• 001
  • 002

The 250-bed Maternity Hospital

The Maternity Hospital was constructed on a 47,500 m² area as a turn-key project with engineering, procurement, and construction basis, including the installation of the latest medical equipment and technical systems. The project was completed successfully within 24 months, as planned. The hospital was equipped with sophisticated systems, far more complicated than the standards set for its type. The design covered the characteristics required for maternity hospitals in architecture as well as in mechanical and electrical systems.

The project included the design and construction of a seven storey main and auxiliary buildings of the hospital, furthermore the works consisted of the supply & erection of medical equipment package and electro-mechanical works.

Project Description

250 Bed Maternity Hospital

  • Engineering
  • Procurement
  • Construction
  • Medical Package Supply & Installation

Project Features

Scope of Work
Engineering, Procurement, Construction, Medical Package Supply & Installation
Client
Moscow Government / Vneshstrojimport, “Grajdan-stroj”
Key Quantities
Total Floor Area 47,500 m²
Project Duration
Start Date 01.09.1991
Finish Date 01.09.1993
Duration 24 Months

Location

Moscow, Russian Federation

Related Projects

Multifunctional Medical Complex in Gelendzhik

Multifunctional Medical...

C_Public Buildings Completed...
Development of Muscat International Airport Main Contract 3

Development of Muscat...

C_Public Buildings Completed...
The Mausoleum, Mosque, Museum and Library

The Mausoleum, Mosque,...

C_Public Buildings Completed...
Presidential Palace at Libreville

Presidential Palace...

C_Public Buildings Completed...