BORISOW MILITARY HOUSING PROJECT

CLIENT

Ministry of Defence of the CSI, Housing Department / “Sojazwneschtrojimport”, Union of Foreign Trade Organizations

SCOPE OF WORK

Turn-key Engineering, Procurement, Construction

SECTOR

Building Works

LOCATION

Borisow, Belarus

PROJECT DURATION

July 1991 – December 1991

Project Description

ENKA carried out design and turn-key construction of a residential complex with 725 dwelling units, including social and technical buildings and the furnishing thereof with the complete infrastructure. The total floor area is 84,000 m2.

The Borisow military housing project in Belarus was the pioneering settlement within the military housing program and, as such, demanded great speed of construction. From the green field to turn-key completion took just 173 days. The project had a total construction area of 85,000 m2 and included social and technical buildings, infrastructure and a 30 MW heating center.

Borisow Housing is a fast-track project built by ENKA to provide housing for Soviet soldiers repatriated from former East Germany. 725 housing units were completed in 173 days. The project received an extensive international media attention, and marked ENKA’s successful contribution to a historic event.

ENKA Scope of Services

Within the context of rapid developments, following the unification of Germany, ENKA was determined to hand over the project on the planned arrival date of the troops. ENKA’s speed in completing the 725 apartments required intensive logistical arrangements, backed up by the network of ENKA Offices in Istanbul, Minsk, Moscow, Wiesbaden, Stockholm and London. As a result of this coordinated effort, a total of 1,510 trucks and 1,747 train wagons of equipment and materials were moved to the site. At the peak of activity, the number of workers and personnel reached 3,300. The inauguration ceremony on January 8, 1992, received extensive international media attention, and marked ENKA’s successful contribution to a historic event.

Significant Features and Accomplishments

  • Completion of 725 Units took 173 Days only

Key Quantities

Excavation 170,000 m³
Backfilling 30,000 m³
Concrete 51,000 m³
Formwork 200,000 m2
Reinforcement 3,750 tons
Screed 65,000 m2
Linoleum Floor 9,500 m2
Ceramic Floor 7,350 m2
Painting 125,800 m2
Gypsum Board Partitions 75,000 m2
Glazed Tile 14,200 m2
Wall Paper 80,500 m2
Door & Windows 5,714+9,452 pcs
Parquet Floor 36,000 m2
Roads 7,800 m2
Total Floor Area 84,000 m2

Gallery

Related Projects

ENKA Tuzla Data Center

ENKA Tuzla Data Center

Building Works Current TÜRKİYE
Shotton Paper Mill

Shotton Paper Mill

Building Works Current United Kingdom
Ovchinnikovskaya Multifunctional Business Complex

Ovchinnikovskaya Multifunctional Business Complex

Building Works Completed Russian Federation
Yandex Headquarters

Yandex Headquarters

Building Works Current Russian Federation