{"id":68132,"date":"2020-08-14T16:22:12","date_gmt":"2020-08-14T13:22:12","guid":{"rendered":"https:\/\/www.enka.com\/250-mw-combined-cycle-power-plant-for-pjsc-kazanorgsintez\/"},"modified":"2022-02-10T12:58:38","modified_gmt":"2022-02-10T09:58:38","slug":"kazanorgsintez-250-mw-kombine-cevrim-santrali","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/kazanorgsintez-250-mw-kombine-cevrim-santrali\/","title":{"rendered":"Kazanorgsintez 250 MW Kombine \u00c7evrim Santrali"},"content":{"rendered":"<p style=\"text-align: justify;\"><div class=\"clearfix\" style=\"height: 10px\"><\/div>ENKA, konsorsiyum orta\u011f\u0131 Siemens ile beraber, Rusya\u2019n\u0131n Tataristan b\u00f6lgesinin ba\u015fkenti Kazan\u2019daki Kazanorgsintez 250 MW Kombine \u00c7evrim Santrali yap\u0131m\u0131 kapsam\u0131nda 2020 Haziran ay\u0131 itibar\u0131yla saha ofisine yerle\u015fmi\u015ftir.<\/p>\n<p style=\"text-align: justify;\">Halihaz\u0131rda ge\u00e7ici kamp ve mobilizasyon \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda, civil i\u015flerin %90\u2019\u0131 tamamlanm\u0131\u015f olup, mekanik ve elektrik altyap\u0131 ba\u011flant\u0131 i\u015fleri yan\u0131nda mutfak, i\u015f\u00e7i yatakhanesi bina montajlar\u0131 devam etmektedir. Proje malzemelerinin sat\u0131nalmas\u0131 i\u015f program\u0131na uygun olarak ilerlemektedir.<\/p>\n<p style=\"text-align: justify;\">Siemens taraf\u0131ndan getirilecek olan gaz t\u00fcrbini ve buhar t\u00fcrbini yan\u0131nda, ENKA kapsam\u0131nda olan, uzun temin s\u00fcreli ana ekipmanlardan 1 adet kazan, 3 adet gaz komperes\u00f6r\u00fc, 1 adet \u201cnatural draft\u201d so\u011futma kulesi ile gaz ar\u0131tma \u00fcnitelerinin sipari\u015fleri verilmi\u015ftir. Beyaz Rusya merkezli Tatbel enstit\u00fcs\u00fc taraf\u0131ndan devam ettirilen design \u00e7al\u0131\u015fmalar\u0131n\u0131n yan\u0131nda Agustos ay\u0131 ba\u015f\u0131 itibar\u0131yla sahada 8 adet test kaz\u0131\u011f\u0131 \u00e7ak\u0131lm\u0131\u015f olup ve testleri devam etmektedir.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ENKA, konsorsiyum orta\u011f\u0131 Siemens ile beraber, Rusya\u2019n\u0131n Tataristan b\u00f6lgesinin ba\u015fkenti Kazan\u2019daki Kazanorgsintez 250 MW Kombine \u00c7evrim Santrali yap\u0131m\u0131 kapsam\u0131nda 2020 Haziran ay\u0131 itibar\u0131yla saha ofisine yerle\u015fmi\u015ftir. Halihaz\u0131rda ge\u00e7ici kamp ve mobilizasyon \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda, civil i\u015flerin %90\u2019\u0131 tamamlanm\u0131\u015f olup, mekanik ve elektrik altyap\u0131 ba\u011flant\u0131 i\u015fleri yan\u0131nda mutfak, i\u015f\u00e7i yatakhanesi bina montajlar\u0131 devam etmektedir. Proje malzemelerinin sat\u0131nalmas\u0131 <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/kazanorgsintez-250-mw-kombine-cevrim-santrali\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":26,"featured_media":68130,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[623],"tags":[14136,13644,14224,14150,14084,14210,14010],"class_list":["post-68132","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-enerji-santralleri","tag-elektriksantrali","tag-enkaconstruction-tr","tag-kazanorgsintez-tr","tag-powerplant-tr","tag-russia-tr","tag-siemens-tr","tag-tatarstan-tr"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/68132","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=68132"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/68132\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/68130"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=68132"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=68132"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=68132"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}