{"id":90381,"date":"2026-10-06T15:04:24","date_gmt":"2026-10-06T12:04:24","guid":{"rendered":"https:\/\/www.enka.com\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/"},"modified":"2026-10-06T15:04:24","modified_gmt":"2026-10-06T12:04:24","slug":"progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026","status":"publish","type":"post","link":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/","title":{"rendered":"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026"},"content":{"rendered":"<p style=\"text-align: justify;\"><div class=\"clearfix\" style=\"height: 20px\"><\/div>\n<p style=\"text-align: justify;\">ENKA makes progress at Hinkley Point C Nuclear Power Plant in England \u2014 one of the UK\u2019s major energy infrastructure projects.<\/p>\n<p style=\"text-align: justify;\">ENKA signed a contract with Arabelle Services Ltd. in 2021 for the prefabrication and erection of piping systems for the conventional power islands of two 1,600 MW units. In 2024, we secured an additional contract covering design verification, material procurement and thermal insulation installation for piping systems and equipment within the turbine hall.<\/p>\n<p style=\"text-align: justify;\">In 2025, Unit 1 preassembly commenced in May 2025, followed by permanent works in June.<\/p>\n<p style=\"text-align: justify;\">As of September 2026, progress on Unit 1 prefabrication and erection works stood at 27%, while Unit 2 prefabrication reached 74%.<\/p>\n<p style=\"text-align: justify;\">The power plant is expected to supply approximately 7% of the UK\u2019s electricity demand, providing reliable, zero-carbon power, strengthening energy security and supporting the country\u2019s transition to a low-carbon energy system.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ENKA makes progress at Hinkley Point C Nuclear Power Plant in England \u2014 one of the UK\u2019s major energy infrastructure projects. ENKA signed a contract with Arabelle Services Ltd. in 2021 for the prefabrication and erection of piping systems for the conventional power islands of two 1,600 MW units. In 2024, we secured an additional <a class=\"more-link\" href=\"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":26,"featured_media":90382,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[14164],"tags":[],"class_list":["post-90381","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-power-plants-ru"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.2 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marina Suer\"\/>\n\t<meta name=\"google-site-verification\" content=\"UQ-k7hcOVZluZene7_iGgI7iewEm4fFqYkW4KY9-n28\" \/>\n\t<meta name=\"p:domain_verify\" content=\"61890147e937e076e1c5dfdd6aeed81a\" \/>\n\t<meta name=\"yandex-verification\" content=\"5d2561526cb84137\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.2\" \/>\n\n\t\t<!-- Google tag (gtag.js) -->\n<script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-NQHTTC6MQB\"><\/script>\n<script>\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-NQHTTC6MQB');\n<\/script>\n\t\t<meta property=\"og:locale\" content=\"ru_RU\" \/>\n\t\t<meta property=\"og:site_name\" content=\"ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/\" \/>\n\t\t<meta property=\"fb:admins\" content=\"334532790084532\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-06T12:04:24+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-06T12:04:24+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/enkaconstruction\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@ENKA_Cons\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#article\",\"name\":\"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"headline\":\"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026\",\"author\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/marina-suer\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/for_web.jpg\",\"width\":1024,\"height\":580},\"datePublished\":\"2026-10-06T15:04:24+03:00\",\"dateModified\":\"2026-10-06T15:04:24+03:00\",\"inLanguage\":\"ru-RU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#webpage\"},\"articleSection\":\"\\u042d\\u043b\\u0435\\u043a\\u0442\\u0440\\u043e\\u0441\\u0442\\u0430\\u043d\\u0446\\u0438\\u0438, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/category\\\/power-plants-ru\\\/#listItem\",\"name\":\"\\u042d\\u043b\\u0435\\u043a\\u0442\\u0440\\u043e\\u0441