{"id":13928,"date":"2023-11-08T17:10:00","date_gmt":"2023-11-08T14:10:00","guid":{"rendered":"https:\/\/www.enka.com\/sustainability\/?p=13928"},"modified":"2023-11-08T17:10:00","modified_gmt":"2023-11-08T14:10:00","slug":"morava-corridor-motorway","status":"publish","type":"post","link":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/","title":{"rendered":"Morava Corridor Motorway"},"content":{"rendered":"<p style=\"text-align: justify;\"><div class=\"clearfix\" style=\"height: 10px\"><\/div>As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate,\u00a0is progressing swiftly along its entire alignment.<\/p>\n<p style=\"text-align: justify;\">Currently, over 3,700 employees are diligently working on a wide range of works.<\/p>\n<p style=\"text-align: justify;\">A total of 38.3 million m<sup>3<\/sup>\u00a0of excavation, 15.2 million m<sup>3<\/sup>\u00a0of fill, 490 thousand m<sup>3<\/sup>\u00a0of concreting, 480 thousand m<sup>3<\/sup> of subbase installation and 300 thousand tons of asphalt installation works have been completed.<\/p>\n<p style=\"text-align: justify;\">The project&#8217;s target is to add another 11 kilometers to Sector 1 by the end of 2023, extending the length of the opened section to 27.5 kilometers.<\/p>\n<p style=\"text-align: justify;\">In Sector 2 and Sector 3, progress is being made concurrently on earthworks, drainage, and structures, with paving works also commencing in Sector 2.<\/p>\n<p style=\"text-align: justify;\">The Bechtel-ENKA JV has ensured the safety and quality of the project by providing HSE and Quality training to all project personnel, adhering to the requirements of various disciplines.<\/p>\n<p style=\"text-align: justify;\">A total of 7,213,281 person-hours and 217 days had been worked without any lost time incident (LTI) on the project as the end of October 2023.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate,\u00a0is progressing swiftly along its entire alignment. Currently, over 3,700 employees are diligently working on a wide range of works. A total of 38.3 million m3\u00a0of excavation, 15.2 million <a class=\"more-link\" href=\"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":2,"featured_media":13929,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","inline_featured_image":false,"footnotes":""},"categories":[2541],"tags":[],"class_list":["post-13928","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-our-business-and-principles"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate, is progressing swiftly along its entire alignment. Currently, over 3,700 employees are diligently working on a wide range of works. A total of 38.3 million m3 of excavation, 15.2 million\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marina Suer\"\/>\n\t<meta name=\"google-site-verification\" content=\"UQ-k7hcOVZluZene7_iGgI7iewEm4fFqYkW4KY9-n28\" \/>\n\t<meta name=\"keywords\" content=\"our business and principles\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\n\t\t<!-- Google tag (gtag.js) -->\n<script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-NQHTTC6MQB\"><\/script>\n<script>\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-NQHTTC6MQB');\n<\/script>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Morava Corridor Motorway | ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta property=\"og:description\" content=\"As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate, is progressing swiftly along its entire alignment. Currently, over 3,700 employees are diligently working on a wide range of works. A total of 38.3 million m3 of excavation, 15.2 million\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.enka.com\/sustainability\/wp-content\/uploads\/2023\/11\/for_web1.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.enka.com\/sustainability\/wp-content\/uploads\/2023\/11\/for_web1.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t\t<meta property=\"og:image:height\" content=\"580\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-11-08T14:10:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-11-08T14:10:00+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/enkaconstruction\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@ENKA_Cons\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Morava Corridor Motorway | ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate, is progressing swiftly along its entire alignment. Currently, over 3,700 employees are diligently working on a wide range of works. A total of 38.3 million m3 of excavation, 15.2 million\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.enka.com\/sustainability\/wp-content\/uploads\/2023\/11\/for_web1.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#article\",\"name\":\"Morava Corridor Motorway | ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"headline\":\"Morava Corridor Motorway\",\"author\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/author\\\/marina-suer_245368_-2-2-2-2-2-2\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/for_web1.jpg\",\"width\":1024,\"height\":580},\"datePublished\":\"2023-11-08T17:10:00+03:00\",\"dateModified\":\"2023-11-08T17:10:00+03:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#webpage\"},\"articleSection\":\"Our Business and Principles, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.enka.com\\\/sustainability\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/category\\\/our-strategy\\\/#listItem\",\"name\":\"Our Strategy\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/category\\\/our-strategy\\\/#listItem\",\"position\":2,\"name\":\"Our Strategy\",\"item\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/category\\\/our-strategy\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/category\\\/our-strategy\\\/our-business-and-principles\\\/#listItem\",\"name\":\"Our