{"id":26123,"date":"2011-06-30T12:20:20","date_gmt":"2011-06-30T10:20:20","guid":{"rendered":"http:\/\/172.30.28.12\/en\/tr\/yajva-state-district-power-plant-has-been-succesfully-completed-with-1-950-000-man-hour-wo-lti\/"},"modified":"2020-09-02T13:54:53","modified_gmt":"2020-09-02T10:54:53","slug":"yajva-devlet-ilce-elektrik-santrali-kzo-olmadan-1-950-000-adam-saat-ile-basarili-bir-sekilde-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/yajva-devlet-ilce-elektrik-santrali-kzo-olmadan-1-950-000-adam-saat-ile-basarili-bir-sekilde-tamamlandi\/","title":{"rendered":"Yajva Devlet \u0130l\u00e7e Elektrik Santrali, KZO olmadan 1.950.000 adam-saat ile ba\u015far\u0131l\u0131 bir \u015fekilde tamamland\u0131"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 20px\"><\/div>\n<p>ENKA, Temmuz 2008\u2019de Rusya\u2019n\u0131n Perm B\u00f6lgesindeki Yajve \u0130l\u00e7esinde bulunan 411 MW Tek \u015eaftl\u0131 Kombine \u00c7evrimli Elektrik Santralinin tasar\u0131m\u0131, temini ve yap\u0131m\u0131 i\u00e7in EPC Y\u00fcklenicisi oldu. Anahtar teslimi g\u00f6t\u00fcr\u00fc bedel esas\u0131na g\u00f6re imzalanan s\u00f6zle\u015fme; ruhsat, m\u00fchendislik, tasar\u0131m, sat\u0131n alma, in\u015faat, ilk \u00e7al\u0131\u015ft\u0131rma, test ve i\u015fletmeye alma i\u015flerinin yan\u0131s\u0131ra santrali i\u015fletecek personelin e\u011fitimini de kapsamaktad\u0131r.<\/p>\n<p style=\"text-align: justify;\">Proje, KZO olmadan 1.950.000 adam-saatte ba\u015far\u0131l\u0131 bir \u015fekilde tamamlanm\u0131\u015ft\u0131r.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ENKA, Temmuz 2008\u2019de Rusya\u2019n\u0131n Perm B\u00f6lgesindeki Yajve \u0130l\u00e7esinde bulunan 411 MW Tek \u015eaftl\u0131 Kombine \u00c7evrimli Elektrik Santralinin tasar\u0131m\u0131, temini ve yap\u0131m\u0131 i\u00e7in EPC Y\u00fcklenicisi oldu. Anahtar teslimi g\u00f6t\u00fcr\u00fc bedel esas\u0131na g\u00f6re imzalanan s\u00f6zle\u015fme; ruhsat, m\u00fchendislik, tasar\u0131m, sat\u0131n alma, in\u015faat, ilk \u00e7al\u0131\u015ft\u0131rma, test ve i\u015fletmeye alma i\u015flerinin yan\u0131s\u0131ra santrali i\u015fletecek personelin e\u011fitimini de kapsamaktad\u0131r. Proje, KZO <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/yajva-devlet-ilce-elektrik-santrali-kzo-olmadan-1-950-000-adam-saat-ile-basarili-bir-sekilde-tamamlandi\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":25,"featured_media":20214,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":{"_acf_changed":false,"footnotes":""},"categories":[627],"tags":[],"class_list":["post-26123","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","category-cevre-guvenlik-saglik","post_format-post-format-image"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/26123","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=26123"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/26123\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/20214"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=26123"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=26123"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=26123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}