• 001
  • 002
  • 003

Afşin Elbistan B Thermal Power Plant

In August 1998, EUAŞ, the state owned company for electricity generation, awarded the turn-key construction of a conventional-type coal-fired thermal power plant, with a nominal capacity of 4×360 MW, to the consortium of Mitsubishi Heavy Industries Ltd. (MHI), ENKA İnşaat ve Sanayi A.Ş., Babcock Kraftwerkstechnik GmbH and GTT.

The project included the construction and installation of four steam turbojets, the flue gas desulphurization plant, the slag and ash handling system, the raw water supply system, the water treatment plant, the coal handling system, the cooling system, all ancillary plants, generating plants with their auxiliaries, storage facilities and the necessary workshops, operation and auxiliary buildings as well as all low, medium and high voltage switchgears, control and monitoring equipment and the power transformers.

The complete implementation of design as well as tests, trial runs, acceptance tests and maintenance until the temporary acceptance date, the training of all operating personnel and the provision of all necessary consumables were also included in the project.

Project Description

4×360 MW Afşin Elbistan B Thermal Power Plant

  • Detailed Engineering
  • Procurement
  • Construction

Project Features

Contract Type
Lump Sum Turn Key
Scope of Work
Detailed Engineering, Procurement, Construction
Contractor
MHI – Babcock (Gama / Tekfen / Tokar JV) – ENKA Consortium
Client
Turkish Electricity Generation & Transmission Co. Inc. – TEAŞ
Key Quantities
Concrete 188,000 m³
Equipment Erection 45,000 tons
Project Duration
Start Date 01.06.2000
Finish Date 01.10.2006
Duration 77 Months

Location

Afşin, Kahramanmaraş, Turkey
ENKA SCOPE OF SERVICES

ENKA-MHI-BABCOCK-(GAMA/TEKFEN/TOKAR JV) Consortium’s scope covered design, engineering, equipment supply, construction, commissioning and putting into operation of 4 x 360 MW Afşin Elbistan B Thermal power plant.

ENKA’s scope included the construction of the turbine building, cooling towers, process buildings, 154-380 kV Switchyard, pipe and cable trenches; supply and construction of steel pipeline with a length of 2×33 km, high level tank and pump station; construction and erection of ash handling facilities; pipe racks; supply and erection of the cooling water pipes; erection of the turbine-generator units, auxiliary facilities; electro-mechanical erection of the whole supply units (Balance of Plant); erection of all the external process pipes.

Gallery

Related Projects

Samawa 750 MW Combined Cycle Power Plant

Samawa 750 MW Combined...

Current Iraq Power Plants...
Baghdad Besmaya 1,500 MW Combined Cycle Power Plant

Baghdad Besmaya 1,500...

Baghdad Completed Featured...
Sulaymaniyah 1,500 MW CC Power Plant Conversion

Sulaymaniyah 1,500...

Completed Featured Projects...
Duhok 1,500 MW CC Power Plant Conversion

Duhok 1,500 MW CC...

Completed Duhok Featured...