CRUDE SHIPMENT CAPACITY PROJECT

CLIENT

Tengizchevroil LLP

CONTRACTOR

Senimdi Kurylys LLP (Bechtel-ENKA JV)

SECTOR

Oil, Gas & Petrochemicals

LOCATION

Tengiz, Kazakhstan

SCOPE OF WORK

Engineering, Procurement, Construction

PROJECT DURATION

July 2014 – December 2019

Project Description

In July 2014, Senimdi Kurylys LLP, founded by ENKA-Bechtel JV, was awarded the contract encompassing the engineering, procurement, construction and pre-commissioning works for the Crude Shipment Capacity (CSC) project of Tengizchevroil LLP. The project is to provide additional storage and export capabilities through the addition of new crude oil storage tanks, switching manifolds and export pumps together with all their associated piping systems, utilities and control systems. The work performed within the scope of the CSC project included the following:

Crude Shipment Capacity Project – Offshore Contract (1206904)

The contract encompassed the engineering and offshore procurement activities for CSC Project.

Crude Shipment Capacity Project – Onshore Contract (1134328)

The contract encompassed the onshore procurement and construction activities for the CSC project that were required to provide Tengizchevroil’s existing Crude Tank Farm with additional storage and export capabilities through the addition of new crude oil storage tanks (3 x 50,000 m3 floating roof and 1 x 30,000 m3 fixed roof), switching manifolds and export pumps, along with all their associated piping systems, utilities and control systems. The project aimed to establish an optimal crude tank farm and export system, so that the existing and planned volumes of crude could be delivered to the Caspian Pipeline Consortium and Crude Rail Loading without any loss of product quality or interruption in availability.

Key Quantities

ITEM UoM GREENFIELD BROWNFIELD
Reinforced Concrete 7,100 1,900
Manhole / Valve Box ea 718
Excavation 231,500 3,700
Import Fill 163,000 2,900
Gravel Roads m 3,800 550
Fireproofing 4,400
Structural Steel te 780 50
Cladding 1,300
Modular Buildings 650
Piping Erection te 1,300 750
Piping Insulation m 8,400 4,800
HDPE Piping m 7,000
Mechanical Equipment no 54
Tanks Plate te 4,500
Tanks Painting 46,000
Equipment Insulation 250
Electrical Equipment no 378
Electrical Cabling m 114,500 30,700
Electrical Cable Tray m 13,300
Earthing m 7,800
Heat Tracing m 9,600
Instruments ea 439
Instrument Cabling m 100,800 12,450
Instrument Cable Tray m 4,400 1,650
Junction Boxes ea 65 25
Tubing m 380 60

Gallery

Related Projects

Low Carbon Hydrogen Production Plant (HPP1)

Low Carbon Hydrogen Production Plant (HPP1)

Current Oil, Gas & Petrochemicals United Kingdom
Propylene Splitter Unit Project – İzmit & İzmir Refineries

Propylene Splitter Unit Project – İzmit & İzmir...

Current Oil, Gas & Petrochemicals TÜRKİYE
Stade Liquefied Natural Gas (LNG) Regasification Terminal

Stade Liquefied Natural Gas (LNG) Regasification Terminal

Current Germany Oil, Gas & Petrochemicals
West Qurna I Produced Water 2 Facility

West Qurna I Produced Water 2 Facility

Completed Iraq Oil, Gas & Petrochemicals