The turn-key contract was awarded to ENKA by Masterfoods (USA) in 1994, for the construction of the 30,000 sqm Mars Confectionery Plant. Located in Stupino, 120 km south of Moscow, the plant occupies a 40 ha plot.

The project included the construction of the snack food plant, office building, energy block, warehouses, wastewater treatment plant, oil tanks, drainage systems, external utilities, roads, parking areas and landscaping, as well as the erection of 500 tons of processing equipment.

Project Description

Mars Confectionery Plant

  • Turn-key Engineering
  • Procurement
  • Construction

Project Features

Scope of Work
Turn-key Engineering, Procurement, Construction
Client
A/O Masterfoods
Key Quantities
Excavation 55,000 m³
Concrete 9,000 m³
Hollow Core Slabs 4,500 m²
Steel Structure 2,200 tons
Wall Cladding 21,000 m²
Roofing 22,000 m²
Utility Piping 32.000 m
Cabling 155,000 m
Refrigeration Plant 2,300 kW
Water Treatment Plant 18 m³/h
Waste Water Treatment Plant 160 m³/h
Boiler Plant Erection 2×15 t/h
Process Equipment Erection 500 tons
Total Floor Area 27,000 m2
Project Duration
Start Date 01.06.1994
Finish Date 01.07.1995
Duration 13 Months

Location

Moscow, Russian Federation
ENKA SCOPE OF SERVICES

ENKA completed the project within 13 months in 1995. Additional contracts were signed in 2001 for the turn-key construction of extension phases, comprising a nut processing plant, a packaging building and a warehouse, with a total construction area of 15,000 m2.

Gallery

Related Projects

Toyota Car Assembly Plant

Toyota Car Assembly...

C_Industrial Plants Completed...
Philip Morris Izhora Cigarette Factory

Philip Morris Izhora...

C_Industrial Plants Completed...
İzmir Shipyard Commandership East Dock

İzmir Shipyard Commandership...

C_Industrial Plants Completed...
Messebo Cement Factory

Messebo Cement Factory

Addis Ababa C_Industrial...