\\u0442\\u0430\\u043d\\u0446\\u0438\\u0438\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/category\\\/power-plants-ru\\\/#listItem\",\"position\":2,\"name\":\"\\u042d\\u043b\\u0435\\u043a\\u0442\\u0440\\u043e\\u0441\\u0442\\u0430\\u043d\\u0446\\u0438\\u0438\",\"item\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/category\\\/power-plants-ru\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#listItem\",\"name\":\"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#listItem\",\"position\":3,\"name\":\"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/category\\\/power-plants-ru\\\/#listItem\",\"name\":\"\\u042d\\u043b\\u0435\\u043a\\u0442\\u0440\\u043e\\u0441\\u0442\\u0430\\u043d\\u0446\\u0438\\u0438\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#organization\",\"name\":\"ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"\\u041a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u044f \\u00ab\\u042d\\u041d\\u041a\\u0410\\u00bb \\u2013 \\u043a\\u0440\\u0443\\u043f\\u043d\\u0435\\u0439\\u0448\\u0430\\u044f \\u0441\\u0442\\u0440\\u043e\\u0438\\u0442\\u0435\\u043b\\u044c\\u043d\\u0430\\u044f \\u043a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u044f \\u0432 \\u0422\\u0443\\u0440\\u0446\\u0438\\u0438, \\u043a\\u043b\\u0430\\u0441\\u0441\\u0438\\u0444\\u0438\\u0446\\u0438\\u0440\\u043e\\u0432\\u0430\\u043d\\u043d\\u0430\\u044f \\u0436\\u0443\\u0440\\u043d\\u0430\\u043b\\u043e\\u043c \\u00ab\\u0418\\u043d\\u0436\\u0438\\u043d\\u0438\\u0440\\u0438\\u043d\\u0433 \\u041d\\u044c\\u044e\\u0441 \\u0420\\u0435\\u043a\\u043e\\u0440\\u0434\\u00bb (ENR) \\u043a\\u0430\\u043a \\u043e\\u0434\\u043d\\u0430 \\u0438\\u0437 \\u043b\\u0443\\u0447\\u0448\\u0438\\u0445 \\u043c\\u0435\\u0436\\u0434\\u0443\\u043d\\u0430\\u0440\\u043e\\u0434\\u043d\\u044b\\u0445 \\u0441\\u0442\\u0440\\u043e\\u0438\\u0442\\u0435\\u043b\\u044c\\u043d\\u044b\\u0445 \\u043a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u0439, \\u043d\\u0430\\u0447\\u0438\\u043d\\u0430\\u044f \\u0441 1982 \\u0433\\u043e\\u0434\\u0430.\",\"url\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/\",\"telephone\":\"+902123761000\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/enka-icon-112x112-1.png\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#organizationLogo\",\"width\":112,\"height\":112},\"image\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/enka_insaat_official\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCtdqyCnE1uZiCkl3Luedj6Q\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/enka\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/marina-suer\\\/#author\",\"url\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/marina-suer\\\/\",\"name\":\"Marina Suer\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#authorImage\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/litespeed\\\/avatar\\\/50188eb6d3885a73938aa5e877d3ae80.jpg?ver=1790951428\",\"width\":96,\"height\":96,\"caption\":\"Marina Suer\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#webpage\",\"url\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/\",\"name\":\"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"inLanguage\":\"ru-RU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/marina-suer\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/author\\\/marina-suer\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/for_web.jpg\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#mainImage\",\"width\":1024,\"height\":580},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\\\/#mainImage\"},\"datePublished\":\"2026-10-06T15:04:24+03:00\",\"dateModified\":\"2026-10-06T15:04:24+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#website\",\"url\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/\",\"name\":\"ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"\\u041a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u044f \\u00ab\\u042d\\u041d\\u041a\\u0410\\u00bb \\u2013 \\u043a\\u0440\\u0443\\u043f\\u043d\\u0435\\u0439\\u0448\\u0430\\u044f \\u0441\\u0442\\u0440\\u043e\\u0438\\u0442\\u0435\\u043b\\u044c\\u043d\\u0430\\u044f \\u043a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u044f \\u0432 \\u0422\\u0443\\u0440\\u0446\\u0438\\u0438, \\u043a\\u043b\\u0430\\u0441\\u0441\\u0438\\u0444\\u0438\\u0446\\u0438\\u0440\\u043e\\u0432\\u0430\\u043d\\u043d\\u0430\\u044f \\u0436\\u0443\\u0440\\u043d\\u0430\\u043b\\u043e\\u043c \\u00ab\\u0418\\u043d\\u0436\\u0438\\u043d\\u0438\\u0440\\u0438\\u043d\\u0433 \\u041d\\u044c\\u044e\\u0441 \\u0420\\u0435\\u043a\\u043e\\u0440\\u0434\\u00bb (ENR) \\u043a\\u0430\\u043a \\u043e\\u0434\\u043d\\u0430 \\u0438\\u0437 \\u043b\\u0443\\u0447\\u0448\\u0438\\u0445 \\u043c\\u0435\\u0436\\u0434\\u0443\\u043d\\u0430\\u0440\\u043e\\u0434\\u043d\\u044b\\u0445 \\u0441\\u0442\\u0440\\u043e\\u0438\\u0442\\u0435\\u043b\\u044c\\u043d\\u044b\\u0445 \\u043a\\u043e\\u043c\\u043f\\u0430\\u043d\\u0438\\u0439, \\u043d\\u0430\\u0447\\u0438\\u043d\\u0430\\u044f \\u0441 1982 \\u0433\\u043e\\u0434\\u0430.