{"id":79992,"date":"2023-04-18T16:31:28","date_gmt":"2023-04-18T13:31:28","guid":{"rendered":"https:\/\/www.enka.com\/stade-lng-project\/"},"modified":"2023-05-12T11:13:16","modified_gmt":"2023-05-12T08:13:16","slug":"stade-lng-projesi","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/stade-lng-projesi\/","title":{"rendered":"Stade LNG Projesi"},"content":{"rendered":"<p style=\"text-align: justify;\"><div class=\"clearfix\" style=\"height: 10px\"><\/div>\u015eirketimizin, %100&#8217;\u00fcne sahip oldu\u011fu i\u015ftiraki Entrade GmbH&#8217;in T\u00e9cnicas Reunidas ve FCC ile olu\u015fturdu\u011fu konsorsiyum, Hanseatic Energy Hub \u015firketi ile Almanya&#8217;n\u0131n Hamburg \u015fehrindeki Stade nehir liman\u0131nda in\u015fa edilecek S\u0131v\u0131la\u015ft\u0131r\u0131lm\u0131\u015f Do\u011fal Gaz (LNG) Yeniden Gazla\u015ft\u0131rma Terminali i\u00e7in bir EPC (M\u00fchendislik, Tedarik ve \u0130n\u015faat) s\u00f6zle\u015fmesi imzalam\u0131\u015ft\u0131r.<\/p>\n<p style=\"text-align: justify;\">Y\u0131ll\u0131k nominal 13,3 milyar m<sup>3<\/sup> kapasiteye sahip olacak terminalin tamamlanmas\u0131 45 ay s\u00fcrecektir. S\u00f6zle\u015fme bedeli 1 milyar Euro olup Entrade GmbH&#8217;in pay\u0131 yakla\u015f\u0131k %25&#8217;tir. \u00d6n haz\u0131rl\u0131k ve m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131n\u0131n yap\u0131laca\u011f\u0131 5 ayl\u0131k ilk faz\u0131 takiben, i\u015fveren taraf\u0131ndan al\u0131nacak nihai yat\u0131r\u0131m karar\u0131 ile birlikte ikinci faz olan ana i\u015flerin yap\u0131m\u0131na ba\u015flan\u0131lmas\u0131 planlanmaktad\u0131r.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u015eirketimizin, %100&#8217;\u00fcne sahip oldu\u011fu i\u015ftiraki Entrade GmbH&#8217;in T\u00e9cnicas Reunidas ve FCC ile olu\u015fturdu\u011fu konsorsiyum, Hanseatic Energy Hub \u015firketi ile Almanya&#8217;n\u0131n Hamburg \u015fehrindeki Stade nehir liman\u0131nda in\u015fa edilecek S\u0131v\u0131la\u015ft\u0131r\u0131lm\u0131\u015f Do\u011fal Gaz (LNG) Yeniden Gazla\u015ft\u0131rma Terminali i\u00e7in bir EPC (M\u00fchendislik, Tedarik ve \u0130n\u015faat) s\u00f6zle\u015fmesi imzalam\u0131\u015ft\u0131r. Y\u0131ll\u0131k nominal 13,3 milyar m3 kapasiteye sahip olacak terminalin tamamlanmas\u0131 45 ay <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/stade-lng-projesi\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":26,"featured_media":79987,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[622],"tags":[],"class_list":["post-79992","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-petrol-gas-ve-petrokimya"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/79992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=79992"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/79992\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/79987"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=79992"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=79992"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=79992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}