Trakya Natural Gas Combined Cycle Power Plant uses natural gas coming from Russian Federation through the pipeline passing from Bulgaria. Detailed project description of the power plant are as follow:
Turn-key construction and erection of 6×100 MW combined cycle gas power plant (4×100 MW gas turbines and 2×100 MW steam turbines) in consortium with BBC-Mannheim. ENKA being responsible for all parts of the project except turbine and generator supply and basic design. An Extension to the existing 6×100 MW combined cycle power station. 4 BBC GTG’s, 4 CMI HRSG’s, 2 BBC STG’s.