
Being syncronized as of May 17, 2021, at 05:30 am on Monday; ENKA Power Adapazarı Plant has been put into operation in the Electricity Market.
The units of the plant were successfully put into operation without any problems, thanks to the long-term protection measures and regular controls applied meticulously during its 27 months of suspension.