery. Supply, Fabrication and Shop Welding to the extent required of the Pipe Supports and Cradles are included.
8ÇİMTAŞEgyptian LNGOG&C, Petrochemical PlantsAfricaEgypt2004-03-012004-07-31Spooling, Fabrication, Heat Treatment, NDE, Painting, Bundling, Containerizing and FOB Delivery of Low Carbon and Stainless Steel Process Piping
7ÇİMTAŞTengiz Chevroil Tengiz Oil Field Sour Gas Injection and Second Generation ProjectOG&C, Petrochemical PlantsAsiaKazakhstan2004-01-222004-12-01Detailing, Supply, Fabrication, Heat Treatment, NDE, Hydrotesting, Painting, Bundling, Containerizing and FCA Shop Delivery of Low Temperature Carbon Steel and Stainless Steel Interconnecting Piping and Piperack Structural Steel.
6ÇİMTAŞTengiz Chevroil Tengiz Oil Field Sour Gas Injection and Second Generation ProjectOG&C, Petrochemical PlantsAsiaKazakhstan2003-11-012004-07-28Detailing, Supply of all material except the free issued equipment, valves and instruments, Structural Steel and Pipe Spool Fabrication, Assembly including E&I Works, FCA Shop Delivery of 5 nos of process skids in six pieces with maximum sizes of (L x W x (H1+H2)) 11 m x 4.3 m x (4.8 + 2.5) m .
5ÇİMTAŞTengiz Chevroil Tengiz Oil Field Sour Gas Injection and Second Generation ProjectOG&C, Petrochemical PlantsAsiaKazakhstan2003-05-012003-10-01Mechanical Design, Detailing, Supply, Fabrication, Heat Treatment, NDE, Hydrotesting, Painting and FCA Shop Delivery of 3 nos of Heat Exchangers, 1 no of Reformer and Self Supporting Stack.
4ÇİMTAŞTengiz Chevroil Tengiz Oil Field Sour Gas Injection and Second Generation ProjectOG&C, Petrochemical PlantsAsiaKazakhstan2003-03-012004-07-01Mechanical Design (ASME Sec.VIII Div.2), Detailing, Supply, Fabrication, Heat Treatment, NDE, Hydrotesting, Painting and FAS Delivery of 3 nos of ASME U2 Stamped Sour Gas Adsorbers: 125 ton each with ID= 3.5m and T-T= 17.8 m, material quality being SA533 C Cl. 2 with t= 67 mm plus 5 mm 316L weld overlay. Detailing, Supply and Fabrication of Ladders and Platforms included.
3ÇİMTAŞTengiz Chevroil Tengiz Oil Field Sour Gas Injection and Second Generation ProjectOG&C, Petrochemical PlantsAsiaKazakhstan2002-10-012004-09-01Mechanical Design (ASME Sec.VIII Div.1 & Div.2), Detailing, Supply, Vessel, Reactor Internal, Ladder and Platform Fabrication, Heat Treatment, NDE, Hydrotesting, Painting and FAS Export Port Delivery of ASME U & U2 Stamped Pressure Vessels for the Sulphur Plant (in total 55 pieces) including: Reactors (heaviest 280 ton), Columns (longest 45.9 m) and several vessels of various sizes with ID= 0.6 to 7.5 m, t= 8 to 77 mm, Weld Overlay and HIC testing where applicable.
2ÇİMTAŞRijnmond 790 MW CCPPOG&C, Petrochemical PlantsEuropeNetherlands2002-09-012003-07-01Detailing, Supply, Fabrication, Heat Treatment, NDE, Painting and FCA Shop Delivery of partial ASME S Stamped 2 nos of HP, 2 nos of IP and 2 nos of LP Steam Drums. HP Drums being 103 ton each, with material quality of 15NiCuMoNb5, wall thickness 105 mm, ID= 2.4 m and T-T= 14.5 m.
1ÇİMTAŞRijnmond 790 MW CCPPPower PlantsEuropeNetherlands2002-01-012002-02-01Material Supply, Shop Prefabrication and Site Installation of Aboveground and Underground Carbon, Stainless and Alloy Steel Process and Power Piping.