The Kameno solar photovoltaic power plant project in Burgas, Bulgaria, being undertaken by Town Up 8 LTD, a subsidiary of ENKA, is advancing steadily.
The project, with a planned capacity of 45 MWp and an annual electricity output of 63 GWh, spans 470,000 m² and features 80,000 solar panels, 120 inverters, and 1,750 tons of steel structure.
As of November 15, 2024, the construction works is 82% complete, with steel structure installation at 98% and PV panel installation at 97%. The project achieved 277 days and 143,728 person-hours without a lost time incident.