• 1

Produced Water Treatment Facility

On October 31, 2019, ENKA signed an agreement with ExxonMobil Iraq Limited to construct a Produced Water Treatment Facility with a capacity of 210,000 barrels of water per day, located within the West Qurna-1 oil field near the city of Basra in Iraq.

The project includes the detailed engineering, procurement, construction, and commissioning of three water treatment trains, one produced water tank, one local equipment room, transfer pumps and all associated systems.

The treated produced water will be sent to the Water Injection Storage Tank that feeds the High Pressure Water Injection Pump System for injection wells.

The Produced Water 2 Treatment Facility project is scheduled to begin operation in April 2022.

Project Description

Produced Water Treatment Facility

Project Features

Contract Type
Lump Sum
Client
ExxonMobil Iraq Limited
Key Quantities
Concrete1,539 m3
Excavation13,884 m3
Filling59,725 m3
Piping369 tons
Structural Steel171 tons
Equipment1,334 tons
Insulation3,760 m2
Electrical Cables35,745 m
Instrumentation Cables30,045 m
Project Duration
Start Date01.12.2019
Finish Date01.04.2022
Duration28 Months

Location

Basra / Iraq
ENKA SCOPE OF SERVICES
  • The project includes the detailed engineering, procurement, construction, and commissioning of three water treatment trains, one produced water tank, one local equipment room, transfer pumps and all associated systems.

Related Projects

Produced Water Treatment Facility

Produced Water Treatment...

Basrah Current Energy...
Umm Qasr BMT Container Terminal Yard 5, Quay Wall & Marine Works

Umm Qasr BMT Container...

Basrah Civil Structural...
Dhi Qar 750 MW Combined Cycle Power Plant

Dhi Qar 750 MW Combined...

Civil Structural Engineering...
Samawa 750 MW Combined Cycle Power Plant

Samawa 750 MW Combined...

Current Energy Engineering...