TRIPOLI WEST 671 MW SIMPLE CYCLE POWER PLANT

CLIENT

General Electricity Company of Libya (GECOL)

SCOPE OF WORK

Lump Sum, Turn-key

SECTOR

Power Plants

LOCATION

Tripoli, Libya

PROJECT DURATION

May 2021 – June 2025

Project Description

The main contract was signed in December 2017 between the General Electricity Company of Libya (GECOL) and the consortium of Siemens Energy Global GmbH & Co. – ENKA İnşaat ve Sanayi A.Ş. (ENKA). The works within the scope of the main contract were successfully completed and handed over to the owner in January 2023.

The project was based on a power island configuration featuring 4 sets of SGT5-PAC 2000E Siemens gas turbines and turbine generators (CTG) units, providing a gross output capacity of up to 671 MW.

The plant was constructed on a lump sum turnkey basis and the scope of the consortium includes engineering, procurement, construction and commissioning to ensure the power plant operates safely and reliably under all conditions, in accordance with the terms of the EPC contract.

In addition to the main contract scope, the consortium was awarded variation orders for the engineering, procurement, construction, testing and commissioning of two 10,000 m³ light distillate oil (LDO) storage tanks in August 2022, and for the fuel gas regulating and metering station (RMS) as well as final gas filtering skids in July 2023.

The gas turbines are designed as dual-fuel units, utilizing Light Distillate Oil as the main fuel, with natural gas planned as a backup fuel for future operation.

Tripoli West 671 MW Simple Cycle Power Plant Project in Libya received the Merit Award in the Power/Industrial category in ENR’s 2023 Global Best Projects Competition

ENKA Scope of Services

ENKA’s scope of work consists of design, detailed engineering, procurement, shipment / delivery of all project materials, installation and construction, interconnection, pre-comissioning, comissioning & start-up, demonstration of parallel operation with the grid at the required net output, performance testing, training of the operating and maintenance personnel, and preparation of integrated operation and maintenance manuals according to the division of works for the power plant.

Siemens scope of supply, the simple cycle power island part of the plant is made up of 4 sets of Siemens gas turbine (SGT5-2000E), Siemens gas turbine generator (SGen5-100A), auxiliaries and mechanical systems (base module, dual fuel module, air intake structure, exhaust gas diffuser, generator cooling fin-fan cooler, lube oil fin-fan cooler, compressor cleaning unit, etc.), electrical equipment and control system (GT control system, 3 containers of power control centers, SEE/SFC transformers, CEMS unit, DCS system, etc.).

Key Quantities

Excavation 84,230 m3
Backfill 51,254 m3
Concrete 25,146 m3
Formwork44,715 m2
Rebar2,082 t
Steel Structure3,358 t
Cladding18,842 m2