{"id":25987,"date":"2015-12-25T10:02:47","date_gmt":"2015-12-25T08:02:47","guid":{"rendered":"http:\/\/172.30.28.12\/en\/tr\/najybia-power-plant-project\/"},"modified":"2020-07-28T11:26:24","modified_gmt":"2020-07-28T08:26:24","slug":"najybia-elektrik-santrali-projesi","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/najybia-elektrik-santrali-projesi\/","title":{"rendered":"Najybia Elektrik Santrali Projesi"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 20px\"><\/div>\n<p>ENKA, Najybia Elektrik Santrali Projesini kay\u0131p zaman olay\u0131 meydana gelmeden 1.0 milyon adam-saatle tamamlad\u0131.<\/p>\n<p>Basra yak\u0131nlar\u0131nda bulunan proje, Irak Cumhuriyeti Elektrik Bakanl\u0131\u011f\u0131 taraf\u0131ndan, 25 y\u0131l s\u00fcren sava\u015f ve yat\u0131r\u0131ms\u0131z d\u00f6nemden sonra \u00fclkede h\u0131zla artan talebi kar\u015f\u0131lamak i\u00e7in elektrik \u00fcretim kapasitesinin art\u0131r\u0131lmas\u0131 amac\u0131yla geli\u015ftirilen ve uygulanan bir ana plan\u0131n par\u00e7as\u0131d\u0131r. \u201cMega Anla\u015fma &#8230; Projelerinden\u201d biri olan Najybia 4&#215;125 MW Gaz T\u00fcrbini Elektrik Santrali S\u00f6zle\u015fmesi, Irak Elektrik Bakanl\u0131\u011f\u0131 ile Ocak 2012\u2019de imzaland\u0131.<\/p>\n<p>Proje; A\u011f\u0131r Yak\u0131t (HFO), Do\u011falgaz ve Hafif Distilat Ya\u011f (LDO) olmak \u00fczere \u00fc\u00e7 t\u00fcr yak\u0131tla basit \u00e7evrimde \u00e7al\u0131\u015ft\u0131r\u0131lacak 4&#215;125 MW Elektrik Santralinin m\u00fchendislik, sat\u0131n alma, yap\u0131m, i\u015fletmeye alma ve ilk \u00e7al\u0131\u015ft\u0131rma i\u015flerinden olu\u015fmakta ve Yanma T\u00fcrbinli Jenerat\u00f6r (CTG) \u00fcnitelerinin g\u00fcvenli ve verimli bir \u015fekilde \u00e7al\u0131\u015fmas\u0131n\u0131 sa\u011flamaya y\u00f6nelik t\u00fcm Yard\u0131mc\u0131 Santral Sistemlerini (BoP) de kapsamaktad\u0131r. Santralin her iki akaryak\u0131t (HFO ve LDO) i\u00e7in 5 g\u00fcnl\u00fck depolama kapasitesi bulunmaktad\u0131r.<\/p>\n<p style=\"text-align: justify;\">ENKA ayr\u0131ca santrali i\u015fletecek ve bak\u0131m\u0131n\u0131 yapacak olan \u0130\u015fletme ve Bak\u0131m (O&amp;M) personeli i\u00e7in e\u011fitim de vermi\u015ftir.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ENKA, Najybia Elektrik Santrali Projesini kay\u0131p zaman olay\u0131 meydana gelmeden 1.0 milyon adam-saatle tamamlad\u0131. Basra yak\u0131nlar\u0131nda bulunan proje, Irak Cumhuriyeti Elektrik Bakanl\u0131\u011f\u0131 taraf\u0131ndan, 25 y\u0131l s\u00fcren sava\u015f ve yat\u0131r\u0131ms\u0131z d\u00f6nemden sonra \u00fclkede h\u0131zla artan talebi kar\u015f\u0131lamak i\u00e7in elektrik \u00fcretim kapasitesinin art\u0131r\u0131lmas\u0131 amac\u0131yla geli\u015ftirilen ve uygulanan bir ana plan\u0131n par\u00e7as\u0131d\u0131r. \u201cMega Anla\u015fma &#8230; Projelerinden\u201d biri olan <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/najybia-elektrik-santrali-projesi\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":25,"featured_media":23865,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":{"_acf_changed":false,"footnotes":""},"categories":[623],"tags":[],"class_list":["post-25987","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","category-enerji-santralleri","post_format-post-format-image"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/25987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=25987"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/25987\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/23865"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=25987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=25987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=25987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}