ENKA was awarded a contract on an EPC basis, by the General Electricity Company of Libya in April 2008 to design, supply and built a power plant project with a capacity of 2 x 285 MW in Zwitina, Libya.
The Zwitina Power Plant is designed for simple cycle operation with natural gas as a base fuel, while diesel oil is also available as backup. The plant consists of two Combustion Turbine Generators (Siemens Model SGT5-PAC4000F), each nominally rated at a capacity of 285 MW.
The overall plant design, sub-systems design and selected equipment are suitable for future conversion into a combined cycle operation.
Power island equipment (i.e., Combustion Turbine Generator packages and their auxiliary packages) were procured directly by Global Electricity Services Company while ENKA was responsible for complete plant engineering, procurement of Balance of Plant equipment and material, natural gas pipeline, as well as complete construction and erection work, commissioning and start-up.