ENKA through its local entity Senimdi Kurylys jointly established with Bechtel in November 2000 has successfully completed the Sour Gas Processing and Injection Facilities for KCO with a manpower reaching 7,500 at peak with 85% local (Kazakh) content.
During construction of SGP ENKA has achieved 18.300.000 man-hours without LTI.