Yatağan Thermal Power Plant

The project’s scope of work consisted of the architectural and structural detailed design and all civil construction, steel structure fabrication and erection works related to all buildings, facilities and infrastructure of 3×210 MW thermal power plant.

Project Description

3×210 MW Yatağan Thermal Power Plant Unit 3

  • Detailed Engineering
  • Procurement
  • Construction

Project Features

Scope of Work
Detailed Engineering, Procurement, Construction
Client
Turkish Electricity Authority – TEK
Key Quantities
Excavation1,660,000 m³
Piling (in situ)31,000 m
Reinforcing steel13,800 tons
Formwork430,000 m²
Concrete230,000 m³
Steel Structure Fab.12,100 tons
Steel Structure Erec.12,100 tons
Project Duration
Start Date01.04.1977
Finish Date01.06.1985
Duration98 Months

Location

Muğla, Turkey
ENKA SCOPE OF SERVICES

Construction works, steel structure fabrication and erection works for 3×210 MW units of coal fired power plant. The construction works include mainly Boiler, Turbine and Bunker Buildings, coal supply system, water supply and treatment system, 380 kV and 154 kV switchyard, ash and slag handling system and other auxiliary and service buildings . The stacks within ash and slag handling system are 120 m high and were constructed by sliding forms.

Gallery

Related Projects

Samawa 750 MW Combined Cycle Power Plant

Samawa 750 MW Combined...

Current Iraq Power Plants...
Baghdad Besmaya 1,500 MW Combined Cycle Power Plant

Baghdad Besmaya 1,500...

Baghdad Completed Featured...
Sulaymaniyah 1,500 MW Combined Cycle Power Plant

Sulaymaniyah 1,500...

Completed Featured Projects...
Duhok 1,500 MW CC Power Plant Conversion

Duhok 1,500 MW CC...

Completed Duhok Featured...