{"id":73653,"date":"2021-10-18T15:13:13","date_gmt":"2021-10-18T12:13:13","guid":{"rendered":"https:\/\/www.enka.com\/the-contract-was-signed-for-the-prefabricate-install-and-erect-all-piping-systems-of-the-power-island-at-hinkley-point-c-nuclear-power-station\/"},"modified":"2023-02-01T16:06:14","modified_gmt":"2023-02-01T13:06:14","slug":"hinkley-point-nukleer-enerji-santralinin-turbin-adasindaki-tum-borulama-sistemlerinin-prefabrikasyonu-ve-montaji-isleri-icin-sozlesme-imzalanmistir","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/hinkley-point-nukleer-enerji-santralinin-turbin-adasindaki-tum-borulama-sistemlerinin-prefabrikasyonu-ve-montaji-isleri-icin-sozlesme-imzalanmistir\/","title":{"rendered":"Hinkley Point N\u00fckleer Enerji Santrali\u2019nin t\u00fcrbin adas\u0131ndaki t\u00fcm borulama sistemlerinin prefabrikasyonu ve montaj\u0131 i\u015fleri i\u00e7in s\u00f6zle\u015fme imzalanm\u0131\u015ft\u0131r"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 10px\"><\/div>ENKA \u0130n\u015faat ve Sanayi A.\u015e.\u2019nin bir i\u015ftiraki olan ENKA UK Construction Ltd. \u015firketi, Hinkley Point N\u00fckleer Enerji Santrali\u2019nin t\u00fcrbin adas\u0131ndaki t\u00fcm borulama sistemlerinin prefabrikasyonu ve montaj\u0131 i\u015flerini \u00fcstlenmek i\u00e7in ana m\u00fcteahhitlerden biri ile s\u00f6zle\u015fme imzalam\u0131\u015ft\u0131r.<\/p>\n<p>S\u00f6zle\u015fme, y\u00fcksek bas\u0131n\u00e7l\u0131 (HP) borular\u0131n kurulumunu ve montaj\u0131n\u0131 ve t\u00fcrbin adas\u0131 ile ili\u015fkili orta bas\u0131n\u00e7l\u0131 (IP) ve d\u00fc\u015f\u00fck bas\u0131n\u00e7l\u0131 (LP) boru sistemlerinin prefabrikasyonunu, teslimat\u0131n\u0131, kurulumunu ve montaj\u0131n\u0131 ve devreye alma yard\u0131m\u0131n\u0131n sa\u011flanmas\u0131n\u0131 i\u00e7ermektedir.<\/p>\n<p>Hinkley Point C, \u0130ngiltere&#8217;nin Somerset b\u00f6lgesinde yap\u0131m\u0131 devam etmekte olan iki EPR reakt\u00f6r\u00fcne sahip 3.200 MW&#8217;l\u0131k bir n\u00fckleer enerji santralidir. Birle\u015fik Krall\u0131k&#8217;ta 20 y\u0131l\u0131 a\u015fk\u0131n bir s\u00fcredir in\u015fa edilen ilk yeni n\u00fckleer santraldir. Nihai yat\u0131r\u0131m karar\u0131 ve in\u015faat\u0131n ba\u015flamas\u0131 2016 y\u0131l\u0131n\u0131n ikinci yar\u0131s\u0131nda ger\u00e7ekle\u015fmi\u015ftir.<\/p>\n<p>GE, d\u00fcnyan\u0131n en b\u00fcy\u00fck buhar jenerat\u00f6r\u00fc olan Arabelle t\u00fcrbinini ve di\u011fer kritik ekipmanlar\u0131n\u0131 i\u00e7eren HPC i\u00e7in iki konvansiyonel t\u00fcrbin adas\u0131n\u0131 tedarik etmektedir.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ENKA \u0130n\u015faat ve Sanayi A.\u015e.\u2019nin bir i\u015ftiraki olan ENKA UK Construction Ltd. \u015firketi, Hinkley Point N\u00fckleer Enerji Santrali\u2019nin t\u00fcrbin adas\u0131ndaki t\u00fcm borulama sistemlerinin prefabrikasyonu ve montaj\u0131 i\u015flerini \u00fcstlenmek i\u00e7in ana m\u00fcteahhitlerden biri ile s\u00f6zle\u015fme imzalam\u0131\u015ft\u0131r. S\u00f6zle\u015fme, y\u00fcksek bas\u0131n\u00e7l\u0131 (HP) borular\u0131n kurulumunu ve montaj\u0131n\u0131 ve t\u00fcrbin adas\u0131 ile ili\u015fkili orta bas\u0131n\u00e7l\u0131 (IP) ve d\u00fc\u015f\u00fck bas\u0131n\u00e7l\u0131 (LP) <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/hinkley-point-nukleer-enerji-santralinin-turbin-adasindaki-tum-borulama-sistemlerinin-prefabrikasyonu-ve-montaji-isleri-icin-sozlesme-imzalanmistir\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":26,"featured_media":73648,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[623],"tags":[13644,14097,14545],"class_list":["post-73653","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-enerji-santralleri","tag-enkaconstruction-tr","tag-enkainsaat-tr-2","tag-hinkleypointc-tr"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/73653","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=73653"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/73653\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/73648"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=73653"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=73653"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=73653"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}