{"id":74187,"date":"2022-01-05T11:18:33","date_gmt":"2022-01-05T08:18:33","guid":{"rendered":"https:\/\/www.enka.com\/the-progress-of-kazan-250-mw-ccpp-project-as-of-december-2021\/"},"modified":"2023-02-01T16:00:16","modified_gmt":"2023-02-01T13:00:16","slug":"kazan-250-mw-elektrik-santrali-projesinin-aralik-2021-itibariyla-ilerlemesi","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/kazan-250-mw-elektrik-santrali-projesinin-aralik-2021-itibariyla-ilerlemesi\/","title":{"rendered":"Kazan 250 MW Elektrik Santrali projesinin Aral\u0131k 2021 itibar\u0131yla ilerlemesi"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 10px\"><\/div>31 Aral\u0131k 2021 itibar\u0131yla, ENKA\u2019n\u0131n Rusya Federasyonu\u2019na ba\u011fl\u0131 Tataristan b\u00f6lgesinde, Siemens ile konsorsiyum olarak yap\u0131m\u0131n\u0131 \u00fcstlendi\u011fi Kazan 250 MW Kombine \u00c7evrim Elektrik Santrali projesinin tasar\u0131m, sat\u0131n alma ve in\u015faat i\u015fleri dahil genel ilerleme oran\u0131 %41 iken, projede in\u015faat i\u015flerinin ilerlemesi %30\u2019a ula\u015fm\u0131\u015ft\u0131r.<\/p>\n<p>Projede \u00e7al\u0131\u015fan say\u0131s\u0131 712 olup, kay\u0131p zamanl\u0131 kazas\u0131z 2.230.000 insan-saat \u00e7al\u0131\u015fma s\u00fcresine ula\u015f\u0131lm\u0131\u015ft\u0131r.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>31 Aral\u0131k 2021 itibar\u0131yla, ENKA\u2019n\u0131n Rusya Federasyonu\u2019na ba\u011fl\u0131 Tataristan b\u00f6lgesinde, Siemens ile konsorsiyum olarak yap\u0131m\u0131n\u0131 \u00fcstlendi\u011fi Kazan 250 MW Kombine \u00c7evrim Elektrik Santrali projesinin tasar\u0131m, sat\u0131n alma ve in\u015faat i\u015fleri dahil genel ilerleme oran\u0131 %41 iken, projede in\u015faat i\u015flerinin ilerlemesi %30\u2019a ula\u015fm\u0131\u015ft\u0131r. Projede \u00e7al\u0131\u015fan say\u0131s\u0131 712 olup, kay\u0131p zamanl\u0131 kazas\u0131z 2.230.000 insan-saat \u00e7al\u0131\u015fma s\u00fcresine ula\u015f\u0131lm\u0131\u015ft\u0131r.<\/p>\n","protected":false},"author":29,"featured_media":74184,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[623],"tags":[14136,14097,14150,14084,14375,14210,14390,14010],"class_list":["post-74187","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-enerji-santralleri","tag-elektriksantrali","tag-enkainsaat-tr-2","tag-powerplant-tr","tag-russia-tr","tag-rusya-2-tr","tag-siemens-tr","tag-tataristan-2-tr","tag-tatarstan-tr"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/74187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=74187"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/74187\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/74184"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=74187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=74187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=74187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}