Dradenau Combined Heat and Power Plant project, the construction of which ENKA is carrying out with Uniper in Germany, is based on a 2x2x1 configuration equipped with two Siemens SGT-800 gas turbines, one steam turbine, and two heat recovery steam generators (HRSG) with one additional gas steam generator. The plant’s capacity will include an electrical output of 180 MW and a district heating capacity of 260 MW. The project is making progress, with engineering works reaching 73% completion. The piling works are nearly finished, standing at 90% completion. Moreover, 66% of the value of procurement packages has been committed, showcasing our strong dedication to ensuring the project’s success.