{"id":88660,"date":"2025-12-02T16:09:40","date_gmt":"2025-12-02T13:09:40","guid":{"rendered":"https:\/\/www.enka.com\/first-structural-concrete-poured-at-bazian-ii-power-plant-conversion-project\/"},"modified":"2025-12-02T16:12:16","modified_gmt":"2025-12-02T13:12:16","slug":"first-concrete-poured-at-bazian-ii-power-plant-conversion-project","status":"publish","type":"post","link":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/","title":{"rendered":"First Concrete Poured at Bazian II Power Plant Conversion Project"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 20px\"><\/div>\n<p style=\"text-align: justify;\">On November 26, 2025, the first structural concrete was poured for the Administration &amp; Control Building foundation of the Bazian II Power Plant Conversion Project undertaken by ENKA in Sulaymaniyah, Iraq.<\/p>\n<p style=\"text-align: justify;\">The project involves the conversion of an existing approximately 490 MW simple cycle power plant into a high-efficiency 740MW combined cycle power plant.<\/p>\n<p style=\"text-align: justify;\">The upgraded Bazian II Power Plant is expected to deliver increased power output and improved thermal efficiency without requiring additional fuel input, contributing to the sustainable energy development of the region. The facility will be fully integrated with the existing infrastructure and connected to the national power grid.<\/p>\n<p style=\"text-align: justify;\">This project marks a significant step toward meeting the growing electricity demand in the region while enhancing energy efficiency and environmental performance.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On November 26, 2025, the first structural concrete was poured for the Administration &amp; Control Building foundation of the Bazian II Power Plant Conversion Project undertaken by ENKA in Sulaymaniyah, Iraq. The project involves the conversion of an existing approximately 490 MW simple cycle power plant into a high-efficiency 740MW combined cycle power plant. The <a class=\"more-link\" href=\"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":26,"featured_media":88661,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[623],"tags":[],"class_list":["post-88660","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-enerji-santralleri"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.9 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marina Suer\"\/>\n\t<meta name=\"google-site-verification\" content=\"UQ-k7hcOVZluZene7_iGgI7iewEm4fFqYkW4KY9-n28\" \/>\n\t<meta name=\"p:domain_verify\" content=\"61890147e937e076e1c5dfdd6aeed81a\" \/>\n\t<meta name=\"yandex-verification\" content=\"5d2561526cb84137\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.9\" \/>\n\n\t\t<!-- Google tag (gtag.js) -->\n<script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-NQHTTC6MQB\"><\/script>\n<script>\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-NQHTTC6MQB');\n<\/script>\n\t\t<meta property=\"og:locale\" content=\"tr_TR\" \/>\n\t\t<meta property=\"og:site_name\" content=\"ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"First Concrete Poured at Bazian II Power Plant Conversion Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/\" \/>\n\t\t<meta property=\"fb:admins\" content=\"334532790084532\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-12-02T13:09:40+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-12-02T13:12:16+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/enkaconstruction\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@ENKA_Cons\" \/>\n\t\t<meta name=\"twitter:title\" content=\"First Concrete Poured at Bazian II Power Plant Conversion Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#article\",\"name\":\"First Concrete Poured at Bazian II Power Plant Conversion Project | ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"headline\":\"First Concrete Poured at Bazian II Power Plant Conversion Project\",\"author\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/author\\\/marina-suer\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/for_web.jpg\",\"width\":1024,\"height\":580},\"datePublished\":\"2025-12-02T16:09:40+03:00\",\"dateModified\":\"2025-12-02T16:12:16+03:00\",\"inLanguage\":\"tr-TR\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#webpage\"},\"articleSection\":\"Enerji Santralleri, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/category\\\/enerji-santralleri\\\/#listItem\",\"name\":\"Enerji Santralleri\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/category\\\/enerji-santralleri\\\/#listItem\",\"position\":2,\"name\":\"Enerji Santralleri\",\"item\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/category\\\/enerji-santralleri\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#listItem\",\"name\":\"First Concrete Poured at Bazian II Power Plant Conversion Project\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#listItem\",\"position\":3,\"name\":\"First Concrete Poured at Bazian II Power Plant Conversion Project\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/category\\\/enerji-santralleri\\\/#listItem\",\"name\":\"Enerji Santralleri\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/#organization\",\"name\":\"ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"ENKA, T\\u00fcrkiye\\u2019nin en b\\u00fcy\\u00fck in\\u015faat \\u015firketi olmakla beraber, 1982 y\\u0131l\\u0131ndan bu yana ENR En \\u0130yi Uluslararas\\u0131 M\\u00fcteahhitler aras\\u0131nda yer almaktad\\u0131r.