{"id":58945,"date":"2019-02-28T14:13:33","date_gmt":"2019-02-28T11:13:33","guid":{"rendered":"https:\/\/www.enka.com\/?p=58945"},"modified":"2020-06-02T12:02:15","modified_gmt":"2020-06-02T09:02:15","slug":"irak-umm-qasr-limani-5-nolu-rihtim-insaati-deniz-isleri-projesinde-26-tamamlanma-oranina-ulasilmistir","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/irak-umm-qasr-limani-5-nolu-rihtim-insaati-deniz-isleri-projesinde-26-tamamlanma-oranina-ulasilmistir\/","title":{"rendered":"Irak Umm QASR Liman\u0131, 5 nolu R\u0131ht\u0131m \u0130n\u015faat\u0131 &#038; Deniz \u0130\u015fleri Projesi\u2019nde % 26 tamamlanma oran\u0131na ula\u015f\u0131lm\u0131\u015ft\u0131r"},"content":{"rendered":"<p style=\"margin: 0cm 0cm 7.5pt; text-align: left;\">2019 \u015eubat ay\u0131 sonu itibar\u0131yla ENKA\u2019n\u0131n Um Kasr Liman\u0131, 5 nolu R\u0131ht\u0131m \u0130n\u015faat\u0131 ve Deniz \u0130\u015fleri projesinde m\u00fchendislik, tasar\u0131m, sat\u0131n alma, in\u015faat faaliyetleri de dahil olmak \u00fczere tamamlanan i\u015flerin toplam ilerlemesi %26 oran\u0131nda olmu\u015ftur.<\/p>\n<p style=\"margin: 0cm 0cm 7.5pt; text-align: left;\"><span style=\"font-size: 11.0pt; font-family: 'Arial',sans-serif; background: white;\">Proje Detaylar\u0131:<a href=\"https:\/\/www.enka.com\/tr\/portfolio-item\/umm-qasr-basra-cok-amacli-terminal-konteyner-terminal-sahasi\/\">Irak Umm QASR Liman\u0131, 5 nolu R\u0131ht\u0131m \u0130n\u015faat\u0131 &amp; Deniz \u0130\u015fleri <\/a> <\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2019 \u015eubat ay\u0131 sonu itibar\u0131yla ENKA\u2019n\u0131n Um Kasr Liman\u0131, 5 nolu R\u0131ht\u0131m \u0130n\u015faat\u0131 ve Deniz \u0130\u015fleri projesinde m\u00fchendislik, tasar\u0131m, sat\u0131n alma, in\u015faat faaliyetleri de dahil olmak \u00fczere tamamlanan i\u015flerin toplam ilerlemesi %26 oran\u0131nda olmu\u015ftur. Proje Detaylar\u0131:Irak Umm QASR Liman\u0131, 5 nolu R\u0131ht\u0131m \u0130n\u015faat\u0131 &amp; Deniz \u0130\u015fleri &nbsp;<\/p>\n","protected":false},"author":29,"featured_media":58942,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[621],"tags":[13693,13643,13788,13789,13790,13646,13655,13791],"class_list":["post-58945","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-altyapi-ve-madencilik","tag-ummqasr-tr","tag-basra-tr","tag-construction-tr","tag-design-tr","tag-engineering-tr","tag-iraq-tr","tag-marineworks-tr","tag-procurement-tr"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/58945","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=58945"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/58945\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/58942"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=58945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=58945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=58945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}