{"id":60178,"date":"2019-04-26T14:13:20","date_gmt":"2019-04-26T11:13:20","guid":{"rendered":"https:\/\/www.enka.com\/?p=60178"},"modified":"2020-04-28T11:59:09","modified_gmt":"2020-04-28T08:59:09","slug":"irak-umm-qasr-limani-5-nolu-rihtim-insaati-deniz-isleri-proje-gelisimi","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/irak-umm-qasr-limani-5-nolu-rihtim-insaati-deniz-isleri-proje-gelisimi\/","title":{"rendered":"Irak Umm QASR Liman\u0131, 5 nolu R\u0131ht\u0131m \u0130n\u015faat\u0131 &#038; Deniz \u0130\u015fleri Proje Geli\u015fimi"},"content":{"rendered":"<p>ENKA\u2019n\u0131n Umm Qasr Liman\u0131 \u00c7ok Ama\u00e7l\u0131 Terminal, Konteyner Terminal Sahas\u0131 5, r\u0131ht\u0131m Duvar\u0131 ve Deniz \u0130\u015fleri projesi t\u00fcm h\u0131z\u0131yla devam etmektedir.\u00a023 Nisan 2019 itibar\u0131yla, deniz dibinin yakla\u015f\u0131k 1.200.000 m<sup>3<\/sup>\u2019l\u00fck taranmas\u0131 i\u015flemi tamamlanm\u0131\u015f olup, r\u0131ht\u0131m temelinin ilk s\u0131ra dolgu i\u015flemine ba\u015flanm\u0131\u015ft\u0131r.<\/p>\n<p>Proje toplamda %35,54 tamamlanma oran\u0131na ula\u015fm\u0131\u015f, 1.147 adet beton blok imalat\u0131 ger\u00e7ekle\u015fmi\u015f, 752.294 insan-saat ve 303 i\u015f g\u00fcn\u00fc kaza olmaks\u0131z\u0131n s\u00fcrd\u00fcr\u00fclmektedir.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ENKA\u2019n\u0131n Umm Qasr Liman\u0131 \u00c7ok Ama\u00e7l\u0131 Terminal, Konteyner Terminal Sahas\u0131 5, r\u0131ht\u0131m Duvar\u0131 ve Deniz \u0130\u015fleri projesi t\u00fcm h\u0131z\u0131yla devam etmektedir.\u00a023 Nisan 2019 itibar\u0131yla, deniz dibinin yakla\u015f\u0131k 1.200.000 m3\u2019l\u00fck taranmas\u0131 i\u015flemi tamamlanm\u0131\u015f olup, r\u0131ht\u0131m temelinin ilk s\u0131ra dolgu i\u015flemine ba\u015flanm\u0131\u015ft\u0131r. Proje toplamda %35,54 tamamlanma oran\u0131na ula\u015fm\u0131\u015f, 1.147 adet beton blok imalat\u0131 ger\u00e7ekle\u015fmi\u015f, 752.294 insan-saat ve <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/irak-umm-qasr-limani-5-nolu-rihtim-insaati-deniz-isleri-proje-gelisimi\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":29,"featured_media":60175,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[621],"tags":[13693,13644],"class_list":["post-60178","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-altyapi-ve-madencilik","tag-ummqasr-tr","tag-enkaconstruction-tr"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/60178","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=60178"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/60178\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/60175"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=60178"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=60178"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=60178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}