{"id":44996,"date":"2016-12-23T15:03:03","date_gmt":"2016-12-23T13:03:03","guid":{"rendered":"http:\/\/www.enka.com\/tr\/?p=44996"},"modified":"2020-06-04T22:50:28","modified_gmt":"2020-06-04T19:50:28","slug":"bagdat-besmaya-1500-mw-kombine-cevrim-elektrik-santralinde-ilk-gtg-11-ateslenmesi","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/bagdat-besmaya-1500-mw-kombine-cevrim-elektrik-santralinde-ilk-gtg-11-ateslenmesi\/","title":{"rendered":"Ba\u011fdat Besmaya 1,500 MW Kombine \u00c7evrim Elektrik Santralinde \u0130lk GTG 11 ate\u015flenmesi"},"content":{"rendered":"<p>Son d\u00f6nemde ENKA Besmaya ekibi, 1,500 MW Ba\u011fdat Besmaya Kombine \u00c7evrim Elektrik Santrali Projesinde a\u015fa\u011f\u0131da belirtilen kritik aktiviteleri ba\u015far\u0131yla tamamlam\u0131\u015ft\u0131r:<\/p>\n<p>\u2022 14 Aralik 2016 tarihinde ilk Gaz T\u00fcrbini Jenerat\u00f6r\u00fc 11 (GTG 11) ate\u015flenmi\u015ftir<br \/>\n\u2022 19 Aralik 2016 tarihinde GTG 11&#8217;de ba\u015far\u0131l\u0131 \u015fekilde senkronizasyon sa\u011flanm\u0131\u015ft\u0131r<br \/>\n\u2022 19 Aralik 2016 tarihinde GTG 11&#8217;de ilk y\u00fckleme ger\u00e7ekle\u015ftirilmi\u015ftir.<\/p>\n<p>ENKA Besmaya ekibi Aral\u0131k 2016 bitmeden \u00f6nce GTG 12\u2019de ilk ate\u015flemeyi ger\u00e7ekle\u015ftirmeyi planlamaktad\u0131r.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Son d\u00f6nemde ENKA Besmaya ekibi, 1,500 MW Ba\u011fdat Besmaya Kombine \u00c7evrim Elektrik Santrali Projesinde a\u015fa\u011f\u0131da belirtilen kritik aktiviteleri ba\u015far\u0131yla tamamlam\u0131\u015ft\u0131r: \u2022 14 Aralik 2016 tarihinde ilk Gaz T\u00fcrbini Jenerat\u00f6r\u00fc 11 (GTG 11) ate\u015flenmi\u015ftir \u2022 19 Aralik 2016 tarihinde GTG 11&#8217;de ba\u015far\u0131l\u0131 \u015fekilde senkronizasyon sa\u011flanm\u0131\u015ft\u0131r \u2022 19 Aralik 2016 tarihinde GTG 11&#8217;de ilk y\u00fckleme ger\u00e7ekle\u015ftirilmi\u015ftir. ENKA <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/bagdat-besmaya-1500-mw-kombine-cevrim-elektrik-santralinde-ilk-gtg-11-ateslenmesi\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":25,"featured_media":44991,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[623],"tags":[],"class_list":["post-44996","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-enerji-santralleri"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/44996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=44996"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/44996\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/44991"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=44996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=44996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=44996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}