\",\"inLanguage\":\"ru-RU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/ru\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \u0130n\u015faat ve Sanayi A.\u015e.<\/title>\n\n","aioseo_head_json":{"title":"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"","canonical_url":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"UQ-k7hcOVZluZene7_iGgI7iewEm4fFqYkW4KY9-n28","p:domain_verify":"61890147e937e076e1c5dfdd6aeed81a","yandex-verification":"5d2561526cb84137","miscellaneous":"&lt;!-- Google tag (gtag.js) --&gt;\n&lt;script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-NQHTTC6MQB\"&gt;&lt;\/script&gt;\n&lt;script&gt;\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-NQHTTC6MQB');\n&lt;\/script&gt;"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#article","name":"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","headline":"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026","author":{"@id":"https:\/\/www.enka.com\/ru\/author\/marina-suer\/#author"},"publisher":{"@id":"https:\/\/www.enka.com\/ru\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2026\/10\/for_web.jpg","width":1024,"height":580},"datePublished":"2026-10-06T15:04:24+03:00","dateModified":"2026-10-06T15:04:24+03:00","inLanguage":"ru-RU","mainEntityOfPage":{"@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#webpage"},"isPartOf":{"@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#webpage"},"articleSection":"\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u0438, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/#listItem","position":1,"name":"Home","item":"https:\/\/www.enka.com\/ru\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/category\/power-plants-ru\/#listItem","name":"\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u0438"}},{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/category\/power-plants-ru\/#listItem","position":2,"name":"\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u0438","item":"https:\/\/www.enka.com\/ru\/category\/power-plants-ru\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#listItem","name":"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#listItem","position":3,"name":"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026","previousItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/ru\/category\/power-plants-ru\/#listItem","name":"\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u0441\u0442\u0430\u043d\u0446\u0438\u0438"}}]},{"@type":"Organization","@id":"https:\/\/www.enka.com\/ru\/#organization","name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"\u041a\u043e\u043c\u043f\u0430\u043d\u0438\u044f \u00ab\u042d\u041d\u041a\u0410\u00bb \u2013 \u043a\u0440\u0443\u043f\u043d\u0435\u0439\u0448\u0430\u044f \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u043d\u0430\u044f \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u044f \u0432 \u0422\u0443\u0440\u0446\u0438\u0438, \u043a\u043b\u0430\u0441\u0441\u0438\u0444\u0438\u0446\u0438\u0440\u043e\u0432\u0430\u043d\u043d\u0430\u044f \u0436\u0443\u0440\u043d\u0430\u043b\u043e\u043c \u00ab\u0418\u043d\u0436\u0438\u043d\u0438\u0440\u0438\u043d\u0433 \u041d\u044c\u044e\u0441 \u0420\u0435\u043a\u043e\u0440\u0434\u00bb (ENR) \u043a\u0430\u043a \u043e\u0434\u043d\u0430 \u0438\u0437 \u043b\u0443\u0447\u0448\u0438\u0445 \u043c\u0435\u0436\u0434\u0443\u043d\u0430\u0440\u043e\u0434\u043d\u044b\u0445 \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u043d\u044b\u0445 \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u0439, \u043d\u0430\u0447\u0438\u043d\u0430\u044f \u0441 1982 \u0433\u043e\u0434\u0430.","url":"https:\/\/www.enka.com\/ru\/","telephone":"+902123761000","logo":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2015\/07\/enka-icon-112x112-1.png","@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#organizationLogo","width":112,"height":112},"image":{"@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#organizationLogo"},"sameAs":["https:\/\/www.instagram.com\/enka_insaat_official\/","https:\/\/www.youtube.com\/channel\/UCtdqyCnE1uZiCkl3Luedj6Q","https:\/\/www.linkedin.com\/company\/enka"]},{"@type":"Person","@id":"https:\/\/www.enka.com\/ru\/author\/marina-suer\/#author","url":"https:\/\/www.enka.com\/ru\/author\/marina-suer\/","name":"Marina Suer","image":{"@type":"ImageObject","@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#authorImage","url":"https:\/\/www.enka.com\/wp-content\/litespeed\/avatar\/50188eb6d3885a73938aa5e877d3ae80.jpg?ver=1790951428","width":96,"height":96,"caption":"Marina Suer"}},{"@type":"WebPage","@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#webpage","url":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/","name":"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","inLanguage":"ru-RU","isPartOf":{"@id":"https:\/\/www.enka.com\/ru\/#website"},"breadcrumb":{"@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#breadcrumblist"},"author":{"@id":"https:\/\/www.enka.com\/ru\/author\/marina-suer\/#author"},"creator":{"@id":"https:\/\/www.enka.com\/ru\/author\/marina-suer\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2026\/10\/for_web.jpg","@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#mainImage","width":1024,"height":580},"primaryImageOfPage":{"@id":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/#mainImage"},"datePublished":"2026-10-06T15:04:24+03:00","dateModified":"2026-10-06T15:04:24+03:00"},{"@type":"WebSite","@id":"https:\/\/www.enka.com\/ru\/#website","url":"https:\/\/www.enka.com\/ru\/","name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"\u041a\u043e\u043c\u043f\u0430\u043d\u0438\u044f \u00ab\u042d\u041d\u041a\u0410\u00bb \u2013 \u043a\u0440\u0443\u043f\u043d\u0435\u0439\u0448\u0430\u044f \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u043d\u0430\u044f \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u044f \u0432 \u0422\u0443\u0440\u0446\u0438\u0438, \u043a\u043b\u0430\u0441\u0441\u0438\u0444\u0438\u0446\u0438\u0440\u043e\u0432\u0430\u043d\u043d\u0430\u044f \u0436\u0443\u0440\u043d\u0430\u043b\u043e\u043c \u00ab\u0418\u043d\u0436\u0438\u043d\u0438\u0440\u0438\u043d\u0433 \u041d\u044c\u044e\u0441 \u0420\u0435\u043a\u043e\u0440\u0434\u00bb (ENR) \u043a\u0430\u043a \u043e\u0434\u043d\u0430 \u0438\u0437 \u043b\u0443\u0447\u0448\u0438\u0445 \u043c\u0435\u0436\u0434\u0443\u043d\u0430\u0440\u043e\u0434\u043d\u044b\u0445 \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u043d\u044b\u0445 \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u0439, \u043d\u0430\u0447\u0438\u043d\u0430\u044f \u0441 1982 \u0433\u043e\u0434\u0430.","inLanguage":"ru-RU","publisher":{"@id":"https:\/\/www.enka.com\/ru\/#organization"}}]},"og:locale":"ru_RU","og:site_name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","og:type":"article","og:title":"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","og:url":"https:\/\/www.enka.com\/ru\/progress-of-hinkley-point-c-nuclear-power-plant-project-in-the-uk-as-of-september-2026\/","fb:admins":"334532790084532","article:published_time":"2026-10-06T12:04:24+00:00","article:modified_time":"2026-10-06T12:04:24+00:00","article:publisher":"https:\/\/www.facebook.com\/enkaconstruction\/","twitter:card":"summary_large_image","twitter:site":"@ENKA_Cons","twitter:title":"Progress of Hinkley Point C Nuclear Power Plant Project in the UK as of September 2026 | ENKA \u0130n\u015faat ve Sanayi A.\u015e."},"aioseo_meta_data":{"post_id":"90381","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"created":"2026-10-06 12:09:50","updated":"2026-10-06 12:56:06","ai":null,"seo_analyzer_scan_date":"2026-10-06 12:10:55","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/posts\/90381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/comments?post=90381"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/posts\/90381\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/media\/90382"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/media?parent=90381"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/categories?post=90381"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/ru\/wp-json\/wp\/v2\/tags?post=90381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}