FGP – Cargo Transportation Route Channel Works of Caspian Sea

FGP – Cargo Transportation Route Channel Dredging Works – Prorva Access Channel:

ENKA was awarded the contract by Van Oord on 1 October 2014. It involves the execution of works for Van Oord in the context of their dredging activities for TenizServis LLP / Chevron.

Within the scope of this project, Van Oord is dredging a channel below sea level to facilitate marine logistic support for TenizService LLP / Chevron’s future growth projects in the Tengiz Oil Field.

Chevron is successfully producing oil from the Tengiz field, which is located on the Caspian shore of Kazakhstan. Its Future Growth Project aims to double the rate of production.

The Cargo Transportation Route Channel Project serves as a route for transporting pre-fabricated pipe rack modules for use in the construction works of the Future Growth Project. Once these construction works are over, it is to become a trade point.

The subcontract and the related works commenced on 1 October 2014 and were successfully completed on 31 December 2017.

Project Description

FGP – Cargo Transportation Route Channel Dredging Works – Prorva Access Channel

    Project Features

    Scope of Work
    Dredging Activities
    Client
    Van Oord Dredging and Marine Contractors Kazakhstan Branch
    Project Duration
    Start Date 01.10.2014
    Finish Date 31.12.2017
    Duration 39 Months

    Location

    Kashagan, East Caspian Sea, Kazakhstan
    ENKA SCOPE OF SERVICES

    ENKA’s responsibilities under the contract mainly consist of vessel chartering, provision of office/accommodation premises and equipment support to Van Oord.

    As part of the Cargo Transportation Route Channel Project (FGP), ENKA had completed supply of the 31 ea mooring piles & 24 ea Donut fenders and 18 ea of these supplied piles (16 ea mooring piles & 2 ea Vessel Traffic Management System platform piles) were installed at 4 ea waiting places which are allocated along the channel.

    In addition, ENKA supplied and installed offshore mooring structures under the contract, which required extensive know-how in the area of offshore construction works.

    FGP – Marine Installation Works (Mooring Piles, Fenders and Communication Platforms) – Prorva Access Channel:

    ENKA was awarded this contract by TenizService LLP on 23 June 2017. It involves the execution of construction activities (Mooring Piles, Donut Fenders,Communication Platforms and Prorva Access Channel) for TenizService LLP/Chevron.

    Project Description

    FGP – Marine Installation Works (Mooring Piles, Fenders and Communication Platforms) – Prorva Access Channel

      Project Features

      Scope of Work
      Construction
      Client
      TenizService LLP / Chevron
      Key Quantities
      Mooring Piles 450 tons
      Offshore Platforms (VTM) 24 tons
      Mooring Pile Filling Material 900 tons
      Donut Fenders 371 tons
      Navigation Aids (Buoy) 255 Each
      Project Duration
      Start Date 23.06.2017
      Finish Date 30.06.1018
      Duration 12 Months
      ENKA SCOPE OF SERVICES

      ENKA’s responsibilities under the contract consist of mobilization and demobilization of piling and lifting equipment and associated support equipment and marine vessels.

      Morever, the contact comprises of the piling installation of 12 mooring piles in prorva turning basin, installation of 24 fenders in the turning basin and waiting places along the channel, and installation of 2 communication platforms at KP10 and KP37 waiting places surveys, project management, engineering, accommodation and services for client and others.

      In addition to above mentioned base scope, several additional scope of works performed by ENKA such as;
      • Onshore storage, assembling and deployment of 255 ea Navigational aids along the Marine Channel
      • Marine Channel Bathymetric Survey
      • Marine Channel Environmental Monitoring Survey
      • Modification of VTM Platforms

      Related Projects

      FGP – Wellhead Pressure Management Project – Core Substation ME&I Installation

      FGP – Wellhead...

      Completed Kazakhstan...
      Civil, Mechanical, Electrical, Pre-Com&Commissioning Works on EPC-3 Island

      Civil, Mechanical,...

      Completed Kazakhstan...
      FGP – Cargo Transportation Route Channel Works of Caspian Sea

      FGP – Cargo...

      Completed Kazakhstan...
      FGP 3GP Mechanical, Electrical & Instrumentation Installation Works

      FGP 3GP Mechanical,...

      Current Kazakhstan Oil,...