Kemerköy Thermal Power Plant

Construction works, steel structure fabrication and erection works for 3×210 MW units of coal fired power plant. The construction works include mainly Boiler, Turbine and Bunker Buildings, coal supply system, water supply and treatment system, 380 kV and 154 kV switchyard, ash and slag handling system and other auxiliary and service buildings. Construct ion of a 135 m. long pier on steel piles, 16 km highway connection, housing colony, ash and clean water dams and off-shore sea water intake were also included in the scope of the contract. The stack within ash and slag handling system is 300 m high and was constructed by sliding forms.

Project Description

3×210 MW Kemerköy Thermal Power Plant Units 1-2-3

  • Engineering
  • Procurement
  • Construction

Project Features

Scope of Work
Engineering, Procurement, Construction
Client
Turkish Electricity Authority – TEK
Key Quantities
Excavation 7,000,000 m³
Reinforcing steel 30,000 t
Formwork 800,000 m²
Concrete 520,000 m³
Steel structure fabrication 20,200 t
Steel structure erection 20,200 t
Underground steel piping (Dia. 2,500 mm) 4,500 t
Project Duration
Start Date 01.09.1984
Finish Date 01.06.1985
Duration 9 Months

Location

Muğla, Turkey

Gallery

Related Projects

Samawa 750 MW Combined Cycle Power Plant

Samawa 750 MW Combined...

Current Iraq Power Plants...
Baghdad Besmaya 1,500 MW Combined Cycle Power Plant

Baghdad Besmaya 1,500...

Baghdad Completed Featured...
Sulaymaniyah 1,500 MW CC Power Plant Conversion

Sulaymaniyah 1,500...

Completed Featured Projects...
Duhok 1,500 MW CC Power Plant Conversion

Duhok 1,500 MW CC...

Completed Duhok Featured...