{"id":77475,"date":"2022-12-28T14:20:43","date_gmt":"2022-12-28T11:20:43","guid":{"rendered":"https:\/\/www.enka.com\/?p=77475"},"modified":"2023-02-01T16:57:29","modified_gmt":"2023-02-01T13:57:29","slug":"progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project","status":"publish","type":"post","link":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/","title":{"rendered":"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 10px\"><\/div>ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany.<\/p>\n<p>As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment of procured major equipment will start in early 2023.<\/p>\n<p>The UEJV engineering and procurement teams are about to complete the procurement of \u00a0most of the Balance of Plant equipment, reached 65% piling work progress and poured the 1st mass concrete in September 2022. UEJV plans to place the main equipment on the foundation in the 1st half of 2023 after which piping works are planned on major systems.<\/p>\n<p>The \u201ccornerstone\u201d specifically prepared for the project was placed at the ceremony held at the construction site with the participation of the end-customer and all other stakeholders including partner companies ENKA and Uniper .<\/p>\n<p>With the arrival of major equipment and the completion of foundations, the shape of the project will reveal itself significantly by the end of the 1st half of 2023.<\/p>\n<p>With its in-depth experience in power generation EPCC projects, ENKA continues further detailed planning and construction activities in this project as well, and carries out all processes effectively to ensure that the project is completed safely on time and within budget.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany. As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment <a class=\"more-link\" href=\"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":25,"featured_media":77472,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[14164],"tags":[],"class_list":["post-77475","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-power-plants-ru"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany. As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Emin Y\u0131lmaz\"\/>\n\t<meta name=\"google-site-verification\" content=\"UQ-k7hcOVZluZene7_iGgI7iewEm4fFqYkW4KY9-n28\" \/>\n\t<meta name=\"p:domain_verify\" content=\"61890147e937e076e1c5dfdd6aeed81a\" \/>\n\t<meta name=\"yandex-verification\" content=\"5d2561526cb84137\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\n\t\t<!-- Google tag (gtag.js) -->\n<script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-NQHTTC6MQB\"><\/script>\n<script>\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-NQHTTC6MQB');\n<\/script>\n\t\t<meta property=\"og:locale\" content=\"ru_RU\" \/>\n\t\t<meta property=\"og:site_name\" content=\"ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta property=\"og:description\" content=\"ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany. As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/\" \/>\n\t\t<meta property=\"fb:admins\" content=\"334532790084532\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2022-12-28T11:20:43+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-02-01T13:57:29+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/enkaconstruction\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@ENKA_Cons\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany. As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#article\",\"name\":\"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project | ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"headline\":\"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project\",\"author\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/for-web-1.jpg\",\"width\":1024,\"height\":580},\"datePublished\":\"2022-12-28T14:20:43+03:00\",\"dateModified\":\"2023-02-01T16:57:29+03:00\",\"inLanguage\":\"ru-RU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#webpage\"},\"articleSection\":\"\\u042d\\u043b\\u0435\\u043a\\u0442\\u0440\\u043e\\u0441\\u0442\\u0430\\u043d\\u0446\\u0438\\u0438, \\u041d\\u0435\\u043e\\u0431\\u044f\\u0437\\u0430\\u0442\\u0435\\u043b\\u044c\\u043d\\u044b\\u0439\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/category\\\/power-plants-ru\\\/#listItem\",\"name\":\"\\u042d\\u043b\\u0435\\u043a\\u0442\\u0440\\u043e\\u0441\\u0442\\u0430\\u043d\\u0446\\u0438\\u0438\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/category\\\/power-plants-ru\\\/#listItem\",\"position\":2,\"name\":\"\\u042d\\u043b\\u0435\\u043a\\u0442\\u0440\\u043e\\u0441\\u0442\\u0430\\u043d\\u0446\\u0438\\u0438\",\"item\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/category\\\/power-plants-ru\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#listItem\",\"name\":\"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#listItem\",\"position\":3,\"name\":\"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/category\\\/power-plants-ru\\\/#listItem\",\"name\":\"\\u042d\\u043b\\u0435\\u043a\\u0442\\u0440\\u043e\\u0441\\u0442\\u0430\\u043d\\u0446\\u0438\\u0438\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#organization\",\"name\":\"ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"\\u041a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u044f \\u00ab\\u042d\\u041d\\u041a\\u0410\\u00bb \\u2013 \\u043a\\u0440\\u0443\\u043f\\u043d\\u0435\\u0439\\u0448\\u0430\\u044f \\u0441\\u0442\\u0440\\u043e\\u0438\\u0442\\u0435\\u043b\\u044c\\u043d\\u0430\\u044f \\u043a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u044f \\u0432 \\u0422\\u0443\\u0440\\u0446\\u0438\\u0438, \\u043a\\u043b\\u0430\\u0441\\u0441\\u0438\\u0444\\u0438\\u0446\\u0438\\u0440\\u043e\\u0432\\u0430\\u043d\\u043d\\u0430\\u044f \\u0436\\u0443\\u0440\\u043d\\u0430\\u043b\\u043e\\u043c \\u00ab\\u0418\\u043d\\u0436\\u0438\\u043d\\u0438\\u0440\\u0438\\u043d\\u0433 \\u041d\\u044c\\u044e\\u0441 \\u0420\\u0435\\u043a\\u043e\\u0440\\u0434\\u00bb (ENR) \\u043a\\u0430\\u043a \\u043e\\u0434\\u043d\\u0430 \\u0438\\u0437 \\u043b\\u0443\\u0447\\u0448\\u0438\\u0445 \\u043c\\u0435\\u0436\\u0434\\u0443\\u043d\\u0430\\u0440\\u043e\\u0434\\u043d\\u044b\\u0445 \\u0441\\u0442\\u0440\\u043e\\u0438\\u0442\\u0435\\u043b\\u044c\\u043d\\u044b\\u0445 \\u043a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u0439, \\u043d\\u0430\\u0447\\u0438\\u043d\\u0430\\u044f \\u0441 1982 \\u0433\\u043e\\u0434\\u0430.\",\"url\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/\",\"telephone\":\"+902123761000\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/enka-icon-112x112-1.png\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#organizationLogo\",\"width\":112,\"height\":112},\"image\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/enka_insaat_official\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCtdqyCnE1uZiCkl3Luedj6Q\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/enka\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\\\/#author\",\"url\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\\\/\",\"name\":\"Emin Y\\u0131lmaz\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#authorImage\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/litespeed\\\/avatar\\\/53f5212c4af111fe0e96fd62ef85a638.jpg?ver=1781852723\",\"width\":96,\"height\":96,\"caption\":\"Emin Y\\u0131lmaz\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#webpage\",\"url\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/\",\"name\":\"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project | ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany. As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment\",\"inLanguage\":\"ru-RU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/for-web-1.jpg\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#mainImage\",\"width\":1024,\"height\":580},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\\\/#mainImage\"},\"datePublished\":\"2022-12-28T14:20:43+03:00\",\"dateModified\":\"2023-02-01T16:57:29+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#website\",\"url\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/\",\"name\":\"ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"\\u041a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u044f \\u00ab\\u042d\\u041d\\u041a\\u0410\\u00bb \\u2013 \\u043a\\u0440\\u0443\\u043f\\u043d\\u0435\\u0439\\u0448\\u0430\\u044f \\u0441\\u0442\\u0440\\u043e\\u0438\\u0442\\u0435\\u043b\\u044c\\u043d\\u0430\\u044f \\u043a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u044f \\u0432 \\u0422\\u0443\\u0440\\u0446\\u0438\\u0438, \\u043a\\u043b\\u0430\\u0441\\u0441\\u0438\\u0444\\u0438\\u0446\\u0438\\u0440\\u043e\\u0432\\u0430\\u043d\\u043d\\u0430\\u044f \\u0436\\u0443\\u0440\\u043d\\u0430\\u043b\\u043e\\u043c \\u00ab\\u0418\\u043d\\u0436\\u0438\\u043d\\u0438\\u0440\\u0438\\u043d\\u0433 \\u041d\\u044c\\u044e\\u0441 \\u0420\\u0435\\u043a\\u043e\\u0440\\u0434\\u00bb (ENR) \\u043a\\u0430\\u043a \\u043e\\u0434\\u043d\\u0430 \\u0438\\u0437 \\u043b\\u0443\\u0447\\u0448\\u0438\\u0445 \\u043c\\u0435\\u0436\\u0434\\u0443\\u043d\\u0430\\u0440\\u043e\\u0434\\u043d\\u044b\\u0445 \\u0441\\u0442\\u0440\\u043e\\u0438\\u0442\\u0435\\u043b\\u044c\\u043d\\u044b\\u0445 \\u043a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u0439, \\u043d\\u0430\\u0447\\u0438\\u043d\\u0430\\u044f \\u0441 1982 \\u0433\\u043e\\u0434\\u0430.