• 01
  • foto

NIZHNEKAMSK 495 MW COMBINED CYCLE POWER PLANT

CLIENT

PJSC Nizhnekamskneftekhim, a member of TAIF Group

SCOPE OF WORK

Engineering, Procurement, Construction, Start-Up and Commissioning

SECTOR

Power Plants

LOCATION

Nizhnekamsk, Tatarstan, Russian Federation

PROJECT DURATION

December 2017 – October 2022

Project Description

ENKA and Siemens entered into a consortium agreement for the project on January 12th, 2017 to undertake the construction of the Nizhnekamsk Combined Cycle Gas Turbine Thermal Power Plant (CCGT-TPP) awarded by Nizhnekamskneftekhim under a contract dated December 18th, 2017.

The plant is constructed in the industrial hub in the southeast of the city of Nizhnekamsk, on the left bank of the Kama River in the Republic of Tatarstan in the Russian Federation.

The contract of the project on the basis of EPC included engineering, manufacturing, delivery to site, erection and painting works, operation, commissioning, start-up and testing of the plant.

The plant has a configuration of 2 gas turbines, 1 steam turbine and 2 heat recovery steam generators (HRSGs). The main fuel is natural gas, whereas the associated gas derivatives (syngas) that are by-products of Nizhnekamskneftekhim’s production processes are also used as fuel.

Nizhnekamsk 495 MW Combined Cycle Gas Turbine Thermal Power Plant (CCGT-TPP) Project received the “Distinction” award at the International Safety Awards competition organized by the British Safety Council and honored with the “Best in Country” and “Power & Utility Sector Winner” awards and also was selected as “Award of Merit” winner in ENR’s 2021 Global Best Projects competition.

ENKA Scope of Services

The works were performed on an engineering, procurement and construction (EPC) basis. They included engineering, manufacturing, deliveries to site, erection and painting works and the operation, commissioning, start-up and testing of the plant.

Key Quantities

Erection of perimeter wall 1,160 m
Reinforced concrete 26,500 m3
Erection of structural steel 5,442 tons
Installation of above-ground piping 850 tons
Installation of underground piping 177 tons
Facade and roof cladding work 34,500 m²
Assembly of HRSG modules 12 ea (2,414 tons)

Gallery

Related Projects

Temane 456 MW Independent Power Plant

Temane 456 MW Independent Power Plant

Current Mozambique Power Plants
Bazian-II Power Plant Conversion Project

Bazian-II Power Plant Conversion Project

Current Iraq Power Plants