{"id":81445,"date":"2023-06-19T13:59:35","date_gmt":"2023-06-19T10:59:35","guid":{"rendered":"https:\/\/www.enka.com\/progress-works-on-dradenau-combined-heat-and-power-plant-project\/"},"modified":"2023-07-14T13:29:21","modified_gmt":"2023-07-14T10:29:21","slug":"dradenau-kombine-isi-ve-enerji-santrali-projesinin-ilerlemesi-3","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/dradenau-kombine-isi-ve-enerji-santrali-projesinin-ilerlemesi-3\/","title":{"rendered":"Dradenau Kombine Is\u0131 ve Enerji Santrali Projesinin \u0130lerlemesi"},"content":{"rendered":"<p style=\"text-align: justify;\"><div class=\"clearfix\" style=\"height: 10px\"><\/div>Uniper ile yap\u0131m\u0131n\u0131 Almanya\u2019da \u00fcstlendi\u011fimiz Dradenau Kombine Is\u0131 ve Enerji Santrali projemizin konfig\u00fcrasyonu 2x2x1 olup; 2 adet Siemens SGT-800 gaz t\u00fcrbini, 1 adet buhar t\u00fcrbini, 2 adet at\u0131k \u0131s\u0131 buhar kazan\u0131 (HRSG) ve 1 adet gaz ile \u00e7al\u0131\u015fan buhar kazan\u0131ndan olu\u015fmaktad\u0131r. Tesisin kapasitesi 180 MW elektrik \u00fcretimi ve 260 MW \u0131s\u0131 \u00fcretimini\u00a0i\u00e7erecektir. Proje ilerleme kaydetmekte olup, m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131 %73 oran\u0131nda tamamlanm\u0131\u015ft\u0131r. Kaz\u0131k \u00e7akma i\u015fleri neredeyse bitmek \u00fczere olup %90 oran\u0131nda tamamlanm\u0131\u015ft\u0131r. Ayr\u0131ca, sat\u0131n alma paketlerinin de\u011ferinin %66&#8217;s\u0131 taahh\u00fct edilmi\u015ftir ve bu da projenin ba\u015far\u0131s\u0131n\u0131 sa\u011flama konusundaki g\u00fc\u00e7l\u00fc kararl\u0131l\u0131\u011f\u0131m\u0131z\u0131 g\u00f6stermektedir.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Uniper ile yap\u0131m\u0131n\u0131 Almanya\u2019da \u00fcstlendi\u011fimiz Dradenau Kombine Is\u0131 ve Enerji Santrali projemizin konfig\u00fcrasyonu 2x2x1 olup; 2 adet Siemens SGT-800 gaz t\u00fcrbini, 1 adet buhar t\u00fcrbini, 2 adet at\u0131k \u0131s\u0131 buhar kazan\u0131 (HRSG) ve 1 adet gaz ile \u00e7al\u0131\u015fan buhar kazan\u0131ndan olu\u015fmaktad\u0131r. Tesisin kapasitesi 180 MW elektrik \u00fcretimi ve 260 MW \u0131s\u0131 \u00fcretimini\u00a0i\u00e7erecektir. Proje ilerleme kaydetmekte <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/dradenau-kombine-isi-ve-enerji-santrali-projesinin-ilerlemesi-3\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":26,"featured_media":81442,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[623],"tags":[14781],"class_list":["post-81445","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-enerji-santralleri","tag-enkainsaat-uniper-powerplant-tr"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/81445","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=81445"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/81445\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/81442"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=81445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=81445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=81445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}