The project included the engineering, procurement, and turn-key construction of a residential complex with 1,455 dwelling units including social and technical buildings and the furnishing thereof, together with the complete infrastructure. The project also included a 30 MW central heating plant, school, trade center, shopping center and social center with indoor swimming pool.

1,455 Housing Units in 13 Months


The Slonim Housing Project is one of the project packages offered to bidding to provide housing for Soviet officers repatriated from former East Germany.

Project Description

Slonim Military Housing

  • Turn-Key Engineering
  • Procurement
  • Construction

Project Features

Scope of Work
Turn-key Engineering, Procurement, Construction
Client
Ministry of Defence Housing Department / Vneshstrojimport
Key Quantities
Total Floor Area191,800 m²
Excavation1,500,000 m3
Filling450,000 m3
Concrete110,000 m3
Formwork500,000 m²
Reinforcement16,500 tons
Precast Elements13,250 pcs.
Screed150,000 m²
Linoleum Floor20,000 m²
Ceramic Floor23,000 m²
Painting420,000 m²
Gypsum Board Partitions83,000 m²
Bricklaying47,500 m²
Plastering50,000 m²
Glazed Tile40,000 m²
Wall Paper176,000 m²
Doors & Windows14,000 + 11,500 pcs.
Parquet Floor71,000 m²
Terrazzo Tiling7,800 m²
Roads57,000 m²
Pedestrian Ways21,000 m²
Infrastructure Pipes28,000 m.
Infrastructure Cables69,000 m.
Project Duration
Start Date01.10.1991
Finish Date01.12.1992
Duration13 Months

Location

Minsk, Belo Russia
ENKA SCOPE OF SERVICES
The primary elements of the project included the following activities:

  •  1,455 housing units in 73 housing compounds of five stories each (162,000 m²)
  • A polyclinic with 150-bed capacity, a nursery for 330 children, a trade center and shopping center, a school with 33 classrooms, and a 25,000 m² social center with indoor swimming pool
  • A 4,800 m² technical building comprising the heating center, switchboard, gas regulating stations, drinking water, drainage and sewage systems, and fuel oil pumping stations
  • Infrastructure consisting of gas, heating, drinking water, sewage and drainage systems, and 10 KV, 0.4 KV, radio, telephone, fire alarm network
  • Roads
  • Landscaping
  • Interior Furnishings
SIGNIFICATION FEATURES

Successful completion of 1,455 Housing Units in 13 Months

Related Projects

The Blue City

The Blue City

Al-Sawaadi Region Building...
Harawa Housing

Harawa Housing

Building Works C_Urban...
Egorlykskaja Military Housing

Egorlykskaja Military...

Building Works C_Urban...
Sirte Bay Hotel and Conference Center

Sirte Bay Hotel and...

Building Works C_Urban...