• 01

BAZIAN-II POWER PLANT CONVERSION PROJECT

CLIENT

Taurus Arm for Power Generation

CONTRACT TYPE

Lump Sum, Turn-key

SECTOR

Power Plants

LOCATION

Sulaymaniyah, Iraq

PROJECT DURATION

July 2025 – February 2028

Project Description

ENKA has signed a lump sum turnkey contract with Taurus Arm for Power Generation for the conversion of the existing Bazian power plant into a combined cycle facility, located in Sulaymaniyah, Iraq.

The project involves the conversion of an existing approximately 490 MW@23degC simple cycle power plant – currently operating with two General Electric 9F gas turbines using natural gas and fuel oil – into a high-efficiency 740@23degC  MW combined cycle power plant. The scope includes the addition of two unfired heat recovery steam generators (HRSGs), one steam turbine generator, W-type air-cooled condenser (ACC), Steam Turbine Generator Step Up Transformer 285 MVA@45DegC, and all associated auxiliaries and balance of plant (BoP) systems. This ACC is the first and biggest W-type air-cooled condenser(ACC) in Iraq.

The upgraded Bazian II Power Plant is expected to deliver increased power output and improved thermal efficiency without requiring additional fuel input, contributing to the sustainable energy development of the region. The facility will be fully integrated with the existing infrastructure and connected to the national power grid.

This project marks a significant step toward meeting the growing electricity demand in the region while enhancing energy efficiency and environmental performance.

ENKA Scope of Services

The project will be executed on a lump sum turnkey basis. Under the terms of the contract, ENKA is responsible for the planning, design, detailed engineering, procurement, construction, installation, interconnection, pre-commissioning, commissioning, start-up, performance testing, and final handover of the upgraded facility to the Owner.

As part of the contract, ENKA will also provide training for the owner’s operation and maintenance personnel and prepare comprehensive operation and maintenance manuals to ensure the plant’s long-term, safe, and reliable performance.