In addition to meeting the demands of the Turkish market in the renewable energy sector, ENKA’s subsidiary Çimtaş Steel has managed to raise the bar even higher in 2021 with 71,750 tons, by breaking the production record of 2020.
The total number of wind tower parts produced in the two fabrication shops located in Gemlik and Gölcük are increased to 1,050 pieces. 80% of the production was exported to various European countries. Çimtaş Gemlik also renewed its own tower production record with 38,500 tons, thanks to the improvement works carried out.
120 wind turbine towers, consist of 545 pieces, were manufactured at the Gemlik facility for the German companies Nordex and Enercon. The new facility within Çimtaş Module & Shipyard, located in Kocaeli Free Zone, which became operational in the 3rd quarter of 2020, made a significant contribution to this record with its full capacity and tower production of 30,350 tons.