\",\"inLanguage\":\"ru-RU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany. As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment","canonical_url":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"UQ-k7hcOVZluZene7_iGgI7iewEm4fFqYkW4KY9-n28","p:domain_verify":"61890147e937e076e1c5dfdd6aeed81a","yandex-verification":"5d2561526cb84137","miscellaneous":"&lt;!-- Google tag (gtag.js) --&gt;\n&lt;script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-NQHTTC6MQB\"&gt;&lt;\/script&gt;\n&lt;script&gt;\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-NQHTTC6MQB');\n&lt;\/script&gt;"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#article","name":"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","headline":"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project","author":{"@id":"https:\/\/www.enka.com\/ru\/author\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\/#author"},"publisher":{"@id":"https:\/\/www.enka.com\/ru\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2022\/11\/for-web-1.jpg","width":1024,"height":580},"datePublished":"2022-12-28T14:20:43+03:00","dateModified":"2023-02-01T16:57:29+03:00","inLanguage":"ru-RU","mainEntityOfPage":{"@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#webpage"},"isPartOf":{"@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#webpage"},"articleSection":"\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u0438, \u041d\u0435\u043e\u0431\u044f\u0437\u0430\u0442\u0435\u043b\u044c\u043d\u044b\u0439"},{"@type":"BreadcrumbList","@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/#listItem","position":1,"name":"Home","item":"https:\/\/www.enka.com\/ru\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/category\/power-plants-ru\/#listItem","name":"\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u0438"}},{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/category\/power-plants-ru\/#listItem","position":2,"name":"\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u0438","item":"https:\/\/www.enka.com\/ru\/category\/power-plants-ru\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#listItem","name":"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#listItem","position":3,"name":"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project","previousItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/category\/power-plants-ru\/#listItem","name":"\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u0438"}}]},{"@type":"Organization","@id":"https:\/\/www.enka.com\/ru\/#organization","name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"\u041a\u043e\u043c\u043f\u0430\u043d\u0438\u044f \u00ab\u042d\u041d\u041a\u0410\u00bb \u2013 \u043a\u0440\u0443\u043f\u043d\u0435\u0439\u0448\u0430\u044f \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u043d\u0430\u044f \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u044f \u0432 \u0422\u0443\u0440\u0446\u0438\u0438, \u043a\u043b\u0430\u0441\u0441\u0438\u0444\u0438\u0446\u0438\u0440\u043e\u0432\u0430\u043d\u043d\u0430\u044f \u0436\u0443\u0440\u043d\u0430\u043b\u043e\u043c \u00ab\u0418\u043d\u0436\u0438\u043d\u0438\u0440\u0438\u043d\u0433 \u041d\u044c\u044e\u0441 \u0420\u0435\u043a\u043e\u0440\u0434\u00bb (ENR) \u043a\u0430\u043a \u043e\u0434\u043d\u0430 \u0438\u0437 \u043b\u0443\u0447\u0448\u0438\u0445 \u043c\u0435\u0436\u0434\u0443\u043d\u0430\u0440\u043e\u0434\u043d\u044b\u0445 \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u043d\u044b\u0445 \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u0439, \u043d\u0430\u0447\u0438\u043d\u0430\u044f \u0441 1982 \u0433\u043e\u0434\u0430.","url":"https:\/\/www.enka.com\/ru\/","telephone":"+902123761000","logo":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2015\/07\/enka-icon-112x112-1.png","@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#organizationLogo","width":112,"height":112},"image":{"@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#organizationLogo"},"sameAs":["https:\/\/www.instagram.com\/enka_insaat_official\/","https:\/\/www.youtube.com\/channel\/UCtdqyCnE1uZiCkl3Luedj6Q","https:\/\/www.linkedin.com\/company\/enka"]},{"@type":"Person","@id":"https:\/\/www.enka.com\/ru\/author\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\/#author","url":"https:\/\/www.enka.com\/ru\/author\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\/","name":"Emin Y\u0131lmaz","image":{"@type":"ImageObject","@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#authorImage","url":"https:\/\/www.enka.com\/wp-content\/litespeed\/avatar\/53f5212c4af111fe0e96fd62ef85a638.jpg?ver=1781852723","width":96,"height":96,"caption":"Emin