• 001

FGP 3GP Mechanical, Electrical & Instrumentation Installation Works

Senimdi Kurylys LLP, founded by ENKA İnşaat ve Sanayi A.Ş. and Bechtel Inc. with equal shares has been awarded a contract for mechanical, electrical and instrumentation installation works in Tengiz, Kazakhstan.

The Client is Tengizchevroil (TCO), which operates and develops Tengiz oil field, a joint venture (JV) with shares owned by Chevron (50%), ExxonMobil (25%), KazMunayGas (20%) and LukArco (5%).

Contract commenced in May 2018 with a project duration of 45 months.

The project will increase the Tengiz oil field’s annual oil production capacity by an additional 12 million tonnes.

The project will be constructed using a modularized construction strategy with modules constructed both at Kazakh coastal fabrication yards and at other fabrication yards in Europe / Far East.

Project Description

FGP 3GP Mechanical, Electrical & Instrumentation Installation Works

Project Features

Scope of Work
Mechanical, Electrical & Instrumentation Installation Works
Client
Tengizchevroil (TCO)
Project Duration
Start Date18.05.2018
Finish Date01.01.2022
Duration45 Months

Location

Tengiz / Kazakhstan
ENKA SCOPE OF SERVICES

The project covers the construction works related with the crude processing plant, module stacking, sour water stripper and utilities areas.

Gallery

Related Projects

Morava Corridor Motorway

Morava Corridor Motorway

Current Infrastructure...
Produced Water Treatment Facility

Produced Water Treatment...

Basrah Current Iraq Oil,...
FGP – Wellhead Pressure Management Project – Core Substation ME&I Installation

FGP – Wellhead...

Completed Kazakhstan...
Civil, Mechanical, Electrical, Pre-Com&Commissioning Works on EPC-3 Island

Civil, Mechanical,...

Completed Kazakhstan...