Business and Principles\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/category\\\/our-strategy\\\/our-business-and-principles\\\/#listItem\",\"position\":3,\"name\":\"Our Business and Principles\",\"item\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/category\\\/our-strategy\\\/our-business-and-principles\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#listItem\",\"name\":\"Morava Corridor Motorway\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/category\\\/our-strategy\\\/#listItem\",\"name\":\"Our Strategy\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#listItem\",\"position\":4,\"name\":\"Morava Corridor Motorway\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/category\\\/our-strategy\\\/our-business-and-principles\\\/#listItem\",\"name\":\"Our Business and Principles\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/#organization\",\"name\":\"ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"Engineering for a sustainable future\",\"url\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/\",\"telephone\":\"+902123761000\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/enka-icon-112x112-1.png\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/enka_insaat_official\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCtdqyCnE1uZiCkl3Luedj6Q\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/enka\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/author\\\/marina-suer_245368_-2-2-2-2-2-2\\\/#author\",\"url\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/author\\\/marina-suer_245368_-2-2-2-2-2-2\\\/\",\"name\":\"Marina Suer\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#authorImage\",\"url\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/wp-content\\\/litespeed\\\/avatar\\\/50188eb6d3885a73938aa5e877d3ae80.jpg?ver=1788354518\",\"width\":96,\"height\":96,\"caption\":\"Marina Suer\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#webpage\",\"url\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/\",\"name\":\"Morava Corridor Motorway | ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate, is progressing swiftly along its entire alignment. Currently, over 3,700 employees are diligently working on a wide range of works. A total of 38.3 million m3 of excavation, 15.2 million\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/author\\\/marina-suer_245368_-2-2-2-2-2-2\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/author\\\/marina-suer_245368_-2-2-2-2-2-2\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/for_web1.jpg\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#mainImage\",\"width\":1024,\"height\":580},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/morava-corridor-motorway\\\/#mainImage\"},\"datePublished\":\"2023-11-08T17:10:00+03:00\",\"dateModified\":\"2023-11-08T17:10:00+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/#website\",\"url\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/\",\"name\":\"ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"Engineering for a sustainable future\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/sustainability\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Morava Corridor Motorway | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate, is progressing swiftly along its entire alignment. Currently, over 3,700 employees are diligently working on a wide range of works. A total of 38.3 million m3 of excavation, 15.2 million","canonical_url":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/","robots":"max-image-preview:large","keywords":"our business and principles","webmasterTools":{"google-site-verification":"UQ-k7hcOVZluZene7_iGgI7iewEm4fFqYkW4KY9-n28","miscellaneous":"&lt;!-- Google tag (gtag.js) --&gt;\n&lt;script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-NQHTTC6MQB\"&gt;&lt;\/script&gt;\n&lt;script&gt;\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-NQHTTC6MQB');\n&lt;\/script&gt;"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#article","name":"Morava Corridor Motorway | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","headline":"Morava Corridor Motorway","author":{"@id":"https:\/\/www.enka.com\/sustainability\/author\/marina-suer_245368_-2-2-2-2-2-2\/#author"},"publisher":{"@id":"https:\/\/www.enka.com\/sustainability\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/sustainability\/wp-content\/uploads\/2023\/11\/for_web1.jpg","width":1024,"height":580},"datePublished":"2023-11-08T17:10:00+03:00","dateModified":"2023-11-08T17:10:00+03:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#webpage"},"isPartOf":{"@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#webpage"},"articleSection":"Our Business and Principles, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability#listItem","position":1,"name":"Home","item":"https:\/\/www.enka.com\/sustainability","nextItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability\/category\/our-strategy\/#listItem","name":"Our Strategy"}},{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability\/category\/our-strategy\/#listItem","position":2,"name":"Our Strategy","item":"https:\/\/www.enka.com\/sustainability\/category\/our-strategy\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability\/category\/our-strategy\/our-business-and-principles\/#listItem","name":"Our Business and Principles"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability\/category\/our-strategy\/our-business-and-principles\/#listItem","position":3,"name":"Our Business and Principles","item":"https:\/\/www.enka.com\/sustainability\/category\/our-strategy\/our-business-and-principles\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#listItem","name":"Morava