{"id":26117,"date":"2015-10-15T13:22:40","date_gmt":"2015-10-15T11:22:40","guid":{"rendered":"http:\/\/172.30.28.12\/en\/tr\/the-baghdad-electrical-power-station\/"},"modified":"2020-06-26T09:54:50","modified_gmt":"2020-06-26T06:54:50","slug":"bagdat-elektrik-santrali","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/bagdat-elektrik-santrali\/","title":{"rendered":"Ba\u011fdat Elektrik Santrali"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 20px\"><\/div>\n<p>Ba\u011fdat Elektrik Santrali (Besmaya) projesi, ENKA \u0130n\u015faat A.\u015e.\u2019nin \u201canahtar teslimi\u201d esas\u0131na g\u00f6re tek ba\u015f\u0131na imzalad\u0131\u011f\u0131 bir EPC s\u00f6zle\u015fmesi olup; santralin m\u00fchendislik, sat\u0131n alma, montaj ve in\u015faat, ara ba\u011flant\u0131, \u00f6n i\u015fletmeye alma, i\u015fletmeye alma ve ilk \u00e7al\u0131\u015ft\u0131rma ile performans testlerini kapsamaktad\u0131r. ENKA ve Mass Energy Group Holding Ltd. aras\u0131nda Eyl\u00fcl 2014\u2019te imzalanan s\u00f6zle\u015fmenin planlanan tamamlama tarihi Ekim 2017.<\/p>\n<p>Santral, Ba\u011fdat\u2019\u0131n 25 km g\u00fcneydo\u011fusunda bulunuyor. \u0130ki bloklu 2x2x1 kombine \u00e7evrim (1.500 MW) olarak tasarlanan santral, 4 bloklu bir elektrik santraline (3.000 MW) de d\u00f6n\u00fc\u015ft\u00fcr\u00fclebilme se\u00e7ene\u011fine sahip.<\/p>\n<p>Proje, iki a\u015famada ger\u00e7ekle\u015ftirilecek olup; ilk a\u015fama olan Basit \u00c7evrim i\u015fletme 26 ay i\u00e7inde tamamlan\u0131rken, ikinci a\u015fama olan Kombine \u00c7evrim i\u015fletme 37 ay i\u00e7inde tamamlanacakt\u0131r.<\/p>\n<p>Tesisin basit \u00e7evrim k\u0131sm\u0131 d\u00f6rt (4) GE 9F 3-serisi Gaz T\u00fcrbini, yard\u0131mc\u0131 tesisler ve yard\u0131mc\u0131 santral sistemi ekipman\u0131ndan olu\u015fmaktad\u0131r. Santralin kombine \u00e7evrimli k\u0131sm\u0131; g\u00fcvenli, g\u00fcvenilir ve etkin bir kombine \u00e7evrim elektrik \u00fcretim tesisi kurulabilmesi amac\u0131yla y\u00fczey tipi yo\u011funla\u015ft\u0131r\u0131c\u0131lar dahil olmak \u00fczere d\u00f6rt (4) Is\u0131 Geri Kazan\u0131ml\u0131 Buhar Jenerat\u00f6r\u00fc (HRSG), iki (2) nominal oranl\u0131 250 MW buhar t\u00fcrbini jenerat\u00f6r\u00fc (STG), iki (2) ya\u015f tip mekanik draft so\u011futma kulesi ve b\u00fct\u00fcn gerekli ekipman ve sistemlerden olu\u015facakt\u0131r.<\/p>\n<p>Ekim 2015 sonu itibariyle basit \u00e7evrim kapsam\u0131na giren m\u00fchendislik ve PO yerle\u015ftirme i\u015flerinin \u00e7o\u011fu tamamlanm\u0131\u015f olup, kombine \u00e7evrim kapsam\u0131na giren m\u00fchendislik ve sat\u0131n alma i\u015fleri ile basit \u00e7evrimin geri kalan k\u00fc\u00e7\u00fck bir k\u0131sm\u0131na ait i\u015fler devam etmektedir. \u0130n\u015faat i\u015fleri devam ederken, b\u00fcy\u00fck \u00f6l\u00e7ekli mekanik montaj i\u015fleri de ba\u015flam\u0131\u015ft\u0131r. Blok 1 ve 2 t\u00fcrbin binalar\u0131, LDO depolama tanklar\u0131, GTG ve STG kaideleri, HRSG temelleri, U\/G tesisleri ve Blok 1 t\u00fcrbin binas\u0131 yap\u0131sal \u00e7elik montaj i\u015flerinde ilerleme kaydedilmi\u015ftir. GT ve jenerat\u00f6r \u00fcniteleri \u015fantiyeye getirilmi\u015f ve mekanik i\u015flerde kaydedilen \u00f6nemli bir geli\u015fme olarak GT-1 temel \u00fczerine yerle\u015ftirilmi\u015ftir.<\/p>\n<p style=\"text-align: justify;\">Toplam 12.500 m<sup>3<\/sup> beton d\u00f6k\u00fclm\u00fc\u015f, 515 ton yap\u0131sal \u00e7eli\u011fin montaj\u0131 yap\u0131lm\u0131\u015ft\u0131r. Genel EPC ilerlemesi, Ekim 2015 itibariyle yakla\u015f\u0131k %45\u2019tir.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ba\u011fdat Elektrik Santrali (Besmaya) projesi, ENKA \u0130n\u015faat A.\u015e.\u2019nin \u201canahtar teslimi\u201d esas\u0131na g\u00f6re tek ba\u015f\u0131na imzalad\u0131\u011f\u0131 bir EPC s\u00f6zle\u015fmesi olup; santralin m\u00fchendislik, sat\u0131n alma, montaj ve in\u015faat, ara ba\u011flant\u0131, \u00f6n i\u015fletmeye alma, i\u015fletmeye alma ve ilk \u00e7al\u0131\u015ft\u0131rma ile performans testlerini kapsamaktad\u0131r. ENKA ve Mass Energy Group Holding Ltd. aras\u0131nda Eyl\u00fcl 2014\u2019te imzalanan s\u00f6zle\u015fmenin planlanan tamamlama tarihi <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/bagdat-elektrik-santrali\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":25,"featured_media":21725,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":{"_acf_changed":false,"footnotes":""},"categories":[623],"tags":[],"class_list":["post-26117","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","category-enerji-santralleri","post_format-post-format-image"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/26117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=26117"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/26117\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/21725"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=26117"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=26117"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=26117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}