\",\"url\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/\",\"telephone\":\"+902123761000\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/enka-icon-112x112-1.png\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#organizationLogo\",\"width\":112,\"height\":112},\"image\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/enka_insaat_official\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCtdqyCnE1uZiCkl3Luedj6Q\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/enka\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/author\\\/marina-suer\\\/#author\",\"url\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/author\\\/marina-suer\\\/\",\"name\":\"Marina Suer\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#authorImage\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/litespeed\\\/avatar\\\/50188eb6d3885a73938aa5e877d3ae80.jpg?ver=1783088688\",\"width\":96,\"height\":96,\"caption\":\"Marina Suer\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#webpage\",\"url\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/\",\"name\":\"First Concrete Poured at Bazian II Power Plant Conversion Project | ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"inLanguage\":\"tr-TR\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/author\\\/marina-suer\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/author\\\/marina-suer\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.enka.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/for_web.jpg\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#mainImage\",\"width\":1024,\"height\":580},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\\\/#mainImage\"},\"datePublished\":\"2025-12-02T16:09:40+03:00\",\"dateModified\":\"2025-12-02T16:12:16+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/\",\"name\":\"ENKA \\u0130n\\u015faat ve Sanayi A.\\u015e.\",\"description\":\"ENKA, T\\u00fcrkiye\\u2019nin en b\\u00fcy\\u00fck in\\u015faat \\u015firketi olmakla beraber, 1982 y\\u0131l\\u0131ndan bu yana ENR En \\u0130yi Uluslararas\\u0131 M\\u00fcteahhitler aras\\u0131nda yer almaktad\\u0131r.\",\"inLanguage\":\"tr-TR\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.enka.com\\\/tr\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"First Concrete Poured at Bazian II Power Plant Conversion Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"","canonical_url":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"UQ-k7hcOVZluZene7_iGgI7iewEm4fFqYkW4KY9-n28","p:domain_verify":"61890147e937e076e1c5dfdd6aeed81a","yandex-verification":"5d2561526cb84137","miscellaneous":"&lt;!-- Google tag (gtag.js) --&gt;\n&lt;script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-NQHTTC6MQB\"&gt;&lt;\/script&gt;\n&lt;script&gt;\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-NQHTTC6MQB');\n&lt;\/script&gt;"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#article","name":"First Concrete Poured at Bazian II Power Plant Conversion Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","headline":"First Concrete Poured at Bazian II Power Plant Conversion Project","author":{"@id":"https:\/\/www.enka.com\/tr\/author\/marina-suer\/#author"},"publisher":{"@id":"https:\/\/www.enka.com\/tr\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2025\/12\/for_web.jpg","width":1024,"height":580},"datePublished":"2025-12-02T16:09:40+03:00","dateModified":"2025-12-02T16:12:16+03:00","inLanguage":"tr-TR","mainEntityOfPage":{"@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#webpage"},"isPartOf":{"@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#webpage"},"articleSection":"Enerji Santralleri, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.enka.com\/tr\/#listItem","position":1,"name":"Home","item":"https:\/\/www.enka.com\/tr\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/tr\/category\/enerji-santralleri\/#listItem","name":"Enerji Santralleri"}},{"@type":"ListItem","@id":"https:\/\/www.enka.com\/tr\/category\/enerji-santralleri\/#listItem","position":2,"name":"Enerji