Y\u0131lmaz"}},{"@type":"WebPage","@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#webpage","url":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/","name":"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany. As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment","inLanguage":"ru-RU","isPartOf":{"@id":"https:\/\/www.enka.com\/ru\/#website"},"breadcrumb":{"@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#breadcrumblist"},"author":{"@id":"https:\/\/www.enka.com\/ru\/author\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\/#author"},"creator":{"@id":"https:\/\/www.enka.com\/ru\/author\/emin-yilmaz_245368_-2-2-2-2-2-2-2-2-2-2-2-2\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2022\/11\/for-web-1.jpg","@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#mainImage","width":1024,"height":580},"primaryImageOfPage":{"@id":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/#mainImage"},"datePublished":"2022-12-28T14:20:43+03:00","dateModified":"2023-02-01T16:57:29+03:00"},{"@type":"WebSite","@id":"https:\/\/www.enka.com\/ru\/#website","url":"https:\/\/www.enka.com\/ru\/","name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"\u041a\u043e\u043c\u043f\u0430\u043d\u0438\u044f \u00ab\u042d\u041d\u041a\u0410\u00bb \u2013 \u043a\u0440\u0443\u043f\u043d\u0435\u0439\u0448\u0430\u044f \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u043d\u0430\u044f \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u044f \u0432 \u0422\u0443\u0440\u0446\u0438\u0438, \u043a\u043b\u0430\u0441\u0441\u0438\u0444\u0438\u0446\u0438\u0440\u043e\u0432\u0430\u043d\u043d\u0430\u044f \u0436\u0443\u0440\u043d\u0430\u043b\u043e\u043c \u00ab\u0418\u043d\u0436\u0438\u043d\u0438\u0440\u0438\u043d\u0433 \u041d\u044c\u044e\u0441 \u0420\u0435\u043a\u043e\u0440\u0434\u00bb (ENR) \u043a\u0430\u043a \u043e\u0434\u043d\u0430 \u0438\u0437 \u043b\u0443\u0447\u0448\u0438\u0445 \u043c\u0435\u0436\u0434\u0443\u043d\u0430\u0440\u043e\u0434\u043d\u044b\u0445 \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u043d\u044b\u0445 \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u0439, \u043d\u0430\u0447\u0438\u043d\u0430\u044f \u0441 1982 \u0433\u043e\u0434\u0430.","inLanguage":"ru-RU","publisher":{"@id":"https:\/\/www.enka.com\/ru\/#organization"}}]},"og:locale":"ru_RU","og:site_name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","og:type":"article","og:title":"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","og:description":"ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany. As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment","og:url":"https:\/\/www.enka.com\/ru\/progress-in-the-construction-of-the-dradenau-combined-heat-and-power-plant-project\/","fb:admins":"334532790084532","article:published_time":"2022-12-28T11:20:43+00:00","article:modified_time":"2023-02-01T13:57:29+00:00","article:publisher":"https:\/\/www.facebook.com\/enkaconstruction\/","twitter:card":"summary_large_image","twitter:site":"@ENKA_Cons","twitter:title":"Progress in the Construction of the Dradenau Combined Heat and Power Plant Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","twitter:description":"ENKA with its joint venture partner Uniper (UEJV) is carrying out the construction of a Combined Heat and Power Plant of approximately 180 MW electric and 260 MW district heating capacity at Dradenau in Hamburg, Germany. As of October 2022, the UEJV almost completed the basic engineering work and made progress in detailed engineering. Shipment"},"aioseo_meta_data":{"post_id":"77475","title":"#post_title #separator_sa #site_title","description":"#post_excerpt","keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":{"id":"aioseo-article-6389a8c82da72","slug":"article","graphName":"Article","label":"Article","properties":{"type":"BlogPosting","name":"#post_title","headline":"#post_title","description":"#post_excerpt","image":"","keywords":"","author":{"name":"#author_name","url":"#author_url"},"dates":{"include":true,"datePublished":"","dateModified":""}}},"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":"{\"article\":{\"articleType\":\"BlogPosting\"},\"course\":{\"name\":\"\",\"description\":\"\",\"provider\":\"\"},\"faq\":{\"pages\":[]},\"product\":{\"reviews\":[]},\"recipe\":{\"ingredients\":[],\"instructions\":[],\"keywords\":[]},\"software\":{\"reviews\":[],\"operatingSystems\":[]},\"webPage\":{\"webPageType\":\"WebPage\"},\"blockGraphs\":[]}","pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"created":"2022-11-04 12:01:47","updated":"2025-12-04 07:59:50","ai":null,"seo_analyzer_scan_date":null},"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/posts\/77475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/comments?post=77475"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/posts\/77475\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/media\/77472"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/media?parent=77475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/categories?post=77475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/tags?post=77475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}