• 01
  • 02

ENKA KIRKLARELİ ELEKTRİK ÜRETİM A.Ş. 852 MW NATURAL GAS COMBINED CYCLE POWER PLANT

CLIENT

ENKA Kırklareli Elektrik Üretim A.Ş.

CONTRACT TYPE

Engineering, Procurement, Construction & Commissioning (EPCC)

SECTOR

Power Plants

LOCATION

Kırklareli, Türkiye

PROJECT DURATION

November 2022 – March 2026

Project Description

ENKA Kırklareli Elektrik Üretim A.Ş. has undertaken the construction of the 852 MW Kırklareli Natural Gas Combined Cycle Power Plant located in Kırklareli city in Türkiye as its own investment.

The power plant utilizes advanced combined cycle technology featuring the GE 9HA.02 gas turbine and hydrogen cooled generator (H78), 1 D650 steam turbine and air-cooled generator (A78), 1 triple pressure reheat heat recovery steam generator (HRSG) to be supplied by GE, 1 air cooled condenser (ACC), 1 gas regulating metering station (RMS) and all associated equipment and systems.

Operating at full capacity, the plant is expected to meet the annual electricity consumption of approximately 2.5 million households.

Key Quantities

Earthworks1.3 million m3
Structural Concrete72,000 m3
Structural Steel6,350 tons
Sandwich Panel Façade Cladding17,000 m2
Sandwich Panel Roof Cladding15,500 m2
Piping1,300 tons
Cable Trays and Cable Ducts52 km
Cable Installation900 km

Gallery

Related Projects

Temane 456 MW Independent Power Plant

Temane 456 MW Independent Power Plant

Current Mozambique Power Plants
Bazian II Power Plant Conversion Project

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/enkacom/public_html/wp-includes/functions.php on line 5481