GENERAL MOTORS NEW CAR ASSEMBLY PLANT

CLIENT

General Motors

SCOPE OF WORK

Turn-key Engineering, Procurement, Construction

SECTOR

Building Works

LOCATION

St. Petersburg, Russian Federation

PROJECT DURATION

May 2007 – September 2008

Project Description

General Motors Assembly Plant, located in St. Petersburg’s Sushary Region, is an investment with a production capacity of 98,000 cars per year with 3 full time shifts. The plant was constructed on the industrial zone of Sushary Region on a Greenfield basis. The construction of the facility was initiated in May 2007, completed in 17 months and handed over in September 2008.

The plant in St. Petersburg produces Chevrolet Captiva SUVs and a new generation of compact cars. Production started in November of 2008. The plant operates according to General Motors’ global manufacturing system to ensure the highest levels of quality.

Every stage of the project development, design and construction took place in close collaboration with the St. Petersburg city authorities who provided support to ENKA. The initial design of the plant was carried out by General Motors engineering division but the entire detailed design was completed by ENKA.

ENKA Scope of Services

The plant is constructed on a 391,000 m2 plot of land and has a covered area of 72,000 m2. The plant has four major process shops, mainly paint shop, body shop, general assembly and central utility shop and a 2,800 madministration building. Due to the high ground water elevation, the plant rests on concrete driven piles, pile caps acting as column footings. The roof consists of a 24 m x 24 m structural steel truss system supported by prefabricated columns.

The complete electrical and mechanical utility system and heating, ventilation and air conditioning system were also installed, together with a large-scale building automation system.

Key Quantities

Total Floor Area 72,000 m²
Excavation 198,000 m3
Piling 69,000 m
Concrete 31,000 m3
Rebar steel 4,700 tons
Structural steel 2,400 tons
Roofing 56,000 m2
Wall cladding 32,000 m2
Ground-slab hardening 56,000 m2
Infrastructure piping 9,000 m
Cabling 125,000 m
Landscaping 83,000 m2
Roads and parking areas 45,000 m2

Related Projects

Shotton Paper Mill

Shotton Paper Mill

Building Works Current United Kingdom
Ovchinnikovskaya Multifunctional Business Complex

Ovchinnikovskaya Multifunctional Business Complex

Building Works Completed Russian Federation
Yandex Headquarters

Yandex Headquarters

Building Works Current Russian Federation
High-Technological Multifunctional Medical Complex

High-Technological Multifunctional Medical Complex

Building Works Current Russian Federation