RIVERSIDE TOWERS – SWISSOTEL KRASNYE HOLMY

CLIENT

Moskva Krasnye Holmy

SCOPE OF WORK

Turn-key Engineering, Procurement, Construction (Civil Works only)

SECTOR

Building Works

LOCATION

Moscow, the Russian Federation

PROJECT DURATION

 April 2003 – July 2005

Project Description

Opened in September 2005, the 235-room hotel Swissotel Krasnye Holmy, is one of the most recent additions to Riverside Towers Business Center. With its slim, circular-shaped tower and its antenna reaching a height of 160 meters, the hotel is one of Central Moscow’s tallest buildings. The hotel’s interior design is a grand flourish of contemporary style, well be-fitting Moscow’s new image.

The 35-storey high-rise takes full advantage of its height to afford its spacious rooms and suites with clear views of Moscow. The rooftop bar, named City Space, commands a breathtaking 360-degree panorama. In addition, the hotel hosts one more bar, an all-day dining restaurant, meeting and conference rooms, a full-floor banqueting facility, a health club with spa and swimming pool, as well as a dedicated business lounge for its executive guests.

The state of the art room management system as well as high speed and wireless telecom facilities make the guests stay pleasant and comfortable. The building’s automation, fire protection and security systems surpass the highest international standards. A large state-of-the-art conference center is located next to the hotel main building. The main ballroom is big enough to host events for up to 550 people, a dedicated elevator is specially designed to exhibit cars and sailboats. The conference-center has its own full kitchen to please its guests with fine cuisine.

ENKA completed the turnkey construction of the hotel, which has a total construction area of 33,000 mwithin 26 months, including the installation of furniture, fixtures and equipment. The structure of the building is reinforced concrete with a foundation sitting on piles. The façade system is a combination of aluminum composite panel cladding granite and stainless steel.

Unique Challenges

Swissotel Krasnye Holmy, as the first high-rise building of its kind in Moscow’s city center, required the relevant authorities, for the first time with this project, to develop and issue special specifications and requirements.

ENKA Scope of Services

Design

  • Civil Working Design
  • Architectural and Finishing Working Design
  • Façade
  • Mechanical Working Design
  • Electrical Working Design
  • Interior Design

Procurement and Logistics

  • Local Procurement
  • International Procurement & Logistics

Construction

  • Civil Works
  • Architectural and Finishing Works
  • Façade Works
  • Mechanical Works
  • Electrical Works
  • Interior Works
    • Public Areas FF&E
    • Hotel Rooms FF&E
    • Pool & SPA Centre
    • Bars & Restaurants
    • Kitchen & Laundry Equipments

Significant Features and Accomplishments

  • First high rise building over 100 meters in the center of Moscow

Key Quantities

Total Construction Area 34,162 m²
Total Floors 35
Maximum Height 160 m
Reinforced Concrete 22,875 m3
Façade 33,881 m²

Gallery

Related Projects

ENKA Tuzla Data Center

ENKA Tuzla Data Center

Building Works Current TÜRKİYE
Shotton Paper Mill

Shotton Paper Mill

Building Works Current United Kingdom
Ovchinnikovskaya Multifunctional Business Complex

Ovchinnikovskaya Multifunctional Business Complex

Building Works Completed Russian Federation
Yandex Headquarters

Yandex Headquarters

Building Works Current Russian Federation