Corridor Motorway"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability\/category\/our-strategy\/#listItem","name":"Our Strategy"}},{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#listItem","position":4,"name":"Morava Corridor Motorway","previousItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/sustainability\/category\/our-strategy\/our-business-and-principles\/#listItem","name":"Our Business and Principles"}}]},{"@type":"Organization","@id":"https:\/\/www.enka.com\/sustainability\/#organization","name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"Engineering for a sustainable future","url":"https:\/\/www.enka.com\/sustainability\/","telephone":"+902123761000","logo":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2015\/07\/enka-icon-112x112-1.png","@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#organizationLogo"},"image":{"@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#organizationLogo"},"sameAs":["https:\/\/www.instagram.com\/enka_insaat_official\/","https:\/\/www.youtube.com\/channel\/UCtdqyCnE1uZiCkl3Luedj6Q","https:\/\/www.linkedin.com\/company\/enka"]},{"@type":"Person","@id":"https:\/\/www.enka.com\/sustainability\/author\/marina-suer_245368_-2-2-2-2-2-2\/#author","url":"https:\/\/www.enka.com\/sustainability\/author\/marina-suer_245368_-2-2-2-2-2-2\/","name":"Marina Suer","image":{"@type":"ImageObject","@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#authorImage","url":"https:\/\/www.enka.com\/sustainability\/wp-content\/litespeed\/avatar\/50188eb6d3885a73938aa5e877d3ae80.jpg?ver=1788354518","width":96,"height":96,"caption":"Marina Suer"}},{"@type":"WebPage","@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#webpage","url":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/","name":"Morava Corridor Motorway | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate, is progressing swiftly along its entire alignment. Currently, over 3,700 employees are diligently working on a wide range of works. A total of 38.3 million m3 of excavation, 15.2 million","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.enka.com\/sustainability\/#website"},"breadcrumb":{"@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#breadcrumblist"},"author":{"@id":"https:\/\/www.enka.com\/sustainability\/author\/marina-suer_245368_-2-2-2-2-2-2\/#author"},"creator":{"@id":"https:\/\/www.enka.com\/sustainability\/author\/marina-suer_245368_-2-2-2-2-2-2\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/sustainability\/wp-content\/uploads\/2023\/11\/for_web1.jpg","@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#mainImage","width":1024,"height":580},"primaryImageOfPage":{"@id":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/#mainImage"},"datePublished":"2023-11-08T17:10:00+03:00","dateModified":"2023-11-08T17:10:00+03:00"},{"@type":"WebSite","@id":"https:\/\/www.enka.com\/sustainability\/#website","url":"https:\/\/www.enka.com\/sustainability\/","name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"Engineering for a sustainable future","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.enka.com\/sustainability\/#organization"}}]},"og:locale":"en_US","og:site_name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","og:type":"article","og:title":"Morava Corridor Motorway | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","og:description":"As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate, is progressing swiftly along its entire alignment. Currently, over 3,700 employees are diligently working on a wide range of works. A total of 38.3 million m3 of excavation, 15.2 million","og:url":"https:\/\/www.enka.com\/sustainability\/morava-corridor-motorway\/","og:image":"https:\/\/www.enka.com\/sustainability\/wp-content\/uploads\/2023\/11\/for_web1.jpg","og:image:secure_url":"https:\/\/www.enka.com\/sustainability\/wp-content\/uploads\/2023\/11\/for_web1.jpg","og:image:width":1024,"og:image:height":580,"article:published_time":"2023-11-08T14:10:00+00:00","article:modified_time":"2023-11-08T14:10:00+00:00","article:publisher":"https:\/\/www.facebook.com\/enkaconstruction","twitter:card":"summary","twitter:site":"@ENKA_Cons","twitter:title":"Morava Corridor Motorway | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","twitter:description":"As of November 2023, Morava Corridor Motorway Project of ENKA-Bechtel JV located in the West Morava Region of Serbia with 112 km length from Preljina to Pojate, is progressing swiftly along its entire alignment. Currently, over 3,700 employees are diligently working on a wide range of works. A total of 38.3 million m3 of excavation, 15.2 million","twitter:image":"https:\/\/www.enka.com\/sustainability\/wp-content\/uploads\/2023\/11\/for_web1.jpg"},"aioseo_meta_data":{"post_id":"13928","title":null,"description":"#post_excerpt","keywords":[],"keyphrases":{"focus":[],"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"open_ai":"{\"title\":{\"suggestions\":[],\"usage\":0},\"description\":{\"suggestions\":[],\"usage\":0}}","ai":null,"created":"2023-11-08 14:07:56","updated":"2026-08-26 14:03:23","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/posts\/13928","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/comments?post=13928"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/posts\/13928\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/media\/13929"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/media?parent=13928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/categories?post=13928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/sustainability\/wp-json\/wp\/v2\/tags?post=13928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}