{"id":69652,"date":"2020-11-25T13:30:51","date_gmt":"2020-11-25T10:30:51","guid":{"rendered":"https:\/\/www.enka.com\/enka-in-libya\/"},"modified":"2023-02-01T16:35:04","modified_gmt":"2023-02-01T13:35:04","slug":"enka-libya-projeleri","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/enka-libya-projeleri\/","title":{"rendered":"ENKA Libya Projeleri"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 10px\"><\/div>\n<p>ENKA, end\u00fcstriyel ve enerji santralleri, bina ve kritik altyap\u0131 i\u015fleri ba\u015fta olmak \u00fczere mega projeler ger\u00e7ekle\u015ftirerek, Libya&#8217;da 48 y\u0131ld\u0131r faaliyet g\u00f6stermektedir. ENKA, \u00fclke genelinde 3 enerji santrali, 24 kentsel geli\u015fim ve konut, 6 altyap\u0131, \u00e7imento ve ar\u0131tma tesisleri dahil 24 end\u00fcstriyel proje tamamlam\u0131\u015ft\u0131r. ENKA\u2019n\u0131n bu projeleri ba\u015far\u0131l\u0131 bir \u015fekilde teslim edebilmesinin alt\u0131nda, son derece sert ve zorlu iklim ko\u015fullar\u0131 ile yetersiz altyap\u0131s\u0131 olan b\u00f6lgelerde \u00fcstlendi\u011fi i\u015flerden kazand\u0131\u011f\u0131 deneyim ve tecr\u00fcbe yatmaktad\u0131r.<\/p>\n<p>ENKA bu g\u00fcnlerde 1.321 MW kapasiteli yeni enerji santrallerinin hayata ge\u00e7irilmesi i\u00e7in gerekli g\u00f6r\u00fc\u015fmeleri y\u00fcr\u00fctmektedir.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ENKA, end\u00fcstriyel ve enerji santralleri, bina ve kritik altyap\u0131 i\u015fleri ba\u015fta olmak \u00fczere mega projeler ger\u00e7ekle\u015ftirerek, Libya&#8217;da 48 y\u0131ld\u0131r faaliyet g\u00f6stermektedir. ENKA, \u00fclke genelinde 3 enerji santrali, 24 kentsel geli\u015fim ve konut, 6 altyap\u0131, \u00e7imento ve ar\u0131tma tesisleri dahil 24 end\u00fcstriyel proje tamamlam\u0131\u015ft\u0131r. ENKA\u2019n\u0131n bu projeleri ba\u015far\u0131l\u0131 bir \u015fekilde teslim edebilmesinin alt\u0131nda, son derece sert <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/enka-libya-projeleri\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":29,"featured_media":69699,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[625],"tags":[14358,14317,14320,13665,14312,14318,14313,14319,14314,13681,14315,13647,14316],"class_list":["post-69652","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-genel","tag-elektriksantralleri-2-tr","tag-aritmatesisleri","tag-binaprojeleri","tag-buildingworks-tr","tag-cementplant-tr","tag-cimentofabrikalari","tag-desalinationplant-tr","tag-endustriyeltesisler","tag-industrialplant-tr","tag-infrastructure-tr","tag-libya-tr","tag-powerplants-tr","tag-urbandevelopment-tr"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/69652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=69652"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/69652\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/69699"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=69652"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=69652"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=69652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}