ENKA commenced the Multifunctional Medical Center Complex Project in Gelendzhik, Krasnodar to construct a modern medical complex within the third quarter of 2016 This is one of the fast track projects of ENKA. The contract was signed by Rosneft and ENKA on 10 October 2016.
Project’s total indoor construction area is approximately 11,495 m² and it consists of three separate buildings, including the Multifunctional Medical Centre, the Multi-flat Residential House & the New Laundry.
The Multifunctional Medical Centre was designed as a modern health complex that is to provide high quality standard healthcare services. The Medical Centre includes 28 beds, 5 VIP rooms, 1 Day-stay room and 8 intensive care units. The indoor construction area is approximately 6,082 m² and has 5 stories. The centre also has an outpatient clinic that has latest technological medical scanning systems and equipment. The façade of the building had been designed using modern materials and suitable colors in harmony with the city architecture and the nearby municipal hospital. In addition to that, materials used in the building interior design have been selected considering patients’ health and maximizing hygiene standards. With these characteristics, the building is one of the most modern complexes of SOGAZ and the city of Gelendzhik. As a part of the project, the building is connected to the main building of the city hospital via a transition gallery.
The Multi-flat Residential House building has been designed as a modern living complex, consisting of 8 stories including 1 underground car park floor and its indoor construction area is approximately 4,625 m². The building has 2 VIP flats and 42 regular flats, offices & a meeting room, a fitness center and car park area. Design of the VIP flats offers high quality living standards and maximum comfort. Standard flats were designed to provide all comforts for living needs. The fitness center is located on the ground floor and is equipped with modern fitness equipment, required for high quality fitness activities.
The New Laundry Building is located within the boundaries of the “City Hospital Complex” and is a 2-storey building. The New Laundry indoor construction area is approximately 788 m2 . The facility is equipped with modern laundry equipment and devices with a washing, drying and disinfecting capacity of 4 tons/hr. The facility had been handed over to the client and the city hospital operations team on 23 June 2017; one month earlier than the planned completion date, and is actively operational.