Santralleri","item":"https:\/\/www.enka.com\/tr\/category\/enerji-santralleri\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#listItem","name":"First Concrete Poured at Bazian II Power Plant Conversion Project"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/tr\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#listItem","position":3,"name":"First Concrete Poured at Bazian II Power Plant Conversion Project","previousItem":{"@type":"ListItem","@id":"https:\/\/www.enka.com\/tr\/category\/enerji-santralleri\/#listItem","name":"Enerji Santralleri"}}]},{"@type":"Organization","@id":"https:\/\/www.enka.com\/tr\/#organization","name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"ENKA, T\u00fcrkiye\u2019nin en b\u00fcy\u00fck in\u015faat \u015firketi olmakla beraber, 1982 y\u0131l\u0131ndan bu yana ENR En \u0130yi Uluslararas\u0131 M\u00fcteahhitler aras\u0131nda yer almaktad\u0131r.","url":"https:\/\/www.enka.com\/tr\/","telephone":"+902123761000","logo":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2015\/07\/enka-icon-112x112-1.png","@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#organizationLogo","width":112,"height":112},"image":{"@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#organizationLogo"},"sameAs":["https:\/\/www.instagram.com\/enka_insaat_official\/","https:\/\/www.youtube.com\/channel\/UCtdqyCnE1uZiCkl3Luedj6Q","https:\/\/www.linkedin.com\/company\/enka"]},{"@type":"Person","@id":"https:\/\/www.enka.com\/tr\/author\/marina-suer\/#author","url":"https:\/\/www.enka.com\/tr\/author\/marina-suer\/","name":"Marina Suer","image":{"@type":"ImageObject","@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#authorImage","url":"https:\/\/www.enka.com\/wp-content\/litespeed\/avatar\/50188eb6d3885a73938aa5e877d3ae80.jpg?ver=1783088688","width":96,"height":96,"caption":"Marina Suer"}},{"@type":"WebPage","@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#webpage","url":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/","name":"First Concrete Poured at Bazian II Power Plant Conversion Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","inLanguage":"tr-TR","isPartOf":{"@id":"https:\/\/www.enka.com\/tr\/#website"},"breadcrumb":{"@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#breadcrumblist"},"author":{"@id":"https:\/\/www.enka.com\/tr\/author\/marina-suer\/#author"},"creator":{"@id":"https:\/\/www.enka.com\/tr\/author\/marina-suer\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.enka.com\/wp-content\/uploads\/2025\/12\/for_web.jpg","@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#mainImage","width":1024,"height":580},"primaryImageOfPage":{"@id":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/#mainImage"},"datePublished":"2025-12-02T16:09:40+03:00","dateModified":"2025-12-02T16:12:16+03:00"},{"@type":"WebSite","@id":"https:\/\/www.enka.com\/tr\/#website","url":"https:\/\/www.enka.com\/tr\/","name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","description":"ENKA, T\u00fcrkiye\u2019nin en b\u00fcy\u00fck in\u015faat \u015firketi olmakla beraber, 1982 y\u0131l\u0131ndan bu yana ENR En \u0130yi Uluslararas\u0131 M\u00fcteahhitler aras\u0131nda yer almaktad\u0131r.","inLanguage":"tr-TR","publisher":{"@id":"https:\/\/www.enka.com\/tr\/#organization"}}]},"og:locale":"tr_TR","og:site_name":"ENKA \u0130n\u015faat ve Sanayi A.\u015e.","og:type":"article","og:title":"First Concrete Poured at Bazian II Power Plant Conversion Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e.","og:url":"https:\/\/www.enka.com\/tr\/first-concrete-poured-at-bazian-ii-power-plant-conversion-project\/","fb:admins":"334532790084532","article:published_time":"2025-12-02T13:09:40+00:00","article:modified_time":"2025-12-02T13:12:16+00:00","article:publisher":"https:\/\/www.facebook.com\/enkaconstruction\/","twitter:card":"summary_large_image","twitter:site":"@ENKA_Cons","twitter:title":"First Concrete Poured at Bazian II Power Plant Conversion Project | ENKA \u0130n\u015faat ve Sanayi A.\u015e."},"aioseo_meta_data":{"post_id":"88660","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"created":"2025-12-02 13:09:57","updated":"2025-12-04 11:38:01","ai":null,"seo_analyzer_scan_date":null},"acf":[],"_links":{"self":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/88660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/comments?post=88660"}],"version-history":[{"count":0,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/posts\/88660\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media\/88661"}],"wp:attachment":[{"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/media?parent=88660"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/categories?post=88660"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enka.com\/tr\/wp-json\/wp\/v2\/tags?post=88660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}